Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 45284-45285 [2017-20788]

Download as PDF 45284 Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices water surface elevation is maintained at 718.7 feet. River flows between 159 cubic feet per second (cfs) and 1,200 cfs are used for power generation, while flows in excess of 1,200 cfs are passed over the spillway. A single manually operated, low level outlet gate located in the unregulated spillway portion of the dam is used to drain the impoundment during maintenance activities. The total installed capacity of the project is 1,950 kW between the three generating units. The project generates approximately 6,223 megawatt-hours annually, which are sold to a local utility. The co-licensees propose to continue to operate and maintain the Upper Pelzer Project as is required in the existing license, and to develop canoe portage facilities. The co-licensees also propose to release a continuous minimum flow of 15 cfs or inflow, whichever is less, from the project dam in order to maintain aquatic habitat and water quality conditions in the 115-footlong reach between the dam and the upstream powerhouse tailrace. Other than the development of canoe portage facilities, no new construction or major project modifications are proposed. m. A copy of the application is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title protest or motion to intervene; (2) set forth in the heading the name of the applicant and the project number of the application to VerDate Sep<11>2014 18:44 Sep 27, 2017 Jkt 241001 which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: September 21, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–20789 Filed 9–27–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10253–032] Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License. b. Project No.: 10253–032. c. Date filed: November 30, 2015. d. Applicant: Pelzer Hydro Company, LLC (Pelzer Hydro), Consolidated Hydro Southeast, LLC (Consolidated Hydro). e. Name of Project: Lower Pelzer Hydroelectric Project. f. Location: The existing project is located on the Saluda River near the Towns of Pelzer and Williamston, in Anderson and Greenville Counties, South Carolina. The project does not affect federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Beth E. Harris, P.E., Regional Operations Manager, Enel Green Power North America, Inc., 11 Anderson Street Piedmont, SC 29673; Telephone—(864) 846–0042; Email— beth.harris@enel.com OR Kevin Webb, Hydro Licensing Manager, Enel Green Power North America, Inc., One Tech Drive, Suite 220, Andover, MA 01810; Telephone—(978) 681–1900; Email— kevin.webb@enel.com. i. FERC Contact: Navreet Deo, (202) 502–6304, or navreet.deo@ferc.gov. j. Deadline for filing motions to intervene and protests and requests for cooperating agency status: 60 days from the issuance date of this notice. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 The Commission strongly encourages electronic filing. Please file motions to intervene and protests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The first page of any filing should include docket number P–10253–032. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, but is not ready for environmental analysis at this time. l. The Lower Pelzer Project consists of: (1) A 696-foot-long by 40-foot-high granite masonry dam, consisting of (i) a 310-foot-long spillway section topped with 4-foot wooden flashboards, (ii) a 40-foot-long non-overflow section with two 10-foot-wide by 6-foot-high gates, and (iii) a 236-foot-long non-overflow section; (2) an 80-acre impoundment at a normal pool elevation of 693 feet mean sea level; (3) a 110-foot-long by 14-foot-wide intake, protected by a trashrack structure with 2-inch clear bar spacing, controlling flow to the powerhouse through five, 10.5-footwide square gates; (4) a 110-foot-long by 68-foot-wide brick powerhouse integral with the dam, containing 5 horizontal Francis turbine generating units that total 3,300 kilowatts (kW); (5) a 600foot-long by 110-foot-wide tailrace; (6) a 3-mile-long, 3,300-volt transmission line connecting the powerhouse to the grid via a 7.2/12.47 kilovolt transformer; and (7) appurtenant facilities. Pelzer Hydro and Consolidated Hydro (co-licensees) operate the project in a run-of-river mode, with no storage or flood control capacity. A continuous minimum flow of 140 cubic feet per second (cfs) or inflow, whichever is less, is released into the bypassed reach. The minimum flow is achieved via a sluice gate in the dam. The project operates under an estimated average head of 40 feet, including the 4-foot spillway flashboards. The impoundment water surface elevation is maintained at 693 E:\FR\FM\28SEN1.SGM 28SEN1 Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices feet. River flows between 159 and 1,408 cfs are used for power generation, while