Record of Decision for the Cape Wind Energy Project, 45607-45608 [2017-20936]
Download as PDF
Federal Register / Vol. 82, No. 188 / Friday, September 29, 2017 / Notices
FOR FURTHER INFORMATION CONTACT:
Bradley Johnson, Planning &
Environmental Coordinator, telephone:
307–578–5928; address: 1002 Blackburn
Street, Cody, Wyoming 82414; email:
bbjohnson@blm.gov. Persons who use a
telecommunications device for the deaf
(TDD) may call the Federal Relay
Service (FRS) at 1–800–877–8339 to
contact Mr. Johnson during normal
business hours. The FRS is available 24
hours a day, 7 days a week, to leave a
message or question with the above
individual. You will receive a reply
during normal business hours. You may
call either of these numbers to have
your name added to the project mailing
list.
This
Notice initiates the public scoping
process for the EIS. The BLM intends to
prepare an EIS to support the decision
making for the proposed Project and
conduct a public scoping period to seek
input on the preliminary issues
identified regarding this proposal. The
Wyoming Water Development
Commission proposes to enlarge the
water storage capacity of Leavitt
Reservoir to a total capacity of 6,604
acre feet for the purposes of multiple
use that include late season irrigation,
flood attenuation and recreation. A 1.5mile sub-surface pipeline from Beaver
Creek will divert water to the reservoir
inlet via a 42-inch diameter pipeline
across private lands. A permanent subsurface transfer pipeline, approximately
three miles long, is proposed
downstream in the Beaver Creek
drainage to efficiently convey reservoir
release water to irrigation
infrastructure.The proposal area is
between the towns of Greybull and
Shell, Wyoming, in the Sixth Principal
Meridian, Wyoming, T. 54 N., R. 92 W.,
sec. 13, NW1/4SW1/4 and SW1/4SW1/
4; sec. 14, NE1/4SE1/4 and SE1/4SE1/4;
sec. 23, NE1/4NE1/4 and SE1/4NE1/4;
sec. 24, lots 3 and 4, SW1/4NW1/4, SE1/
4NW1/4, NW1/4SW1/4, NE1/4SW1/4,
and SW1/4SE1/4.
Preliminary issues include: Potential
impacts to wetlands and cultural sites
(properties), ground and surface waters,
mineral development, wildlife habitat,
and the county road right-of-way. The
BLM will identify, analyze, and require
mitigation, as appropriate, to address
the reasonably foreseeable impacts to
resources from the approval of this
Project. Mitigation may include
avoidance, minimization, rectification,
reduction or elimination over time, and
compensatory mitigation; and may be
considered at multiple scales, including
the landscape-scale.
asabaliauskas on DSKBBXCHB2PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
18:50 Sep 28, 2017
Jkt 241001
The BLM seeks resource information
and data for public land values (e.g., air
quality, cultural and historic resources,
fire/fuels, fisheries, forestry, lands and
realty, non-energy minerals and geology,
oil and gas, paleontology, rangeland
management, recreation, soil, water, and
wildlife) in the project area. As
proposed, approximately 48 percent of
the project area would take place on
BLM-managed public lands. The
proposed dam and nearly the entirety of
the expanded reservoir would reside on
BLM lands. The proposed pipeline and
borrow areas both cross or take place
nearly in their entirety on private lands.
The purpose of this request is to ensure
that the project analysis has sufficient
information and data to consider a
reasonable range of resource uses,
management options, and alternatives
for managing public lands.
Please submit information to the Cody
Field Manager at the address above. The
BLM will treat proprietary information
submissions marked as ‘‘Confidential’’
in accordance with the laws and
regulations governing the
confidentiality of such information. To
provide the public with an opportunity
to review the proposal and associated
information, as well as any proposed
plan amendments, the BLM will host
meetings before October 30, 2017. The
BLM will notify the public of meetings
and any other opportunities for the
public to be involved in the process for
this proposal at least 15 days prior to
the event. Meeting dates, locations and
times will be announced by a news
release to the media, individual
emailings, and postings on the project
Web site. The purpose of the public
scoping process is to determine relevant
issues that will influence the scope of
the environmental analysis, including
alternatives, and guide the process for
developing the EIS.
