Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 45284-45285 [2017-20788]
Download as PDF
45284
Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices
water surface elevation is maintained at
718.7 feet. River flows between 159
cubic feet per second (cfs) and 1,200 cfs
are used for power generation, while
flows in excess of 1,200 cfs are passed
over the spillway. A single manually
operated, low level outlet gate located in
the unregulated spillway portion of the
dam is used to drain the impoundment
during maintenance activities. The total
installed capacity of the project is 1,950
kW between the three generating units.
The project generates approximately
6,223 megawatt-hours annually, which
are sold to a local utility.
The co-licensees propose to continue
to operate and maintain the Upper
Pelzer Project as is required in the
existing license, and to develop canoe
portage facilities. The co-licensees also
propose to release a continuous
minimum flow of 15 cfs or inflow,
whichever is less, from the project dam
in order to maintain aquatic habitat and
water quality conditions in the 115-footlong reach between the dam and the
upstream powerhouse tailrace.
Other than the development of canoe
portage facilities, no new construction
or major project modifications are
proposed.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title protest or motion to
intervene; (2) set forth in the heading
the name of the applicant and the
project number of the application to
VerDate Sep<11>2014
18:44 Sep 27, 2017
Jkt 241001
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: September 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–20789 Filed 9–27–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10253–032]
Pelzer Hydro Company, LLC,
Consolidated Hydro Southeast, LLC;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 10253–032.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company,
LLC (Pelzer Hydro), Consolidated Hydro
Southeast, LLC (Consolidated Hydro).
e. Name of Project: Lower Pelzer
Hydroelectric Project.
f. Location: The existing project is
located on the Saluda River near the
Towns of Pelzer and Williamston, in
Anderson and Greenville Counties,
South Carolina. The project does not
affect federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Beth E. Harris,
P.E., Regional Operations Manager, Enel
Green Power North America, Inc., 11
Anderson Street Piedmont, SC 29673;
Telephone—(864) 846–0042; Email—
beth.harris@enel.com OR Kevin Webb,
Hydro Licensing Manager, Enel Green
Power North America, Inc., One Tech
Drive, Suite 220, Andover, MA 01810;
Telephone—(978) 681–1900; Email—
kevin.webb@enel.com.
i. FERC Contact: Navreet Deo, (202)
502–6304, or navreet.deo@ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. The
first page of any filing should include
docket number P–10253–032.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The Lower Pelzer Project consists
of: (1) A 696-foot-long by 40-foot-high
granite masonry dam, consisting of (i) a
310-foot-long spillway section topped
with 4-foot wooden flashboards, (ii) a
40-foot-long non-overflow section with
two 10-foot-wide by 6-foot-high gates,
and (iii) a 236-foot-long non-overflow
section; (2) an 80-acre impoundment at
a normal pool elevation of 693 feet
mean sea level; (3) a 110-foot-long by
14-foot-wide intake, protected by a
trashrack structure with 2-inch clear bar
spacing, controlling flow to the
powerhouse through five, 10.5-footwide square gates; (4) a 110-foot-long by
68-foot-wide brick powerhouse integral
with the dam, containing 5 horizontal
Francis turbine generating units that
total 3,300 kilowatts (kW); (5) a 600foot-long by 110-foot-wide tailrace; (6) a
3-mile-long, 3,300-volt transmission line
connecting the powerhouse to the grid
via a 7.2/12.47 kilovolt transformer; and
(7) appurtenant facilities.
Pelzer Hydro and Consolidated Hydro
(co-licensees) operate the project in a
run-of-river mode, with no storage or
flood control capacity. A continuous
minimum flow of 140 cubic feet per
second (cfs) or inflow, whichever is less,
is released into the bypassed reach. The
minimum flow is achieved via a sluice
gate in the dam. The project operates
under an estimated average head of 40
feet, including the 4-foot spillway
flashboards. The impoundment water
surface elevation is maintained at 693
E:\FR\FM\28SEN1.SGM
28SEN1
Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices
feet. River flows between 159 and 1,408
cfs are used for power generation, while
flows in excess of 1,408 cfs are passed
over the flashboards and spillway. Flow
to the generating units is controlled by
five manually operated square slide
gates. The total installed capacity of the
project is 3,300 kW between the five
generating units. The project generates
approximately 8,784 megawatt-hours
annually, which are sold to a local
utility.
