Combined Notice of Filings #2, 44400 [2017-20250]
Download as PDF
44400
Federal Register / Vol. 82, No. 183 / Friday, September 22, 2017 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
[Docket Nos. CP15–499–000, CP15–499–001
and CP17–26–000]
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–182–000.
Applicants: Calpine Corporation, ECP
ControlCo, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Calpine
Corporation, et al.
Filed Date: 9/15/17.
Accession Number: 20170915–5149.
Comments Due: 5 p.m. ET 10/6/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2493–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended CLGIA & Amended DSA
Windhub Solar Project SA Nos. 686–687
to be effective 11/15/2017.
Filed Date: 9/15/17.
Accession Number: 20170915–5092.
Comments Due: 5 p.m. ET 10/6/17.
Docket Numbers: ER17–2494–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
Amendment No. 5 to Rate Schedule No.
74 to be effective 10/1/2017.
Filed Date: 9/15/17.
Accession Number: 20170915–5128.
Comments Due: 5 p.m. ET 10/6/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 15, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–20250 Filed 9–21–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:11 Sep 21, 2017
Jkt 241001
Texas Eastern Transmission, LP;
Pomelo Connector Pipeline, LLC;
Notice of Availability of the
Environmental Assessment for the
Proposed South Texas Expansion
Project and Pomelo Connector
Pipeline Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
proposed South Texas Expansion
Project (STEP), proposed by Texas
Eastern Transmission, LP (Texas
Eastern) and the Pomelo Connector
Pipeline Project (Pomelo Project),
proposed by Pomelo Connector, LLC
(Pomelo) in the above referenced
dockets. Collectively, the STEP and
Pomelo Project, are referred to as the
Projects. The Pomelo Project would
provide up to 400,000 dekatherms per
day (Dth/d) of firm transportation
service from an interconnection with
Texas Eastern at the proposed Pomelo
Petronila Compressor Station in Nueces
County, Texas, to the Nueces Header
pipeline system. STEP would provide
approximately 400,000 Dth/d of firm
natural gas transportation service to an
interconnection with the Nueces
Header.
The EA assesses the potential
environmental effects of the
construction and operation of the
Projects in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed Projects, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Pomelo Project would
consists of construction and operation
of approximately 14 miles of 30-inchdiameter pipeline, a new 5,000
horsepower (hp) compressor station,
approximately 0.2 mile of new 30-inchdiameter pipeline, and associated
aboveground facilities in Nueces
County, Texas. Pomelo would engage in
certain construction, operation,
maintenance, and abandonment
activities under blanket construction
certificate authorization, and abandon
all of the capacity of the Pomelo
Connector Pipeline by lease to Texas
Eastern. The proposed STEP consists of
construction and operation of a new
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
8,400 hp gas turbine unit in Nueces
County, Texas; piping modifications at
its existing Angleton Station property in
Brazoria County, Texas; a new 8,400 hp
gas turbine unit at its existing Blessing
Compressor Station in Matagorda
County, Texas; clean burn emission
work and piping modifications at its
existing Mont Belvieu Compressor
Station in Chambers County, Texas; and
piping modifications at its existing
Vidor Compressor Station in Orange
County, Texas.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Projects areas. In addition, the EA is
available for public viewing on the
FERC’s Web site (www.ferc.gov) using
the eLibrary link. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before October 18, 2017.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP17–26–000 and
CP15–499) with your submission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 82, Number 183 (Friday, September 22, 2017)]
[Notices]
[Page 44400]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20250]
[[Page 44400]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-182-000.
Applicants: Calpine Corporation, ECP ControlCo, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Calpine Corporation, et al.
Filed Date: 9/15/17.
Accession Number: 20170915-5149.
Comments Due: 5 p.m. ET 10/6/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-2493-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended CLGIA & Amended DSA
Windhub Solar Project SA Nos. 686-687 to be effective 11/15/2017.
Filed Date: 9/15/17.
Accession Number: 20170915-5092.
Comments Due: 5 p.m. ET 10/6/17.
Docket Numbers: ER17-2494-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL Amendment No. 5 to Rate
Schedule No. 74 to be effective 10/1/2017.
Filed Date: 9/15/17.
Accession Number: 20170915-5128.
Comments Due: 5 p.m. ET 10/6/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 15, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-20250 Filed 9-21-17; 8:45 am]
BILLING CODE 6717-01-P