Postponement of Certain Compliance Dates for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category, 43494-43500 [2017-19821]

Download as PDF sradovich on DSKBBY8HB2PROD with RULES 43494 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations Rule 28 Revocation of Permits (Revised 07/18/72) Rule 29 Conditions on Permits (Revised 03/14/06) Rule 30 Permit Renewal (Revised 04/13/04) Rule 32 Breakdown Conditions: Emergency Variances, A., B.1., and D. only. (Revised 02/20/79) Rule 33 Part 70 Permits-General (Revised 04/12/11) Rule 33.1 Part 70 Permits—Definitions (Revised 04/12/11) Rule 33.2 Part 70 Permits—Application Contents (Revised 04/10/01) Rule 33.3 Part 70 Permits—Permit Content (Revised 09/12/06) Rule 33.4 Part 70 Permits—Operational Flexibility (Revised 04/10/01) Rule 33.5 Part 70 Permits—Timeframes for Applications, Review and Issuance (Adopted 10/12/93) Rule 33.6 Part 70 Permits—Permit Term and Permit Reissuance (Adopted 10/12/93) Rule 33.7 Part 70 Permits—Notification (Revised 04/10/01) Rule 33.8 Part 70 Permits—Reopening of Permits (Adopted 10/12/93) Rule 33.9 Part 70 Permits—Compliance Provisions (Revised 04/10/01) Rule 33.10 Part 70 Permits—General Part 70 Permits (Adopted 10/12/93) Rule 34 Acid Deposition Control (Adopted 03/14/95) Rule 35 Elective Emission Limits (Revised 04/12/11) Rule 36 New Source Review—Hazardous Air Pollutants (Adopted 10/06/98) Rule 42 Permit Fees (Revised 04/12/16) Rule 44 Exemption Evaluation Fee (Revised 04/08/08) Rule 45 Plan Fees (Adopted 06/19/90) Rule 45.2 Asbestos Removal Fees (Revised 08/04/92) Rule 47 Source Test, Emission Monitor, and Call-Back Fees (Adopted 06/22/99) Rule 50 Opacity (Revised 04/13/04) Rule 52 Particulate Matter—Concentration (Grain Loading)(Revised 04/13/04) Rule 53 Particulate Matter—Process Weight (Revised 04/13/04) Rule 54 Sulfur Compounds (Revised 01/14/14) Rule 56 Open Burning (Revised 11/11/03) Rule 57 Incinerators (Revised 01/11/05) Rule 57.1 Particulate Matter Emissions From Fuel Burning Equipment (Adopted 01/11/05) Rule 62.7 Asbestos-Demolition and Renovation (Adopted 06/16/92, Effective 09/01/92) Rule 63 Separation and Combination of Emissions (Revised 11/21/78) Rule 64 Sulfur Content of Fuels (Revised 04/13/99) Rule 68 Carbon Monoxide (Revised 04/13/04) Rule 71 Crude Oil and Reactive Organic Compound Liquids (Revised 12/13/94) Rule 71.1 Crude Oil Production and Separation (Revised 06/16/92) Rule 71.2 Storage of Reactive Organic Compound Liquids (Revised 09/26/89) Rule 71.3 Transfer of Reactive Organic Compound Liquids (Revised 06/16/92) Rule 71.4 Petroleum Sumps, Pits, Ponds, and Well Cellars (Revised 06/08/93) VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 Rule 71.5 Glycol Dehydrators (Adopted 12/13/94) Rule 72 New Source Performance Standards (NSPS) (Revised 09/9/08) Rule 73 National Emission Standards for Hazardous Air Pollutants (NESHAPS) (Revised 09/9/08) Rule 74 Specific Source Standards (Adopted 07/06/76) Rule 74.1 Abrasive Blasting (Revised 11/12/91) Rule 74.2 Architectural Coatings (Revised 01/12/10) Rule 74.6 Surface Cleaning and Degreasing (Revised 11/11/03—effective 07/01/04) Rule 74.6.1 Batch Loaded Vapor Degreasers (Adopted 11/11/03—effective 07/01/04) Rule 74.7 Fugitive Emissions of Reactive Organic Compounds at Petroleum Refineries and Chemical Plants (Revised 10/10/95) Rule 74.8 Refinery Vacuum Producing Systems, Waste-Water Separators and Process Turnarounds (Revised 07/05/83) Rule 74.9 Stationary Internal Combustion Engines (Revised 11/08/05) Rule 74.10 Components at Crude Oil Production Facilities and Natural Gas Production and Processing Facilities (Revised 03/10/98) Rule 74.11 Natural Gas-Fired Residential Water Heaters—Control of NOX (Revised 05/11/10) Rule 74.11.1 Large Water Heaters and Small Boilers (Revised 09/11/12) Rule 74.12 Surface Coating of Metal Parts and Products (Revised 04/08/08) Rule 74.15 Boilers, Steam Generators and Process Heaters (5 MMBTUs and greater) (Revised 11/08/94) Rule 74.15.1 Boilers, Steam Generators and Process Heaters (1 to 5 MMBTUs) (Revised 06/23/15) Rule 74.16 Oil Field Drilling Operations (Adopted 01/08/91) Rule 74.20 Adhesives and Sealants (Revised 09/11/12) Rule 74.23 Stationary Gas Turbines (Revised 1/08/02) Rule 74.24 Marine Coating Operations (Revised 09/11/12) Rule 74.24.1 Pleasure Craft Coating and Commercial Boatyard Operations (Revised 01/08/02) Rule 74.26 Crude Oil Storage Tank Degassing Operations (Adopted 11/08/94) Rule 74.27 Gasoline and ROC Liquid Storage Tank Degassing Operations (Adopted 11/08/94) Rule 74.28 Asphalt Roofing Operations (Adopted 05/10/94) Rule 74.30 Wood Products Coatings (Revised 06/27/06) Rule 74.31 Metal Working Fluids and Direct-Contact Lubricants (Adopted 11/12/13) Rule 75 Circumvention (Revised 11/27/78) Rule 101 Sampling and Testing Facilities (Revised 05/23/72) Rule 102 Source Tests (Revised 04/13/04) Rule 103 Continuous Monitoring Systems (Revised 02/09/99) Rule 154 Stage 1 Episode Actions (Adopted 09/17/91) Rule 155 Stage 2 Episode Actions (Adopted 09/17/91) PO 00000 Frm 00038 Fmt 4700 Sfmt 4700 Rule 156 Stage 3 Episode Actions (Adopted 09/17/91) Rule 158 Source Abatement Plans (Adopted 09/17/91) Rule 159 Traffic Abatement Procedures (Adopted 09/17/91) Rule 220 General Conformity (Adopted 05/09/95) Rule 230 Notice to Comply (Revised 9/9/08) * * * * * [FR Doc. 2017–19704 Filed 9–15–17; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 423 [EPA–HQ–OW–2009–0819; FRL–9967–90– OW] RIN 2040–AF76 Postponement of Certain Compliance Dates for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: Under the Clean Water Act (‘‘CWA’’), The