The co-licensees propose to continue
to operate and maintain the Lower
Pelzer Project as is required in the
existing license, and to develop canoe
portage facilities. The co-licensees also
propose to remove the existing threemile-long, 3,300-volt overhead
transmission line, which is no longer in
use, from the project boundary under a
new license. Instead, the project would
use a 165-foot-long, 3,300-volt
transmission line that interconnects
with the grid at an applicant-owned
transformer.
No changes to project operations are
proposed. Other than the development
of canoe portage facilities, no new
construction or major project
modifications are proposed.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title PROTEST or MOTION
TO INTERVENE; (2) set forth in the
VerDate Sep<11>2014
18:44 Sep 27, 2017
Jkt 241001
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: September 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–20788 Filed 9–27–17; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
Agency Information Collection
Activities: Submission for OMB
Review; Comment Request (OMB Nos.
3064–0085 and 3064–0120)
Federal Deposit Insurance
Corporation (FDIC).
ACTION: Notice and request for comment.
AGENCY:
The Federal Deposit
Insurance Corporation (FDIC) will
submit the following information
collection request to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act of 1995.
The proposed information collections
were previously published in the
Federal Register on July 6, 2017,
allowing for a 60-day comment.
DATES: Comments are encouraged and
will be accepted for an additional 30
days until October 30, 2017.
ADDRESSES: Interested parties are
invited to submit written comments to
the FDIC by any of the following
methods:
• https://www.FDIC.gov/regulations/
laws/federal/notices.html
• Email: comments@fdic.gov. Please
include the name and OMB control
number of the relevant information
collection in the subject line of the
message.
• Mail: Manny Cabeza, Counsel,
Room MB–3007, Federal Deposit
Insurance Corporation, 550 17th Street
NW., Washington, DC 20429.
• Hand Delivery: Comments may be
hand-delivered to the guard station at
the rear of the 17th Street Building
(located on F Street), on business days
between 7:00 a.m. and 5:00 p.m.
SUMMARY:
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
45285
All comments should refer to the
relevant OMB control number. Written
comments and/or suggestions can also
be directed to the Office of Management
and Budget, Office of Information and
Regulatory Affairs, attention FDIC Desk
Officer, New Executive Office Building,
Washington DC 20503 or sent to OIRA_
submissions@omb.eop.gov.
FOR FURTHER INFORMATION CONTACT: If
you have additional comments,
particularly with respect to the
estimated public burden or associated
response time, have suggestions, need a
copy of any proposed information
collection instrument and instructions,
or desire any other additional
information, please contact Manny
Cabeza, Counsel, FDIC Legal Division
either by mail at Room MB–3007,
Federal Deposit Insurance Corporation,
550 17th Street NW., Washington, DC
20429; by email at mcabeza@fdic.gov; or
by telephone at (202) 898–3767.
SUPPLEMENTARY INFORMATION: Written
comments and suggestions from the
public and affected agencies concerning
the proposed collections of information
are encouraged. All comments received
will become a matter of public record.
Your comments should address one or
more of the following four points:
—Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information has practical
utility;
—Evaluate the accuracy of the agency’s
estimate of the burden of the
proposed information collection,
including the validity of the
methodology and assumptions used;
—Evaluate whether and if so, how, the
quality, utility, and clarity of the
information to be collected can be
enhanced; and
—Ways to minimize the burden of the
information collection on
respondents, including through the
use of automated collection
techniques or other forms of
information technology.
Overview of the Information Collection
Request
1. Title: Record Keeping, Reporting
and Disclosure Requirements in
Connection with the Equal Credit
Opportunity Act Regulation B.
OMB Number: 3064–0085.
Form Number: None.
