Download as PDF 44400 Federal Register / Vol. 82, No. 183 / Friday, September 22, 2017 / Notices DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings #2 [Docket Nos. CP15–499–000, CP15–499–001 and CP17–26–000] Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–182–000. Applicants: Calpine Corporation, ECP ControlCo, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Calpine Corporation, et al. Filed Date: 9/15/17. Accession Number: 20170915–5149. Comments Due: 5 p.m. ET 10/6/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2493–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended CLGIA & Amended DSA Windhub Solar Project SA Nos. 686–687 to be effective 11/15/2017. Filed Date: 9/15/17. Accession Number: 20170915–5092. Comments Due: 5 p.m. ET 10/6/17. Docket Numbers: ER17–2494–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL Amendment No. 5 to Rate Schedule No. 74 to be effective 10/1/2017. Filed Date: 9/15/17. Accession Number: 20170915–5128. Comments Due: 5 p.m. ET 10/6/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 15, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–20250 Filed 9–21–17; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 18:11 Sep 21, 2017 Jkt 241001 Texas Eastern Transmission, LP; Pomelo Connector Pipeline, LLC; Notice of Availability of the Environmental Assessment for the Proposed South Texas Expansion Project and Pomelo Connector Pipeline Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the proposed South Texas Expansion Project (STEP), proposed by Texas Eastern Transmission, LP (Texas Eastern) and the Pomelo Connector Pipeline Project (Pomelo Project), proposed by Pomelo Connector, LLC (Pomelo) in the above referenced dockets. Collectively, the STEP and Pomelo Project, are referred to as the Projects. The Pomelo Project would provide up to 400,000 dekatherms per day (Dth/d) of firm transportation service from an interconnection with Texas Eastern at the proposed Pomelo Petronila Compressor Station in Nueces County, Texas, to the Nueces Header pipeline system. STEP would provide approximately 400,000 Dth/d of firm natural gas transportation service to an interconnection with the Nueces Header. The EA assesses the potential environmental effects of the construction and operation of the Projects in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed Projects, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed Pomelo Project would consists of construction and operation of approximately 14 miles of 30-inchdiameter pipeline, a new 5,000 horsepower (hp) compressor station, approximately 0.2 mile of new 30-inchdiameter pipeline, and associated aboveground facilities in Nueces County, Texas. Pomelo would engage in certain construction, operation, maintenance, and abandonment activities under blanket construction certificate authorization, and abandon all of the capacity of the Pomelo Connector Pipeline by lease to Texas Eastern. The proposed STEP consists of construction and operation of a new PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 8,400 hp gas turbine unit in Nueces County, Texas; piping modifications at its existing Angleton Station property in Brazoria County, Texas; a new 8,400 hp gas turbine unit at its existing Blessing Compressor Station in Matagorda County, Texas; clean burn emission work and piping modifications at its existing Mont Belvieu Compressor Station in Chambers County, Texas; and piping modifications at its existing Vidor Compressor Station in Orange County, Texas. The FERC staff mailed copies of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the Projects areas. In addition, the EA is available for public viewing on the FERC’s Web site (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before October 18, 2017. For your convenience, there are three methods you can use to file your comments to the Commission. In all instances, please reference the project docket number (CP17–26–000 and CP15–499) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 82, Number 183 (Friday, September 22, 2017)]
[Notices]
[Page 44400]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20250]



[[Page 44400]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC17-182-000.
    Applicants: Calpine Corporation, ECP ControlCo, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Calpine Corporation, et al.
    Filed Date: 9/15/17.
    Accession Number: 20170915-5149.
    Comments Due: 5 p.m. ET 10/6/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-2493-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Amended CLGIA & Amended DSA 
Windhub Solar Project SA Nos. 686-687 to be effective 11/15/2017.
    Filed Date: 9/15/17.
    Accession Number: 20170915-5092.
    Comments Due: 5 p.m. ET 10/6/17.

    Docket Numbers: ER17-2494-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL Amendment No. 5 to Rate 
Schedule No. 74 to be effective 10/1/2017.
    Filed Date: 9/15/17.
    Accession Number: 20170915-5128.
    Comments Due: 5 p.m. ET 10/6/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 15, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-20250 Filed 9-21-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.