Environmental Protection Agency (EPA) intends to conduct a rulemaking to potentially revise certain best available technology economically achievable (‘‘BAT’’) effluent limitations and pretreatment standards for existing sources (‘‘PSES’’) for the steam electric power generating point source category, which were published in the Federal Register on November 3, 2015. EPA is, accordingly, postponing the associated compliance dates in the 2015 Rule. In particular, EPA is postponing the earliest compliance dates for the new, more stringent, BAT effluent limitations and PSES for flue gas desulfurization (‘‘FGD’’) wastewater and bottom ash transport water in the 2015 Rule for a period of two years. At this time, EPA does not intend to conduct a rulemaking that would potentially revise the new, more stringent BAT effluent limitations and pretreatment standards in the 2015 Rule for fly ash transport water, flue gas mercury control wastewater, and gasification wastewater, or any of the other requirements in the 2015 Rule. As such, EPA is not changing the compliance dates for the BAT limitations and PSES established by the 2015 Rule for these wastestreams. EPA’s action to postpone certain compliance dates in the 2015 Rule is intended to preserve the status quo for FGD wastewater and bottom ash transport SUMMARY: E:\FR\FM\18SER1.SGM 18SER1 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations sradovich on DSKBBY8HB2PROD with RULES water until EPA completes its next rulemaking concerning those wastestreams, and it thus does not otherwise amend the effluent limitations guidelines and standards for the steam electric power generating point source category. DATES: The final rule is effective September 18, 2017. In accordance with 40 CFR part 23, this regulation shall be considered issued for purposes of judicial review at 1 p.m. Eastern Standard Time on October 2, 2017. Under section 509(b)(1) of the CWA, judicial review of this regulation can be had only by filing a petition for review in the U.S. Court of Appeals within 120 days after the regulation is considered issued for purposes of judicial review. Under section 509(b)(2), the requirements in this regulation may not be challenged later in civil or criminal proceedings brought by EPA to enforce these requirements. ADDRESSES: The EPA has established a docket for this action under Docket ID No. EPA–OW–2009–0819. All documents in the docket are listed on the https://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available electronically through https:// www.regulations.gov. FOR FURTHER INFORMATION CONTACT: Ronald Jordan, United States Environmental Protection Agency, Engineering and Analysis Division; telephone number: (202) 566–1003; email address: jordan.ronald@epa.gov. Electronic copies of this document and related materials are available on EPA’s Web site at https://www.epa.gov/eg/ steam-electric-power-generatingeffluentguidelines-2015-final-rule. Copies of this final rule are also available at https://www.regulations.gov. SUPPLEMENTARY INFORMATION: I. Background On November 3, 2015, the EPA published a final rule amending 40 CFR part 423, the effluent limitations guidelines and standards for the steam electric power generating point source category, under Sections 301, 304, 306, 307, 308, 402, and 501 of the CWA (33 U.S.C. 1311, 1314, 1316, 1317, 1318, 1342, and 1361). The amendments addressed limitations and standards on various wastestreams at steam electric power plants: FGD wastewater, bottom VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 ash transport water, fly ash transport water, flue gas mercury control wastewater, gasification wastewater, and combustion residual leachate. Collectively, this rulemaking is known as the ‘‘Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category,’’ or ‘‘2015 Rule.’’ For further information on the 2015 Rule, see 80 FR 67838 (November 3, 2015). EPA received seven petitions for review of the 2015 Rule. The U.S. Judicial Panel on Multi-District Litigation issued an order on December 8, 2015, consolidating all of the petitions in the U.S. Court of Appeals for the Fifth Circuit, Southwestern Electric Power Co., et al. v. EPA, No. 15– 60821. In a letter dated March 24, 2017, the Utility Water Act Group (‘‘UWAG’’) 1 submitted a petition for reconsideration of the 2015 Rule which requested that EPA suspend the Rule’s approaching deadlines. UWAG supplemented its petition with additional information in a letter dated April 13, 2017. In a letter dated April 5, 2017, the Small Business Administration (‘‘SBA’’) Office of Advocacy sent EPA a second petition for reconsideration of the 2015 Rule, which expressly supports UWAG’s petition and raises issues that SBA considers to be pertinent to small businesses. The petitions raise wideranging objections to the Rule.2 Among other things, the UWAG petition points to new data which they believe show that plants burning subbituminous and bituminous coal cannot comply with the 2015 Rule’s limitations and standards for FGD wastewater and questions EPA’s characterization of bottom ash transport water. UWAG also requested that EPA suspend or delay the ‘‘rule’s fast-approaching compliance deadlines while EPA works to reconsider and revise, as appropriate, the substantive requirements of the current rule.’’ In an April 12, 2017 letter to those who submitted the reconsideration petitions, the Administrator announced his decision to reconsider the 2015 Rule. See DCN SE06612. As explained in that letter, after considering the objections raised in the reconsideration petitions, the Administrator determined that it is appropriate and in the public 1 According to the petition, UWAG is a voluntary, ad hoc, unincorporated group of 163 individual energy companies and three national trade associations of energy companies: Edison Electric Institute, the National Rural Electric Cooperative Association, and the American Public Power Association. 2 A copy of each petition and the supplemental information is included in the docket for this rule, Docket ID No. EPA–HQ–OW–2009–0819. PO 00000 Frm 00039 Fmt 4700 Sfmt 4700 43495 interest to reconsider the Rule. On April 14, 2017, EPA requested that the Fifth Circuit hold the case in abeyance while the Agency undertook reconsideration. On April 24, 2017, the Fifth Circuit granted the motion and placed the case in abeyance. On June 6, 2017 (82 FR 26017), EPA proposed to postpone the compliance dates for the new, more stringent, BAT effluent limitations and PSES in the 2015 Rule for each of the following wastestreams: FGD wastewater, bottom ash transport water, fly ash transport water, flue gas mercury control wastewater, and gasification wastewater, while reconsideration of the 2015 Rule was underway. EPA explained that this postponement would preserve the regulatory status quo with respect to wastestreams subject to the 2015 Rule’s new, and more stringent, limitations and standards during reconsideration and that postponement of compliance dates is intended to prevent the unnecessary expenditure of resources until EPA finalizes any rulemaking as a result of its reconsideration of the 2015 Rule. EPA also solicited comments on whether this postponement should be for a specified period of time, for example, two years. On August 11, 2017, EPA sent a second letter to those who had requested reconsideration of the 2015 Rule, announcing the Administrator’s decision to conduct a new rulemaking to potentially revise the new, more stringent BAT limitations and PSES in the 2015 Rule that apply to two wastestreams: FGD wastewater and bottom ash transport water. See DCN SE06670. On August 14, 2017, EPA filed a motion to govern further proceedings in the U.S. Court of Appeals for the Fifth Circuit, which explained that EPA intends to conduct further rulemaking to potentially revise the new, more stringent BAT/PSES requirements in the 2015 Rule applicable to FGD wastewater and bottom ash transport water, and requested, in part, that the Court sever and hold in abeyance all judicial proceedings concerning portions of the 2015 Rule related to those particular requirements. On August 22, 2017, the Court granted EPA’s motion. In an earlier action, EPA administratively postponed certain compliance dates that had not yet passed in part of the 2015 Rule pursuant to Section 705 of the Administrative Procedure Act (‘‘APA’’), 5 U.S.C. 705, which states that ‘‘[w]hen an agency finds that justice so requires, it may postpone the effective date of action taken by it pending judicial review.’’ 82 FR 19005 (April 25, 2017). EPA had postponed the compliance dates as a E:\FR\FM\18SER1.SGM 18SER1 43496 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations sradovich on DSKBBY8HB2PROD with RULES temporary measure pursuant to Section 705 to preserve the status quo while the litigation in the Fifth Circuit was pending and EPA’s reconsideration was underway. Because EPA has decided to conduct further rulemaking to potentially revise the new, more stringent BAT limitations and PSES in the 2015 Rule applicable to two specific wastestreams (FGD wastewater and bottom ash transport water), and it is today finalizing a rule which postpones the associated compliance dates in the 2015 Rule pending its next rulemaking, there is no longer any need for the Agency to maintain its prior action pursuant to Section 705 of the APA. EPA, hereby, withdraws that action. II. Summary of Comments Received EPA received thousands of written comments on the proposed rule to postpone certain compliance dates in the 2015 Rule. EPA also held a public hearing on July 31, 2017. The comments on the proposed rule generally fall into one of four categories: (1) Support for postponement of compliance dates; (2) opposition to the postponement of compliance dates; (3) comments on the substantive requirements of the 2015 Rule (which are outside the scope of this action, which concerns postponing certain compliance dates only); and (4) comments on the length of time that EPA should postpone the compliance dates. Commenters that support the postponement rule generally assert that the postponement is appropriate to prevent industry from spending ‘‘unnecessary resources’’ until EPA completes its reconsideration of the 2015 Rule. Many commenters who support a postponement in compliance dates state that, given the substantial costs required to implement technology required to comply with the 2015 Rule, as well as the time needed for designing and optimizing treatment systems, certainty in the discharge requirements is needed and postponement of compliance dates allows for that. In addition, commenters argue that the Agency has both the authority and the responsibility to postpone the 2015 Rule until it completes any rulemaking following its reconsideration process. Comments on the length of the postponement generally assert that EPA should postpone the compliance dates for a minimum of two years, until EPA has taken final action on any rule revisions, or some time period beyond when EPA has taken final action on any rule revisions. Commenters that oppose the postponement rule generally assert that (1) the technology bases underlying the VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 