Affected Public: Insured state
nonmember banks and state savings
associations.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 82, Number 187 (Thursday, September 28, 2017)]
[Notices]
[Pages 45284-45285]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20788]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10253-032]
Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC;
Notice of Application Accepted for Filing and Soliciting Motions To
Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 10253-032.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company, LLC (Pelzer Hydro),
Consolidated Hydro Southeast, LLC (Consolidated Hydro).
e. Name of Project: Lower Pelzer Hydroelectric Project.
f. Location: The existing project is located on the Saluda River
near the Towns of Pelzer and Williamston, in Anderson and Greenville
Counties, South Carolina. The project does not affect federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Beth E. Harris, P.E., Regional Operations
Manager, Enel Green Power North America, Inc., 11 Anderson Street
Piedmont, SC 29673; Telephone--(864) 846-0042; Email_
beth.harris@enel.com OR Kevin Webb, Hydro Licensing Manager, Enel Green
Power North America, Inc., One Tech Drive, Suite 220, Andover, MA
01810; Telephone--(978) 681-1900; Email_kevin.webb@enel.com.
i. FERC Contact: Navreet Deo, (202) 502-6304, or
navreet.deo@ferc.gov.
j. Deadline for filing motions to intervene and protests and
requests for cooperating agency status: 60 days from the issuance date
of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests and requests for cooperating agency
status using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. The first page of any filing should
include docket number P-10253-032.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The Lower Pelzer Project consists of: (1) A 696-foot-long by 40-
foot-high granite masonry dam, consisting of (i) a 310-foot-long
spillway section topped with 4-foot wooden flashboards, (ii) a 40-foot-
long non-overflow section with two 10-foot-wide by 6-foot-high gates,
and (iii) a 236-foot-long non-overflow section; (2) an 80-acre
impoundment at a normal pool elevation of 693 feet mean sea level; (3)
a 110-foot-long by 14-foot-wide intake, protected by a trashrack
structure with 2-inch clear bar spacing, controlling flow to the
powerhouse through five, 10.5-foot-wide square gates; (4) a 110-foot-
long by 68-foot-wide brick powerhouse integral with the dam, containing
5 horizontal Francis turbine generating units that total 3,300
kilowatts (kW); (5) a 600-foot-long by 110-foot-wide tailrace; (6) a 3-
mile-long, 3,300-volt transmission line connecting the powerhouse to
the grid via a 7.2/12.47 kilovolt transformer; and (7) appurtenant
facilities.
Pelzer Hydro and Consolidated Hydro (co-licensees) operate the
project in a run-of-river mode, with no storage or flood control
capacity. A continuous minimum flow of 140 cubic feet per second (cfs)
or inflow, whichever is less, is released into the bypassed reach. The
minimum flow is achieved via a sluice gate in the dam. The project
operates under an estimated average head of 40 feet, including the 4-
foot spillway flashboards. The impoundment water surface elevation is
maintained at 693
[[Page 45285]]
feet. River flows between 159 and 1,408 cfs are used for power
generation, while flows in excess of 1,408 cfs are passed over the
flashboards and spillway. Flow to the generating units is controlled by
five manually operated square slide gates. The total installed capacity
of the project is 3,300 kW between the five generating units. The
project generates approximately 8,784 megawatt-hours annually, which
are sold to a local utility.
The co-licensees propose to continue to operate and maintain the
Lower Pelzer Project as is required in the existing license, and to
develop canoe portage facilities. The co-licensees also propose to
remove the existing three-mile-long, 3,300-volt overhead transmission
line, which is no longer in use, from the project boundary under a new
license. Instead, the project would use a 165-foot-long, 3,300-volt
transmission line that interconnects with the grid at an applicant-
owned transformer.
No changes to project operations are proposed. Other than the
development of canoe portage facilities, no new construction or major
project modifications are proposed.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's Web site at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, and .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
protests or motions to intervene must be received on or before the
specified comment date for the particular application.
All filings must: (1) Bear in all capital letters the title PROTEST
or MOTION TO INTERVENE; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application.
Dated: September 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-20788 Filed 9-27-17; 8:45 am]