Availability of a Draft Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Aliso Creek Mainstem Ecosystem Restoration Study, Orange County, California, 45584 [2017-20910]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
45584
Federal Register / Vol. 82, No. 188 / Friday, September 29, 2017 / Notices
include email address and daytime
telephone number at registration. Any
interested person may attend the
meeting, file written comments or
statements with the committee, or make
verbal comments from the floor during
the public meeting, at the times, and in
the manner, permitted by the
committee, as set forth below.
Special Accommodations: The
meeting venue is fully handicap
accessible, with wheelchair access.
Individuals requiring special
accommodations to access the public
meeting or seeking additional
information about public access
procedures, should contact Mr. Pointon,
the committee DFO, or Mr. Lichtman,
the ADFO, at the email addresses or
telephone numbers listed in the FOR
FURTHER INFORMATION CONTACT section,
at least five (5) business days prior to
the meeting so that appropriate
arrangements can be made.
Written Comments or Statements:
Pursuant to 41 CFR 102–3.105(j) and
102–3.140 and section 10(a)(3) of the
Federal Advisory Committee Act, the
public or interested organizations may
submit written comments or statements
to the Board about its mission and/or
the topics to be addressed in this public
meeting. Written comments or
statements should be submitted to Mr.
Pointon, the committee DFO, or Mr.
Lichtman, the committee ADFO, via
electronic mail, the preferred mode of
submission, at the addresses listed in
the FOR FURTHER INFORMATION CONTACT
section in the following formats: Adobe
Acrobat or Microsoft Word. The
comment or statement must include the
author’s name, title, affiliation, address,
and daytime telephone number. Written
comments or statements being
submitted in response to the agenda set
forth in this notice must be received by
the committee DFO or ADFO at least
five (5) business days prior to the
meeting so that they may be made
available to the Board for its
consideration prior to the meeting.
Written comments or statements
received after this date may not be
provided to the Board until its next
meeting. Please note that because the
Board operates under the provisions of
the Federal Advisory Committee Act, as
amended, all written comments will be
treated as public documents and will be
made available for public inspection.
Verbal Comments: Members of the
public will be permitted to make verbal
comments during the Board meeting
only at the time and in the manner
allowed herein. If a member of the
public is interested in making a verbal
comment at the open meeting, that
individual must submit a request, with
VerDate Sep<11>2014
18:50 Sep 28, 2017
Jkt 241001
a brief statement of the subject matter to
be addressed by the comment, at least
three business (3) days in advance to the
committee DFO or ADFO, via electronic
mail, the preferred mode of submission,
at the addresses listed in the FOR
FURTHER INFORMATION CONTACT section.
The committee DFO and ADFO will log
each request to make a comment, in the
order received, and determine whether
the subject matter of each comment is
relevant to the Board’s mission and/or
the topics to be addressed in this public
meeting. A 15-minute period near the
end of the meeting will be available for
verbal public comments. Members of
the public who have requested to make
a verbal comment and whose comments
have been deemed relevant under the
process described above, will be allotted
no more than three (3) minutes during
this period, and will be invited to speak
in the order in which their requests
were received by the DFO and ADFO.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2017–20912 Filed 9–28–17; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Availability of a Draft Integrated
Feasibility Report (Feasibility Report/
Environmental Impact Statement),
Aliso Creek Mainstem Ecosystem
Restoration Study, Orange County,
California
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
The U.S. Army Corps of
Engineers (Corps), in cooperation with
Orange County Public Works, Orange
County, CA announces the availability
of a Draft Integrated Feasibility Report
(Draft IFR) including Feasibility Report
and Environmental Impact Statement
(EIS) for the Aliso Creek Mainstem
Ecosystem Restoration Study, Orange
County, CA for review and comment.
The study evaluates opportunities for
restoring degraded aquatic and riparian
ecosystem structure and function,
riverine and floodplain system
connectivity, stream channel stability
and protection of critical public
infrastructure, including both regional
water supply and wastewater
conveyance pipelines along the lower
Aliso Creek Mainstem in Orange
County, CA. A Notice of Intent to
prepare the Draft EIS was published on
April 9, 2009 in the Federal Register (74
SUMMARY:
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
FR 16188). A public scoping meeting
was conducted on May 7, 2009 in the
City of Mission Viejo, CA.
DATES: The Draft IFR is available for a
45-day review period pursuant to the
National Environmental Policy Act
(NEPA). Written comments pursuant to
the NEPA will be accepted until the
close of public review at close of
business on November 13, 2017.