flows in excess of 1,408 cfs are passed over the flashboards and spillway. Flow to the generating units is controlled by five manually operated square slide gates. The total installed capacity of the project is 3,300 kW between the five generating units. The project generates approximately 8,784 megawatt-hours annually, which are sold to a local utility. The co-licensees propose to continue to operate and maintain the Lower Pelzer Project as is required in the existing license, and to develop canoe portage facilities. The co-licensees also propose to remove the existing threemile-long, 3,300-volt overhead transmission line, which is no longer in use, from the project boundary under a new license. Instead, the project would use a 165-foot-long, 3,300-volt transmission line that interconnects with the grid at an applicant-owned transformer. No changes to project operations are proposed. Other than the development of canoe portage facilities, no new construction or major project modifications are proposed. m. A copy of the application is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title PROTEST or MOTION TO INTERVENE; (2) set forth in the VerDate Sep<11>2014 18:44 Sep 27, 2017 Jkt 241001 heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: September 21, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–20788 Filed 9–27–17; 8:45 am] BILLING CODE 6717–01–P FEDERAL DEPOSIT INSURANCE CORPORATION Agency Information Collection Activities: Submission for OMB Review; Comment Request (OMB Nos. 3064–0085 and 3064–0120) Federal Deposit Insurance Corporation (FDIC). ACTION: Notice and request for comment. AGENCY: The Federal Deposit Insurance Corporation (FDIC) will submit the following information collection request to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995. The proposed information collections were previously published in the Federal Register on July 6, 2017, allowing for a 60-day comment. DATES: Comments are encouraged and will be accepted for an additional 30 days until October 30, 2017. ADDRESSES: Interested parties are invited to submit written comments to the FDIC by any of the following methods: • https://www.FDIC.gov/regulations/ laws/federal/notices.html • Email: comments@fdic.gov. Please include the name and OMB control number of the relevant information collection in the subject line of the message. • Mail: Manny Cabeza, Counsel, Room MB–3007, Federal Deposit Insurance Corporation, 550 17th Street NW., Washington, DC 20429. • Hand Delivery: Comments may be hand-delivered to the guard station at the rear of the 17th Street Building (located on F Street), on business days between 7:00 a.m. and 5:00 p.m. SUMMARY: PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 45285 All comments should refer to the relevant OMB control number. Written comments and/or suggestions can also be directed to the Office of Management and Budget, Office of Information and Regulatory Affairs, attention FDIC Desk Officer, New Executive Office Building, Washington DC 20503 or sent to OIRA_ submissions@omb.eop.gov. FOR FURTHER INFORMATION CONTACT: If you have additional comments, particularly with respect to the estimated public burden or associated response time, have suggestions, need a copy of any proposed information collection instrument and instructions, or desire any other additional information, please contact Manny Cabeza, Counsel, FDIC Legal Division either by mail at Room MB–3007, Federal Deposit Insurance Corporation, 550 17th Street NW., Washington, DC 20429; by email at mcabeza@fdic.gov; or by telephone at (202) 898–3767. SUPPLEMENTARY INFORMATION: Written comments and suggestions from the public and affected agencies concerning the proposed collections of information are encouraged. All comments received will become a matter of public record. Your comments should address one or more of the following four points: —Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information has practical utility; —Evaluate the accuracy of the agency’s estimate of the burden of the proposed information collection, including the validity of the methodology and assumptions used; —Evaluate whether and if so, how, the quality, utility, and clarity of the information to be collected can be enhanced; and —Ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology. Overview of the Information Collection Request 1. Title: Record Keeping, Reporting and Disclosure Requirements in Connection with the Equal Credit Opportunity Act Regulation B. OMB Number: 3064–0085. Form Number: None. Affected Public: Insured state nonmember banks and state savings associations. E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 82, Number 187 (Thursday, September 28, 2017)]
[Notices]
[Pages 45284-45285]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20788]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10253-032]


Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC; 
Notice of Application Accepted for Filing and Soliciting Motions To 
Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 10253-032.
    c. Date filed: November 30, 2015.
    d. Applicant: Pelzer Hydro Company, LLC (Pelzer Hydro), 
Consolidated Hydro Southeast, LLC (Consolidated Hydro).
    e. Name of Project: Lower Pelzer Hydroelectric Project.
    f. Location: The existing project is located on the Saluda River 
near the Towns of Pelzer and Williamston, in Anderson and Greenville 
Counties, South Carolina. The project does not affect federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Beth E. Harris, P.E., Regional Operations 
Manager, Enel Green Power North America, Inc., 11 Anderson Street 
Piedmont, SC 29673; Telephone--(864) 846-0042; Email_
beth.harris@enel.com OR Kevin Webb, Hydro Licensing Manager, Enel Green 
Power North America, Inc., One Tech Drive, Suite 220, Andover, MA 
01810; Telephone--(978) 681-1900; Email_kevin.webb@enel.com.
    i. FERC Contact: Navreet Deo, (202) 502-6304, or 
navreet.deo@ferc.gov.
    j. Deadline for filing motions to intervene and protests and 
requests for cooperating agency status: 60 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests and requests for cooperating agency 
status using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. The first page of any filing should 
include docket number P-10253-032.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The Lower Pelzer Project consists of: (1) A 696-foot-long by 40-
foot-high granite masonry dam, consisting of (i) a 310-foot-long 
spillway section topped with 4-foot wooden flashboards, (ii) a 40-foot-
long non-overflow section with two 10-foot-wide by 6-foot-high gates, 
and (iii) a 236-foot-long non-overflow section; (2) an 80-acre 
impoundment at a normal pool elevation of 693 feet mean sea level; (3) 
a 110-foot-long by 14-foot-wide intake, protected by a trashrack 
structure with 2-inch clear bar spacing, controlling flow to the 
powerhouse through five, 10.5-foot-wide square gates; (4) a 110-foot-
long by 68-foot-wide brick powerhouse integral with the dam, containing 
5 horizontal Francis turbine generating units that total 3,300 
kilowatts (kW); (5) a 600-foot-long by 110-foot-wide tailrace; (6) a 3-
mile-long, 3,300-volt transmission line connecting the powerhouse to 
the grid via a 7.2/12.47 kilovolt transformer; and (7) appurtenant 
facilities.
    Pelzer Hydro and Consolidated Hydro (co-licensees) operate the 
project in a run-of-river mode, with no storage or flood control 
capacity. A continuous minimum flow of 140 cubic feet per second (cfs) 
or inflow, whichever is less, is released into the bypassed reach. The 
minimum flow is achieved via a sluice gate in the dam. The project 
operates under an estimated average head of 40 feet, including the 4-
foot spillway flashboards. The impoundment water surface elevation is 
maintained at 693

[[Page 45285]]

feet. River flows between 159 and 1,408 cfs are used for power 
generation, while flows in excess of 1,408 cfs are passed over the 
flashboards and spillway. Flow to the generating units is controlled by 
five manually operated square slide gates. The total installed capacity 
of the project is 3,300 kW between the five generating units. The 
project generates approximately 8,784 megawatt-hours annually, which 
are sold to a local utility.
    The co-licensees propose to continue to operate and maintain the 
Lower Pelzer Project as is required in the existing license, and to 
develop canoe portage facilities. The co-licensees also propose to 
remove the existing three-mile-long, 3,300-volt overhead transmission 
line, which is no longer in use, from the project boundary under a new 
license. Instead, the project would use a 165-foot-long, 3,300-volt 
transmission line that interconnects with the grid at an applicant-
owned transformer.
    No changes to project operations are proposed. Other than the 
development of canoe portage facilities, no new construction or major 
project modifications are proposed.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, and .214. In determining the appropriate action to 
take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
protests or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title PROTEST 
or MOTION TO INTERVENE; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application.

    Dated: September 21, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-20788 Filed 9-27-17; 8:45 am]
 BILLING CODE 6717-01-P