2015 Rule are widely available and affordable now, many steam electric plants have already installed or are in the process of implementing these technologies, and postponing the compliance dates would hinder technology development; (2) any postponement allows power plants to continue to discharge pollutants that are harmful to public health and the environment, and the forgone public health and environmental benefits during any postponement outweigh the costs to industry; and (3) EPA lacks authority to postpone the compliance dates. III. Rationale for Finalizing a Postponement of Compliance Dates In light of new information not contained in the record for the 2015 Rule and the inherent discretion the Agency has to reconsider past policy decisions consistent with the CWA and other applicable law, EPA intends to conduct a new rulemaking regarding the appropriate technology bases and associated limits for the BAT/PSES requirements applicable to FGD wastewater and bottom ash transport water discharged from steam electric power plants. Given this, and after carefully considering comments received on the proposed rule, EPA finds it appropriate to postpone the earliest compliance dates for the new, more stringent, BAT effluent limitations and PSES applicable to FGD wastewater and bottom ash transport water in the 2015 Rule until it completes the new rulemaking. This maintains the 2015 Rule as a whole at this time, with the only change being to postpone specific compliance deadlines for two wastestreams. Thus, the earliest compliance dates for plants to meet the new, more stringent FGD wastewater and bottom ash wastewater limitations and standards in the 2015 Rule, which were to be determined by the permitting authority as a date ‘‘as soon as possible beginning November 1, 2018 . . .’’, are now to be determined by the permitting authority as a date ‘‘as soon as possible beginning November 1, 2020 . . . .’’ EPA is not changing the ‘‘no later than’’ date of December 31, 2023, because EPA is not aware that the 2023 date is an immediate driver for expenditures by plants (petitioners had requested relief from the ‘‘fast-approaching compliance deadlines’’ in the 2015 Rule), and EPA plans to take up the appropriate compliance period in its next rulemaking. In order to be absolutely clear about what is being postponed, the final rule includes more precise regulatory text to implement the rule than was included in the proposed rule. PO 00000 Frm 00040 Fmt 4700 Sfmt 4700 Agencies have inherent authority to reconsider past decisions and to revise, replace or repeal a decision to the extent permitted by law and supported by a reasoned explanation. FCC v. Fox Television Stations, Inc., 556 U.S. 502, 515 (2009); Motor Vehicle Mfrs. Ass’n v. State Farm Mutual Auto. Ins. Co., 463 U.S. 29, 42 (1983). See also Nat’l Ass’n of Home Builders v. EPA, 682 F.3d 1032, 1038 & 1043 (D.C. Cir. 2012). Particularly relevant here, the CWA expressly authorizes EPA to revise effluent limitations and standards. 33 U.S.C. 1311(d), 1314(b), (g)(1), (m)(1)(A), 1317(b)(2). Moreover, in doing so, Section 304(b)(2)(B) of the CWA directs EPA to consider several factors, including ‘‘other factors as the Administrator deems appropriate,’’ and the Agency is afforded considerable discretion in deciding how much weight to give each factor. See, e.g., Weyerhaeuser Co. v. Costle, 590 F.2d 1011, 1045 (D.C. Cir. 1978). In this case, where EPA has decided to undertake a new rulemaking, which may result in substantive changes to the 2015 Rule, that is an appropriate factor to consider and one that warrants the postponement of compliance dates for the new, more stringent BAT and PSES requirements for two wastestreams in the 2015 Rule, until such a rulemaking is complete (i.e., EPA issues any final rule that substantively revises the 2015 Rule or EPA decides not to issue such a final rule). This will prevent the potentially needless expenditure of resources during a rulemaking that may ultimately change the 2015 Rule in these respects. As mentioned, some commenters stated that the record for the 2015 Rule demonstrates that the technologies underlying the new, more stringent requirements for FGD wastewater and bottom ash transport water are widely available and affordable. Notwithstanding statements in the 2015 Rule record, certain parties have raised serious concerns about the availability and affordability of the technology basis for the FGD wastewater and bottom ash transport water requirements in the 2015 Rule, and the Administrator wishes to take some time to carefully review these requirements in light of those concerns and ensure any such requirements are technologically available and economically achievable within the meaning of the statute. EPA has discretion in determining technological availability and economic achievability and is not constrained by the CWA to make the same policy decision as the former Administration, so long as its decision is reasonable. As explained above, the Agency may E:\FR\FM\18SER1.SGM 18SER1 sradovich on DSKBBY8HB2PROD with RULES Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations reconsider past policy decisions consistent with the Clean Water Act and other applicable law. The Agency may also reconsider technical determinations in light of new information submitted to the Agency that was not in the record for the 2015 Rule. EPA intends to fully evaluate all of the issues raised in the petitions, including concerns about: Cost and impacts to steam electric facilities, public availability of information on which the rule is