ADDRESSES: Questions or comments
concerning the Draft IFR may be
directed to: Ms. Deborah Lamb; U.S.
Army Corps of Engineers; Los Angeles
District; CESPL PDR–L; 915 Wilshire
Boulevard; Los Angeles, CA 90017–3401
or AlisoCreek@usace.army.mil.
FOR FURTHER INFORMATION CONTACT: Ms.
Deborah Lamb, U.S. Army Corps of
Engineers, Los Angeles District, phone
number (213) 452–3798.
SUPPLEMENTARY INFORMATION: As part of
the public involvement process, notice
is hereby given by the Corps’ Los
Angeles District of a public review
meeting on October 17, 2017, from 6:00
p.m. to 9:00 p.m. at the Laguna Hills
Community Center and Sports Complex,
Room-Heritage C. The address is 25555
Alicia Parkway, Laguna Hills, CA
92653. The public meeting will allow
participants the opportunity to
comment on the IFR. Attendance at the
public hearing is not necessary to
provide comments. Written comments
may also be given to the contact listed
under ADDRESSES.
The document is available online for
review at: https://
www.spl.usace.army.mil/Missions/CivilWorks/Projects-Studies/Aliso-CreekStudy/.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2017–20910 Filed 9–28–17; 8:45 am]
BILLING CODE 3720–58–P
DEFENSE NUCLEAR FACILITIES
SAFETY BOARD
Senior Executive Service Performance
Review Board
Defense Nuclear Facilities
Safety Board.
ACTION: Notice of Members of Senior
Executive Service Performance Review
Board.
AGENCY:
This notice announces the
membership of the Defense Nuclear
Facilities Safety Board (DNFSB) Senior
Executive Service (SES) Performance
Review Board (PRB).
DATES: September 29, 2017.
ADDRESSES: Send comments concerning
this notice to: Defense Nuclear Facilities
SUMMARY:
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 82, Number 188 (Friday, September 29, 2017)]
[Notices]
[Page 45584]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20910]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Availability of a Draft Integrated Feasibility Report
(Feasibility Report/Environmental Impact Statement), Aliso Creek
Mainstem Ecosystem Restoration Study, Orange County, California
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (Corps), in cooperation with
Orange County Public Works, Orange County, CA announces the
availability of a Draft Integrated Feasibility Report (Draft IFR)
including Feasibility Report and Environmental Impact Statement (EIS)
for the Aliso Creek Mainstem Ecosystem Restoration Study, Orange
County, CA for review and comment. The study evaluates opportunities
for restoring degraded aquatic and riparian ecosystem structure and
function, riverine and floodplain system connectivity, stream channel
stability and protection of critical public infrastructure, including
both regional water supply and wastewater conveyance pipelines along
the lower Aliso Creek Mainstem in Orange County, CA. A Notice of Intent
to prepare the Draft EIS was published on April 9, 2009 in the Federal
Register (74 FR 16188). A public scoping meeting was conducted on May
7, 2009 in the City of Mission Viejo, CA.
DATES: The Draft IFR is available for a 45-day review period pursuant
to the National Environmental Policy Act (NEPA). Written comments
pursuant to the NEPA will be accepted until the close of public review
at close of business on November 13, 2017.
ADDRESSES: Questions or comments concerning the Draft IFR may be
directed to: Ms. Deborah Lamb; U.S. Army Corps of Engineers; Los
Angeles District; CESPL PDR-L; 915 Wilshire Boulevard; Los Angeles, CA
90017-3401 or AlisoCreek@usace.army.mil.
FOR FURTHER INFORMATION CONTACT: Ms. Deborah Lamb, U.S. Army Corps of
Engineers, Los Angeles District, phone number (213) 452-3798.
SUPPLEMENTARY INFORMATION: As part of the public involvement process,
notice is hereby given by the Corps' Los Angeles District of a public
review meeting on October 17, 2017, from 6:00 p.m. to 9:00 p.m. at the
Laguna Hills Community Center and Sports Complex, Room-Heritage C. The
address is 25555 Alicia Parkway, Laguna Hills, CA 92653. The public
meeting will allow participants the opportunity to comment on the IFR.
Attendance at the public hearing is not necessary to provide comments.
Written comments may also be given to the contact listed under
ADDRESSES.
The document is available online for review at: https://www.spl.usace.army.mil/Missions/Civil-Works/Projects-Studies/Aliso-Creek-Study/.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2017-20910 Filed 9-28-17; 8:45 am]
BILLING CODE 3720-58-P