Linden VFT, LLC, v. Public Service Electric and Gas Company, PJM Interconnection, L.L.C.; Notice of Complaint, 44766 [2017-20476]

Download as PDF 44766 Federal Register / Vol. 82, No. 185 / Tuesday, September 26, 2017 / Notices Docket No. 3. 4. 5. 6. 7. File date P–2660–029 .................................................................... OR17–24–000; OR17–23–000 ........................................ CP15–554–000 ................................................................ CP17–15–000 .................................................................. P–2512–075 .................................................................... 9–11–2017 9–13–2017 9–13–2017 9–14–2017 9–15–2017 Presenter or requester U.S. Congress.2 Railroad Commission of Texas; Christi Craddick, Chairman U.S. Congress.3 U.S. Senate.4 FERC Staff.5 1 Telephone Call Summary for call on 8/15/2017 with Environmental Resources Management, Eagle LNG, and Taylor Engineering. Angus S. King, Jr. and Susan M. Collins. House Representative Bruce Poliquin. Representatives Richard Hudson, Bill Flores, George Holding, Walter Jones, Billy Long, Alex Mooney, Robert Pittenger, David Rouzer, Scott Taylor, Dave Brat, Bob Gibbs, Bill Johnson, David P. Joyce, David McKinley, Scott Perry, Keith J. Rothfus, and John Shimkus. 4 Senator Chris Van Hollen. 5 Telephone Call Summary for call on 9/13/2017 with West Virginia Department of Environmental Protection—Division of Water and Waste Management. 2 Senators 3 House Dated: September 19, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–20553 Filed 9–25–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–90–000] Linden VFT, LLC, v. Public Service Electric and Gas Company, PJM Interconnection, L.L.C.; Notice of Complaint Take notice that on September 18, 2017, pursuant to sections 206 and 306 1 of the Federal Power Act, and Rules 206 and 215 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 and 385.215, Linden VFT, LLC (Linden VFT or Complainant) filed a formal complaint against Public Service Electric and Gas Company (PSEG) and PJM Interconnection, L.L.C. (PJM) (jointly Respondents) alleging that, PSEG’s refusal to consent to an amendment of the Interconnection Service Agreement between Linden VFT, PSEG and PJM to reflect Linden VFT’s reduction in service level of its Transmission Withdrawal Rights from Firm to Non-Firm is unjust and unreasonable, all as more fully explained in the complaint. Complainant certifies that copies of the complaint were served on the contacts for Respondents as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will 1 16 U.S.C. 824(e) and 825e (2012). VerDate Sep<11>2014 18:28 Sep 25, 2017 Jkt 241001 not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERC OnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 10, 2017. Dated: September 19, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–20476 Filed 9–25–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–184–000. PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 Applicants: Puget Sound Energy, Inc., Macquarie Infrastructure Partners Inc. Description: Application for Authorization Under Section 203 of the Federal Power Act of Puget Sound Energy, Inc., et al. Filed Date: 9/19/17. Accession Number: 20170919–5075. Comments Due: 5 p.m. ET 10/10/17. Docket Numbers: EC17–186–000. Applicants: American Transmission Company LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of American Transmission Company LLC. Filed Date: 9/19/17. Accession Number: 20170919–5100. Comments Due: 5 p.m. ET 10/10/17. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–151–000. Applicants: RE Gaskell West LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of RE Gaskell West LLC. Filed Date: 9/19/17. Accession Number: 20170919–5074. Comments Due: 5 p.m. ET 10/10/17. Docket Numbers: EG17–152–000. Applicants: RE Gaskell West 1 LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of RE Gaskell West 1 LLC. Filed Date: 9/19/17. Accession Number: 20170919–5082. Comments Due: 5 p.m. ET 10/10/17. Docket Numbers: EG17–153–000. Applicants: RE Gaskell West 4 LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of RE Gaskell West 4 LLC. Filed Date: 9/19/17. Accession Number: 20170919–5083. Comments Due: 5 p.m. ET 10/10/17. Docket Numbers: EG17–154–000. Applicants: RE Gaskell West 5 LLC. Description: Notice of SelfCertification of Exempt Wholesale E:\FR\FM\26SEN1.SGM 26SEN1

Agencies

[Federal Register Volume 82, Number 185 (Tuesday, September 26, 2017)]
[Notices]
[Page 44766]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20476]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL17-90-000]


Linden VFT, LLC, v. Public Service Electric and Gas Company, PJM 
Interconnection, L.L.C.; Notice of Complaint

    Take notice that on September 18, 2017, pursuant to sections 206 
and 306 \1\ of the Federal Power Act, and Rules 206 and 215 of the 
Federal Energy Regulatory Commission's (Commission) Rules of Practice 
and Procedure, 18 CFR 385.206 and 385.215, Linden VFT, LLC (Linden VFT 
or Complainant) filed a formal complaint against Public Service 
Electric and Gas Company (PSEG) and PJM Interconnection, L.L.C. (PJM) 
(jointly Respondents) alleging that, PSEG's refusal to consent to an 
amendment of the Interconnection Service Agreement between Linden VFT, 
PSEG and PJM to reflect Linden VFT's reduction in service level of its 
Transmission Withdrawal Rights from Firm to Non-Firm is unjust and 
unreasonable, all as more fully explained in the complaint.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824(e) and 825e (2012).
---------------------------------------------------------------------------

    Complainant certifies that copies of the complaint were served on 
the contacts for Respondents as listed on the Commission's list of 
Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 10, 2017.

    Dated: September 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-20476 Filed 9-25-17; 8:45 am]
 BILLING CODE 6717-01-P