based, lack of data for plants that burn certain types of coal, and validity of certain pollutant data used in EPA’s 2015 Rule analysis. For example, petitioners raised concerns about the numerical BAT limitations and PSES applicable to FGD wastewater in the 2015 Rule. They assert that there are differences among coal types that affect the performance and costs of biological treatment and that EPA did not have data to demonstrate the performance of biological treatment on all coal types. To resolve this concern, following the rulemaking, industry collected (and continues to collect) additional data on the performance of biological treatment for different coal types. As another example, petitioners raised questions about the inclusion and validity of certain data due, in part, to what they assert are flaws in data acceptance criteria, obsolete analytical methods, and the treatment of non-detect analytical results, which petitioners believed resulted in an overestimation of pollutant loadings for bottom ash transport water. EPA agrees that these are important issues that warrant further consideration in conjunction with the statutory factors for determining BAT for these wastestreams. EPA thus intends to re-evaluate these and other concerns raised in the petitions in the next rulemaking. EPA acknowledges that postponement of certain of the 2015 Rule’s compliance dates may be disruptive to vendors and treatment technology suppliers. EPA, however, must also consider the substantial investments required by the steam electric power industry to comply with the BAT limitations and PSES,3 and that certainty regarding the limitations and standards deserves prominent consideration by the Agency when these limitations and standards may change. As UWAG pointed out in its April 13, 2017 letter, ‘‘a rule of this magnitude and complexity requires substantial time to come into compliance for multiple wastestreams. Detailed studies 3 In the 2015 Rule, EPA estimated the total annualized pre-tax compliance costs for the FGD and bottom ash requirements to be $486.8 million. See DCN SE05978. VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 and planning, followed by large capital expenditures and subsequent installation and testing, are timeconsuming.’’ Companies have been evaluating their compliance options and are reaching the point at which they will be committing funds, incurring costs, or commencing construction to install technologies. As part of the 2015 Rule, EPA estimated the costs associated with compliance with the 2015 Rule’s new requirements. For all applicable wastestreams, EPA assessed the operations and treatment system components, identified equipment and process changes that the plant would likely make to meet the 2015 Rule, and estimated the cost to implement those changes. This includes, among other things, the capital costs of installing the technology (based on estimates of the technology selected as representing the level of control) and the operation and maintenance costs of operating the technology. See Technical Development Document (‘‘TDD’’), pp. 9–1 through 9– 52. EPA estimated that the total post-tax annualized compliance costs would be $339.6 million/year. See Regulatory Impact Analysis (‘‘RIA’’), Table 3–2 (Option D).4 The 2015 rulemaking record also describes evaluation of the initial capital costs that regulated parties would incur in the near term (if a stay were not in place) to meet the 2015 Rule’s effluent limitations and standards. For the purpose of analysis, in the RIA, EPA assumed that all capital costs are incurred concurrently with technology installation according to discharge permit renewal schedules, but EPA realizes that feasibility studies and planning may need to be completed in advance of that date. Specifically, plants would incur engineering design costs, costs to acquire equipment, freight shipping costs to transport equipment from manufacturers to the installation site, costs for actions to prepare the site (such as installing concrete foundations and buildings for the new equipment), and construction expenses associated with connecting electrical and piping systems to new equipment. See TDD, p. 9–3. EPA estimated post-tax annualized capital costs of $204.4 million/year. See RIA, Table 3–2 (Option D). Although there is a wide degree of variability among the costs particular plants would 4 EPA analyzed both pre-tax and post-tax costs. Pre-tax costs provide insight on the total expenditures as initially incurred by the plants. Post-tax costs are a more meaningful measure of compliance impact on privately owned for-profit plants, and incorporate approximate capital depreciation and other relevant tax treatments in the analysis. RIA, p. 3–6. PO 00000 Frm 00041 Fmt 4700 Sfmt 4700 43497 expend, EPA estimates that the average post-tax annualized capital compliance costs for a plant would be approximately $1.5 million/year. See TDD, Table 9–19 (plants with compliance costs); RIA, Table 3–2 (Option D). To the extent that these costs are associated with the 2015 Rule requirements for FGD wastewater and bottom ash transport water, and in the event that EPA revises these requirements in a future rulemaking, these are costs that would be incurred for activities that ultimately might not be necessary. In that case, this would reflect costs incurred by facilities and potentially passed on to utility rate payers that ultimately did not need to be spent. In light of these imminent planning and capital expenditures that facilities incurring costs under the 2015 Rule would need to undertake in order to meet the