The BLM will use and coordinate the
NEPA commenting process to help
fulfill the public involvement process
under Section 106 of the National
Historic Preservation Act (NHPA) (54
U.S.C. 306108), as provided for in 36
CFR 800.2(d)(3). The information about
historic and cultural resources in the
area potentially affected by the proposal
will assist the lead agency in identifying
and evaluating impacts to such
resources in the context of both NEPA
and Section 106 of the NHPA. Native
American tribal consultations will be
conducted in accordance with policy,
and tribal concerns will be given due
consideration. Federal, state and local
agencies, along with other stakeholders
that may be interested or affected by the
BLM’s decisions on this proposal, are
invited to participate in the scoping
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
45607
process and, if eligible, may request or
be requested by the BLM to participate
as a cooperating agency.
Before including your address, phone
number, email address or other personal
identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you may ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1501.7.
Mary Jo Rugwell,
BLM Wyoming State Director.
[FR Doc. 2017–21140 Filed 9–28–17; 8:45 am]
BILLING CODE 4310–22–P
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM–2017–0059;
MMAA104000]
Record of Decision for the Cape Wind
Energy Project
Bureau of Ocean Energy
Management, Interior.
ACTION: Notice of availability of a
Record of Decision.
AGENCY:
The Bureau of Ocean Energy
Management (BOEM) is announcing the
availability of a Record of Decision
(ROD) for the Cape Wind Energy Project
Final Supplemental Environmental
Impact Statement (SEIS) in this Notice
of Availability (NOA). The SEIS was
prepared in response to a 2016 remand
order from the U.S. Court of Appeals for
the District of Columbia Circuit in
Public Employees for Environmental
Responsibility v. Hopper, 827 F.3d 1077
(D.C. Cir. 2016), in which the Court
vacated the 2009 Cape Wind Energy
Project Final Environmental Impact
Statement (EIS) and ordered BOEM to
supplement the EIS with adequate
geological surveys before Cape Wind
Associates LLC (Cape Wind) may begin
construction. The SEIS presented two
alternatives: The Proposed Action
(affirming BOEM’s issuance of the
existing lease) and the No Action
Alternative (requiring BOEM to rescind
lease issuance). BOEM has decided to
select the Proposed Action Alternative.
ADDRESSES: The ROD and associated
information are available on BOEM’s
Web site at https://www.boem.gov/
Massachusetts-Cape-Wind/.
FOR FURTHER INFORMATION CONTACT: For
more information on the ROD, you may
SUMMARY:
E:\FR\FM\29SEN1.SGM
29SEN1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
45608
Federal Register / Vol. 82, No. 188 / Friday, September 29, 2017 / Notices
contact Mr. James Bennett, Program
Manager, Office of Renewable Energy
Programs, by telephone at 703–787–
1300 or by email at james.bennett@
boem.gov.
SUPPLEMENTARY INFORMATION: On July 5,
2016, the U.S. Court of Appeals for the
District of Columbia Circuit vacated the
2009 Cape Wind Energy Project Final
EIS and ordered that BOEM:
‘‘supplement [the EIS] with adequate
geological surveys before Cape Wind
may begin construction.’’ Public
Employees for Environmental
Responsibility v. Hopper, 827 F.3d 1077,
1084 (D.C. Cir. 2016). The Court opined
that: ‘‘[w]ithout adequate geological
surveys, the [BOEM] cannot ‘ensure that
the seafloor [will be] able to support’
wind turbines.’’ Id. at 1083. While the
Court found that: ‘‘[BOEM] therefore
had violated NEPA (National
Environmental Policy Act)’’ the Court
noted that ‘‘. . . [it] does not necessarily
mean that the project must be halted or
that Cape Wind must redo the
regulatory approval process.’’ Id. at
1083–4. The Court explicitly left
undisturbed BOEM’s 2010 decision to
issue the lease and BOEM’s 2011
decision to approve the Construction
and Operations Plan (COP). Id. at 1084.
In light of the remand order and the
remaining valid lease and COP, only
two alternatives remain relevant to the
court’s remand: The Proposed Action
(affirming BOEM’s issuance of the
existing lease) and the No Action
Alternative (BOEM rescinding the
lease). In its Final SEIS, BOEM
examines the available geological survey
data, including the geotechnical data
and reports submitted to BOEM since
the 2009 Final EIS, any other relevant
data that relates to the adequacy of the
seafloor to support wind turbines in the
lease area, and considers public
comments.
On March 31, 2017, BOEM published
the Draft SEIS, in response to the
Court’s 2016 remand order discussed
above, and a NOA in the Federal
Register to announce the availability of
the Draft SEIS and initiate a 45-day
public comment period (82 FR 16060).
Comments received can be found at
https://www.regulations.gov by searching
for docket ID BOEM–2017–0008. The
Final SEIS addressed comments
received by BOEM in response to the
Draft SEIS during the 45-day comment
period. On August 4, 2017 (82 FR
36418), BOEM published a NOA
announcing the availability of the Final
SEIS in the Federal Register. The Final
SEIS can be found on BOEM’s Web site
at: https://www.boem.gov/
Massachusetts-Cape-Wind/.
