Texas Gas Transmission, LLC; Notice of Schedule for Environmental Review of the Morgan City and Youngsville Compression Station Abandoment Project, 43961 [2017-20016]
Download as PDF
Federal Register / Vol. 82, No. 181 / Wednesday, September 20, 2017 / Notices
Filed Date: 9/11/17.
Accession Number: 20170911–5061.
Comments Due: 5 p.m. ET 9/25/17.
Docket Numbers: RP17–1037–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
09/11/17 Negotiated Rates—
Consolidated Edison Energy, Inc.
H–2275–89 to be effective 11/1/2017.
Filed Date: 9/11/17.
Accession Number: 20170911–5063.
Comments Due: 5 p.m. ET 9/25/17.
Docket Numbers: RP17–1038–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing:
09/11/17 Negotiated Rates—Freepoint
Commodities LLC R–7250–19 to be
effective 11/1/2017.
Filed Date: 9/11/17.
Accession Number: 20170911–5102.
Comments Due: 5 p.m. ET 9/25/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
to Section 7(b) of the Natural Gas Act,
to abandon in-place certain compression
facilities. The proposed project is
known as the Morgan City and
Youngsville Compressor Station
Abandonment Project (Project), and
would consist of abandoning in-place
certain facilities at the Morgan City
Compressor Station in Assumption
Parish, Louisiana, and the Lafayette
(referred to as ‘‘Youngsville’’)
Compressor Station in Lafayette Parish,
Louisiana. In addition, Texas Gas would
relinquish the firm design capacity
associated with the Project facilities.
On May 9, 2017, revised on May 19,
2017, the Federal Energy Regulatory
Commission (Commission or FERC)
issued its Notice of Application for the
Project. Among other things, that notice
alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA, September 25, 2017
90-day Federal Authorization Decision
Deadline, December 24, 2017
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Federal Energy Regulatory
Commission
Texas Gas proposes to abandon inplace the Morgan City Compressor
Station consisting of one 9,100
horsepower gas-fired turbine
compressor unit, a compressor building,
yard and station piping, and
appurtenant auxiliary facilities located
in Assumption Parish, Louisiana, and
abandon in-place one 9,100 horsepower
gas-fired turbine compressor unit and its
compressor building at the Lafayette
(Youngsville) Compressor Station
located in Lafayette Parish, Louisiana.
[Docket No. CP17–256–000]
Additional Information
Dated: September 12, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–19985 Filed 9–19–17; 8:45 am]
BILLING CODE 6717–01–P
sradovich on DSKBBY8HB2PROD with NOTICES
DEPARTMENT OF ENERGY
Texas Gas Transmission, LLC; Notice
of Schedule for Environmental Review
of the Morgan City and Youngsville
Compression Station Abandoment
Project
On April 26, 2017, Texas Gas
Transmission, LLC (Texas Gas) filed an
application in Docket No. CP17–256–
000 requesting authorization pursuant
VerDate Sep<11>2014
18:28 Sep 19, 2017
Jkt 241001
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
43961
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and ‘‘Docket Number’’ excluding
the last three digits (i.e., CP17–256), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: September 14, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–20016 Filed 9–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–2470–000]
Red Dirt Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Red Dirt
Wind Project, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 4,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 82, Number 181 (Wednesday, September 20, 2017)]
[Notices]
[Page 43961]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-20016]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-256-000]
Texas Gas Transmission, LLC; Notice of Schedule for Environmental
Review of the Morgan City and Youngsville Compression Station
Abandoment Project
On April 26, 2017, Texas Gas Transmission, LLC (Texas Gas) filed an
application in Docket No. CP17-256-000 requesting authorization
pursuant to Section 7(b) of the Natural Gas Act, to abandon in-place
certain compression facilities. The proposed project is known as the
Morgan City and Youngsville Compressor Station Abandonment Project
(Project), and would consist of abandoning in-place certain facilities
at the Morgan City Compressor Station in Assumption Parish, Louisiana,
and the Lafayette (referred to as ``Youngsville'') Compressor Station
in Lafayette Parish, Louisiana. In addition, Texas Gas would relinquish
the firm design capacity associated with the Project facilities.
On May 9, 2017, revised on May 19, 2017, the Federal Energy
Regulatory Commission (Commission or FERC) issued its Notice of
Application for the Project. Among other things, that notice alerted
agencies issuing federal authorizations of the requirement to complete
all necessary reviews and to reach a final decision on a request for a
federal authorization within 90 days of the date of issuance of the
Commission staff's Environmental Assessment (EA) for the Project. This
instant notice identifies the FERC staff's planned schedule for the
completion of the EA for the Project.
Schedule for Environmental Review
Issuance of EA, September 25, 2017
90-day Federal Authorization Decision Deadline, December 24, 2017
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Texas Gas proposes to abandon in-place the Morgan City Compressor
Station consisting of one 9,100 horsepower gas-fired turbine compressor
unit, a compressor building, yard and station piping, and appurtenant
auxiliary facilities located in Assumption Parish, Louisiana, and
abandon in-place one 9,100 horsepower gas-fired turbine compressor unit
and its compressor building at the Lafayette (Youngsville) Compressor
Station located in Lafayette Parish, Louisiana.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and
``Docket Number'' excluding the last three digits (i.e., CP17-256), and
follow the instructions. For assistance with access to eLibrary, the
helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: September 14, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-20016 Filed 9-19-17; 8:45 am]
BILLING CODE 6717-01-P