earliest compliance deadlines for the new, more stringent limitations and standards in the 2015 Rule, and the fact that the Agency is conducting a new rulemaking regarding the appropriate technology bases and associated limits for BAT limitations and PSES applicable to FGD wastewater and bottom ash transport water, the Agency views it as appropriate to postpone the earliest compliance dates that have not yet passed for these wastestreams in 2015 Rule. This will preserve the regulatory status quo with respect to requirements for FGD wastewater and bottom ash transport water until the new rulemaking is complete. Some commenters also express concerns that postponement of compliance dates would hinder technology advancements. EPA’s experience does not support this concern. The record for the 2015 Rule demonstrates that technology advancements were not hindered during that rulemaking. Rather, as explained in the preamble to the final 2015 Rule, vendors continued to improve existing technologies and to develop new technologies during the rulemaking leading up to the 2015 Rule. EPA acknowledges that postponement of the compliance dates could lead to a delay in the accrual of some of the benefits attributable to the 2015 Rule. The 2015 Rule required that steam electric power plants would comply with the new, more stringent requirements no later than 2023, with plants expected to implement new control technologies over a five-year compliance period of 2019–2023 according to their permit renewal schedule. In the record for the 2015 Rule, EPA estimated the value of certain benefits linked to reduced pollutant E:\FR\FM\18SER1.SGM 18SER1 43498 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations sradovich on DSKBBY8HB2PROD with RULES discharges that could be monetized for the period 2019 through 2042. Based on the 2015 Rule data and methodology, and depending on the inclusion of the Clean Power Plan, EPA estimates that foregone annualized benefits for a twoyear delay would be between $26.6 million and $33.6 million.5 EPA similarly estimates that plants would experience annualized cost savings of between $27.5 million and $36.8 million as a result of a two-year delay. See DCN SE06668 for additional details, including calculations of the foregone benefits and cost savings. EPA understands that these estimates have uncertainty due to, for example, the possibility of unexpected implementation approaches, and thus that the actual cost savings could have been somewhat higher or lower than estimated. Similarly, due to data and analysis limitations, the forgone monetized benefits are likely underestimated. These estimates, however, are consistent with and reflect the best data and analysis available at the time of the 2015 Rule. EPA notes that, as explained earlier, there is uncertainty as to the FGD wastewater and bottom ash transport water BAT/PSES requirements while EPA conducts a new rulemaking. If EPA did not postpone the compliance dates, industry would likely incur costs as it prepares to comply with the 2015 Rule, irrespective of what EPA ultimately determines to be BAT/PSES for FGD wastewater and bottom ash transport water. By contrast, under the 2015 Rule, even if permits were written today, the earliest those permits would have required compliance with the limitations and standards at issue are ‘‘as soon as possible beginning November 1, 2018.’’ So, while some companies would have to plan to comply and spend money right away, the benefits would not begin to accrue until 2018, at the earliest. Also, these benefits may not be lost if a permitting authority requires similar effluent limitations where necessary to meet applicable water quality standards, under CWA section 301(b)(1)(C). EPA has carefully weighed the concerns about potentially foregone benefits with the consideration of the costs that could needlessly be incurred should the requirements be changed, as well as the 5 The calculations are based on the benefits and costs estimated for the 2015 Rule, which were detailed in the ‘‘Benefit and Cost Analysis for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category’’ (BCA) and ‘‘Regulatory Impact Analysis for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category’’ (RIA) reports. VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 overall uncertainty and potential confusion that would be caused by imposing the 2015 Rule requirements while simultaneously undertaking rulemaking that may change those requirements. On balance, EPA has concluded the more reasonable approach is to postpone the compliance dates in the 2015 Rule. Thus, EPA agrees with commenters who argue that it should postpone the new, more stringent BAT/PSES requirements for FGD wastewater and bottom ash transport water in the 2015 Rule until it completes a new rulemaking on these wastestreams. After reflecting on the time it typically takes the Agency to propose and finalize revised effluent limitations guidelines and standards, and in light the characteristics of this industry and the anticipated scope of the next rulemaking, EPA projects it will take approximately three years to propose and finalize a new rule (Fall 2020). See DCN SE06667. Consequently, EPA is postponing the earliest compliance dates for the new, more stringent, BAT effluent limitations and PSES for FGD wastewater and bottom ash transport water for a period of two years (November 1, 2020).6 To the extent that commenters believe a postponement under this rule should last beyond the time it takes EPA to complete its new rulemaking, such comments are appropriately considered as part