VerDate Sep<11>2014
18:50 Sep 28, 2017
Jkt 241001
Authority: This notice is published
pursuant to the regulations (40 CFR part
1506.6(b)) implementing the provisions of
the National Environmental Policy Act of
1969, as amended (42 U.S.C. 4321 et seq.).
Dated: September 26, 2017.
Walter D. Cruickshank,
Acting Director, Bureau of Ocean Energy
Management.
[FR Doc. 2017–20936 Filed 9–28–17; 8:45 am]
BILLING CODE 4310–MR–P
INTERNATIONAL TRADE
COMMISSION
[Investigation No. 337–TA–1054]
Certain Height-Adjustable Desk
Platforms and Components Thereof;
Commission’s Determination Not To
Review an Initial Determination
Terminating the Investigation Based
on Settlement; Termination of the
Investigation
U.S. International Trade
Commission.
ACTION: Notice.
AGENCY:
Notice is hereby given that
the U.S. International Trade
Commission has determined not to
review the presiding administrative law
judge’s (‘‘ALJ’’) initial determination
(‘‘ID’’) (Order No. 10) terminating the
investigation based on settlement.
FOR FURTHER INFORMATION CONTACT:
Amanda Pitcher Fisherow, Esq., Office
of the General Counsel, U.S.
International Trade Commission, 500 E
Street SW., Washington, DC 20436,
telephone (202) 205–2737. Copies of
non-confidential documents filed in
connection with this investigation are or
will be available for inspection during
official business hours (8:45 a.m. to 5:15
p.m.) in the Office of the Secretary, U.S.
International Trade Commission, 500 E
Street SW., Washington, DC 20436,
telephone (202) 205–2000. General
information concerning the Commission
may also be obtained by accessing its
Internet server at https://www.usitc.gov.
The public record for this investigation
may be viewed on the Commission’s
electronic docket (EDIS) at https://
edis.usitc.gov. Hearing-impaired
persons are advised that information on
this matter can be obtained by
contacting the Commission’s TDD
terminal on (202) 205–1810.
SUPPLEMENTARY INFORMATION: The
Commission instituted this investigation
on May 4, 2017 based on a complaint,
filed on behalf of Varidesk LLC of
Coppell, Texas (‘‘complainant’’). 82 FR
20919–20 (May 4, 2017). The complaint
as supplemented alleges violations of
SUMMARY:
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
section 337 based upon the importation
into the United States, the sale for
importation, and the sale within the
United States after importation of
certain height-adjustable desk platforms
and components thereof by reason of
infringement of U.S. Patent No.
9,113,703; U.S. Patent No. 9,277,809;
and U.S. Patent No. 9,554,644. The
complaint further alleges that an
industry in the United States exists as
required by section 337. The
Commission’s notice of investigation
named Lumi Legend Corporation of
Ningbo, China; Innovative Office
Products LLC of Easton, Pennsylvania;
Ergotech Group LLC of Easton,
Pennsylvania; Monoprice, Inc. of
Rancho Cucamonga, California; and
Transform Partners LLC (dba Mount-It!)
of San Diego, California (collectively
‘‘the Lumi Legend respondents’’);
Loctek Ergonomic Technology
Corporation (formerly, Ningbo Loctek
Visual Technology Corporation of
Ningbo, China) of Ningbo, China;
Zhejiang Loctek Smart Drive
Technology Co., Ltd. of Ningbo, China;
and Loctek Inc.’s (formerly, Zoxou, Inc.
of Fremont, California) of Fremont,
California (collectively herein, ‘‘Loctek
respondents’’). The Office of Unfair
Import Investigations did not participate
in the investigation. The Lumi Legend
respondents were previously terminated
based on settlement. Order No. 5
(unreviewed, Commission Notice (July
11, 2017)).
On August 29, 2017, complainant and
the Loctek respondents filed a joint
motion to terminate the Locktek
respondents based on settlement. The
motion asserted that there are no other
agreements between complainant and
the Loctek respondents. The parties
represented ‘‘there are no other
agreements, written or oral, express or
implied, between these parties
concerning the subject matter of the
Investigation.’’ Motion at 1.
On August 31, 2017, the ALJ issued
an ID (Order No. 10) terminating the
investigation based on settlement of the
Loctek respondents. The ALJ found that
all of the requirements of Commission
rule 210.21, 19 CFR 210.21, had been
met and that there were no public
interest concerns that would weigh
against termination. No petitions for
review were filed.
