Colorado Interstate Gas Company, LLC'; Notice of Application, 45841 [2017-21059]
Download as PDF
Federal Register / Vol. 82, No. 189 / Monday, October 2, 2017 / Notices
either their approval or their
disapproval.
(B) Within 30 days of the date of this
order, parties who wish to do so may
file additional comments regarding final
confirmation and approval of
Bonneville’s proposed rates. Parties who
wish to do so may file reply comments
within 20 days thereafter.
(C) The Secretary shall promptly
publish this order in the Federal
Register.
By the Commission.
Issued: September 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21060 Filed 9–29–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–493–000]
sradovich on DSK3GMQ082PROD with NOTICES
Colorado Interstate Gas Company,
LLC’; Notice of Application
Take notice that on September 14,
2017, Colorado Interstate Gas Company,
LLC (CIG), Post Office Box 1087,
Colorado Springs, Colorado 80944, filed
in Docket No. CP17–493–000 an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) requesting an
order authorizing the abandonment of
certain facilities related to the Rawlins
Processing Plant, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to
Francisco Tarin, Director, Regulatory
Affairs, Colorado Interstate Gas
Company, LLC, P.O. Box 1087, Colorado
Springs, Colorado, 80944 at (719) 667–
7517 or Mark A. Minich, Assistant
General Counsel, Colorado Interstate
Gas Company, LLC, P.O. Box 1087,
Colorado Springs, Colorado, 80944 at
(719) 520–4416.
Specifically, CIG is requesting
approval for the abandonment in place
of the Rawlins lean oil processing and
fractionation plants, as well as natural
gas liquids truck off-loading facilities,
and natural gas liquids interconnecting
VerDate Sep<11>2014
19:01 Sep 29, 2017
Jkt 244001
facilities that tie into the Overland Pass
Pipeline Company all located in Carbon
County, Wyoming; and the
abandonment by sale of natural gas
liquids pipelines, associated natural gas
liquids measurement facilities, and
natural gas liquids rail loading facilities
to Sinclair Wyoming Refining Company.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
PO 00000
Frm 00047
Fmt 4703
Sfmt 9990
45841
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 17, 2017.
Dated; September 26, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–21059 Filed 9–29–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 82, Number 189 (Monday, October 2, 2017)]
[Notices]
[Page 45841]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21059]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-493-000]
Colorado Interstate Gas Company, LLC'; Notice of Application
Take notice that on September 14, 2017, Colorado Interstate Gas
Company, LLC (CIG), Post Office Box 1087, Colorado Springs, Colorado
80944, filed in Docket No. CP17-493-000 an application pursuant to
section 7(b) of the Natural Gas Act (NGA) requesting an order
authorizing the abandonment of certain facilities related to the
Rawlins Processing Plant, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding
the last three digits in the docket number field to access the
document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Francisco Tarin, Director, Regulatory Affairs, Colorado Interstate Gas
Company, LLC, P.O. Box 1087, Colorado Springs, Colorado, 80944 at (719)
667-7517 or Mark A. Minich, Assistant General Counsel, Colorado
Interstate Gas Company, LLC, P.O. Box 1087, Colorado Springs, Colorado,
80944 at (719) 520-4416.
Specifically, CIG is requesting approval for the abandonment in
place of the Rawlins lean oil processing and fractionation plants, as
well as natural gas liquids truck off-loading facilities, and natural
gas liquids interconnecting facilities that tie into the Overland Pass
Pipeline Company all located in Carbon County, Wyoming; and the
abandonment by sale of natural gas liquids pipelines, associated
natural gas liquids measurement facilities, and natural gas liquids
rail loading facilities to Sinclair Wyoming Refining Company.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either complete
its environmental assessment (EA) and place it into the Commission's
public record (eLibrary) for this proceeding; or issue a Notice of
Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit original and 7 copies of filings made with the Commission and
must mail a copy to the applicant and to every other party in the
proceeding. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
Web site that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 17, 2017.
Dated; September 26, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21059 Filed 9-29-17; 8:45 am]
BILLING CODE 6717-01-P