of, and in light of, that new rulemaking and not this action. As explained, this rule is intended only as a relatively short-term measure until EPA completes the next rulemaking, and EPA anticipates that the next rulemaking will necessarily address compliance dates in some fashion. Although EPA proposed to postpone the compliance dates for the new, more stringent requirements applicable to fly ash transport water, gasification wastewater, and flue gas mercury control (FGMC) wastewater, in addition to the requirements for FGD wastewater and bottom ash transport water, this final rule does not postpone those former compliance dates. Commenters stated that EPA has no basis to postpone compliance dates for requirements that parties have not expressly argued should be reconsidered, such as those for fly ash transport water and FGMC wastewater. EPA agrees that the final rule should postpone only those requirements that the Agency plans to potentially revise in the next rulemaking. Because EPA is not 6 If EPA does not complete a new rulemaking by November, 2020, it plans to further postpone the compliance dates such that the earliest compliance date is not prior to completion of a new rulemaking. PO 00000 Frm 00042 Fmt 4700 Sfmt 4700 conducting a new rulemaking concerning any of the other issues addressed by the 2015 Rule, including requirements for fly ash transport water, gasification wastewater, and FGMC wastewater, EPA is not changing the compliance dates for these wastestreams or any of the other compliance dates for the requirements in that Rule. The record for the 2015 Rule demonstrates that changes associated with converting a fly ash system are unrelated from an engineering perspective to conversions/ upgrades for bottom ash transport water and FGD treatment systems. Converting a fly ash system requires installing a silo to capture the dry fly ash, which is subsequently transported offsite to beneficial reuse markets (e.g., cement plants) or landfilled. Bottom ash is handled separately, regardless of whether it is wet or dry. The same is true for FGD wastes. EPA recognizes however, that from a financing and long-term planning perspective, there are advantages to a facility in knowing the full suite of requirements it will need to comply with over a longer term planning horizon. Some facilities commented that they may need to know what the ultimate requirements will be for bottom ash transport water and FGD wastewater to assist them in considering alternatives for meeting the requirements for the other waste streams (fly ash transport water and FGMC wastewater) for which EPA is not postponing the earliest compliance dates. EPA notes that there continues to be discretion under the 2015 Rule for permitting authorities to consider: Time needed to ‘‘expeditiously plan (including time to raise capital), design, procure, and install equipment’’ to comply with the rule; changes being made at the plant to comply with several other rules; and ‘‘other factors as appropriate’’ in determining exactly when, within a specified compliance period, the 2015 Rule’s new, more stringent limitations apply to any given plant. See 40 CFR 423.11(t). In light of the compliance date postponements being finalized today, in determining the ‘‘as soon as possible date,’’ EPA believes it would be reasonable for permitting authorities to consider the need for a facility to make integrated planning decisions regarding compliance with the requirements for all of the wastestreams currently subject to new, more stringent requirements in the 2015 Rule, as well as the other rules identified in § 423.11(t) to the extent that a facility demonstrates such a need. This could include harmonizing schedules to the extent provided for E:\FR\FM\18SER1.SGM 18SER1 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations under the 2015 Rule 7 for meeting the 2015 Rule requirements for fly ash transport water and FGMC wastewater to allow time for a facility to have certainty regarding what their ultimate requirements will be under the steam electric ELGs, as well as the requirements under the other rules listed in § 423.11(t). This rule is effective immediately upon publication. Section 553(d) of the Administrative Procedure Act, 5 U.S.C. 553(d), provides that publication of a substantive rule must be made no less than 30 days before its effective date, subject to several exceptions. Section 553(d)(1) establishes an exception for ‘‘a substantive rule which grants or recognizes an exemption or relieves a restriction.’’ The exception in Section 553(d)(1) reflects the purpose of the 30day notice requirement, which is to give affected entities time to prepare for the effective date of a rule or to take any other action which the issuance of a rule may prompt. This rule fits within Section 553(d)(1) because it postpones certain requirements on steam electric power plants to control their pollutant discharges by two years, and as a result, it relieves a restriction on regulated entities for that period. IV. Statutory and Executive Order Reviews B. Executive Order 13771: Reducing Regulations and Controlling Regulatory Costs This action is considered an Executive Order 13771 deregulatory action. Details on the estimated cost savings of this final rule can be found in EPA’s analysis of the potential costs and benefits associated with this action. sradovich on DSKBBY8HB2PROD with RULES C. Paperwork Reduction Act This final rule does not involve any information collection activities subject to the PRA, 44 U.S.C. 3501 et seq. D. Regulatory Flexibility Act (RFA) I certify that this action will not have a significant economic impact on a 7 For any final effluent limitation that is specified to become applicable after November 1, 2018, the specified date must be as soon as possible, but in no case later than December 31, 2023. 