The Commission has determined not
to review the subject ID and terminates
the investigation.
The authority for the Commission’s
determination is contained in section
337 of the Tariff Act of 1930, as
amended (19 U.S.C. 1337), and in part
210 of the Commission’s Rules of
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 82, Number 188 (Friday, September 29, 2017)]
[Notices]
[Pages 45607-45608]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20936]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM-2017-0059; MMAA104000]
Record of Decision for the Cape Wind Energy Project
AGENCY: Bureau of Ocean Energy Management, Interior.
ACTION: Notice of availability of a Record of Decision.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Ocean Energy Management (BOEM) is announcing the
availability of a Record of Decision (ROD) for the Cape Wind Energy
Project Final Supplemental Environmental Impact Statement (SEIS) in
this Notice of Availability (NOA). The SEIS was prepared in response to
a 2016 remand order from the U.S. Court of Appeals for the District of
Columbia Circuit in Public Employees for Environmental Responsibility
v. Hopper, 827 F.3d 1077 (D.C. Cir. 2016), in which the Court vacated
the 2009 Cape Wind Energy Project Final Environmental Impact Statement
(EIS) and ordered BOEM to supplement the EIS with adequate geological
surveys before Cape Wind Associates LLC (Cape Wind) may begin
construction. The SEIS presented two alternatives: The Proposed Action
(affirming BOEM's issuance of the existing lease) and the No Action
Alternative (requiring BOEM to rescind lease issuance). BOEM has
decided to select the Proposed Action Alternative.
ADDRESSES: The ROD and associated information are available on BOEM's
Web site at https://www.boem.gov/Massachusetts-Cape-Wind/.
FOR FURTHER INFORMATION CONTACT: For more information on the ROD, you
may
[[Page 45608]]
contact Mr. James Bennett, Program Manager, Office of Renewable Energy
Programs, by telephone at 703-787-1300 or by email at
james.bennett@boem.gov.
SUPPLEMENTARY INFORMATION: On July 5, 2016, the U.S. Court of Appeals
for the District of Columbia Circuit vacated the 2009 Cape Wind Energy
Project Final EIS and ordered that BOEM: ``supplement [the EIS] with
adequate geological surveys before Cape Wind may begin construction.''
Public Employees for Environmental Responsibility v. Hopper, 827 F.3d
1077, 1084 (D.C. Cir. 2016). The Court opined that: ``[w]ithout
adequate geological surveys, the [BOEM] cannot `ensure that the
seafloor [will be] able to support' wind turbines.'' Id. at 1083. While
the Court found that: ``[BOEM] therefore had violated NEPA (National
Environmental Policy Act)'' the Court noted that ``. . . [it] does not
necessarily mean that the project must be halted or that Cape Wind must
redo the regulatory approval process.'' Id. at 1083-4. The Court
explicitly left undisturbed BOEM's 2010 decision to issue the lease and
BOEM's 2011 decision to approve the Construction and Operations Plan
(COP). Id. at 1084. In light of the remand order and the remaining
valid lease and COP, only two alternatives remain relevant to the
court's remand: The Proposed Action (affirming BOEM's issuance of the
existing lease) and the No Action Alternative (BOEM rescinding the
lease). In its Final SEIS, BOEM examines the available geological
survey data, including the geotechnical data and reports submitted to
BOEM since the 2009 Final EIS, any other relevant data that relates to
the adequacy of the seafloor to support wind turbines in the lease
area, and considers public comments.
On March 31, 2017, BOEM published the Draft SEIS, in response to
the Court's 2016 remand order discussed above, and a NOA in the Federal
Register to announce the availability of the Draft SEIS and initiate a
45-day public comment period (82 FR 16060). Comments received can be
found at https://www.regulations.gov by searching for docket ID BOEM-
2017-0008. The Final SEIS addressed comments received by BOEM in
response to the Draft SEIS during the 45-day comment period. On August
4, 2017 (82 FR 36418), BOEM published a NOA announcing the availability
of the Final SEIS in the Federal Register. The Final SEIS can be found
on BOEM's Web site at: https://www.boem.gov/Massachusetts-Cape-Wind/.
Authority: This notice is published pursuant to the regulations
(40 CFR part 1506.6(b)) implementing the provisions of the National
Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 et
seq.).
Dated: September 26, 2017.
Walter D. Cruickshank,
Acting Director, Bureau of Ocean Energy Management.
[FR Doc. 2017-20936 Filed 9-28-17; 8:45 am]