16:23 Sep 15, 2017 Jkt 241001 E. Unfunded Mandates Reform Act (UMRA) This action does not contain an unfunded mandate of $100 million or more as described in UMRA, 2 U.S.C. 1531–1538, and does not significantly or uniquely affect small governments. F. Executive Order 13132: Federalism A. Executive Order 12866: Regulatory Planning and Review; and, Executive Order 13563: Improving Regulation and Regulatory Review This action is a significant regulatory action that was submitted to the Office of Management and Budget (OMB) for review. Any changes made in response to OMB recommendations have been documented in the docket. VerDate Sep<11>2014 substantial number of small entities under the RFA. In making this determination, the impact of concern is any significant adverse economic impact on small entities. An agency may certify that a rule will not have a significant economic impact on a substantial number of small entities if the rule relieves regulatory burden, has no net burden or otherwise has a positive economic effect on the small entities subject to the rule. This action maintains the 2015 Rule as a whole at this time, with the only change being to postpone specific compliance deadlines for two wastestreams. As described above, EPA estimates that steam electric plants, including some small entities, would experience annualized cost savings of $27.5 million as a result of this two-year delay. We have therefore concluded that this action will relieve regulatory burden for some directly regulated small entities. This action does not have federalism implications, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). It will not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. G. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments This action does not have Tribal implications, as specified in Executive Order 13175 (65 FR 67249, November 9, 2000). H. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks This final rule is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997) because EPA previously determined that the environmental health risks or safety risks addressed by the requirements EPA is finalizing do not present a disproportionate risk to children. PO 00000 Frm 00043 Fmt 4700 Sfmt 4700 43499 I. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use This action is not a ‘‘significant energy action’’ because it is not likely to have a significant adverse effect on the supply, distribution or use of energy. J. National Technology Transfer and Advancement Act (NTTAA) This rulemaking does not involve technical standards that would require Agency consideration under NTTAA section 12(d), 15 U.S.C. 272 note. K. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations This is a final rule to delay action, and it does not change the requirements of the effluent limitations guidelines and standards published in 2015. While the postponement in compliance dates could delay the protection the 2015 Rule would afford to all communities, including those impacted disproportionately by the pollutants in certain wastewater discharges, this action would not change any impacts of the 2015 Rule upon implementation. The EPA therefore believes it is more appropriate to consider the impact on minority and low-income populations in the context of possible substantive changes as part of any future rulemaking. L. Congressional Review Act This action is subject to the CRA, and the EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action is a not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). List of Subjects in 40 CFR Part 423 Environmental protection, Electric power generation, Power plants, Waste treatment and disposal, Water pollution control. Dated: September 12, 2017. E. Scott Pruitt, Administrator. For reasons stated in the preamble, EPA amends 40 CFR part 423 as set forth below: PART 423—STEAM ELECTRIC POWER GENERATING POINT SOURCE CATEGORY 1. The authority citation for part 423 continues to read as follows: ■ Authority: Secs. 101; 301; 304(b), (c), (e), and (g); 306; 307; 308 and 501, Clean Water Act (Federal Water Pollution Control Act E:\FR\FM\18SER1.SGM 18SER1 43500 Federal Register / Vol. 82, No. 179 / Monday, September 18, 2017 / Rules and Regulations Amendments of 1972, as amended; 33 U.S.C. 1251; 1311; 1314(b), (c), (e), and (g); 1316; 1317; 1318 and 1361). 2. Amend § 423.11 by revising paragraph (t) introductory text to read as follows: ■ § 423.11 Specialized definitions. * * * * * (t) The phrase ‘‘as soon as possible’’ means November 1, 2018 (except for purposes of § 423.13(g)(1)(i) and (k)(1)(i), and § 423.16(e) and (g), in which case it means November 1, 2020), unless the permitting authority establishes a later date, after receiving information from the discharger, which reflects a consideration of the following factors: * * * * * § 423.13 [Amended] 3. Amend § 423.13 paragraphs (g)(1)(i) and (k)(1)(i) by removing the text ‘‘November 1, 2018’’ and adding the text ‘‘November 1, 2020’’ in its place. ■ § 423.16 [Amended] 4. Amend § 423.16 paragraphs (e) two times, and (g) by removing the text ‘‘November 1, 2018’’ and adding the text ‘‘November 1, 2020’’ in its place. ■ [FR Doc. 2017–19821 Filed 9–15–17; 8:45 am] BILLING CODE 6560–50–P DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration 50 CFR Part 635 [Docket No. 170602535–7835–01] RIN 0648–XF480 Atlantic Highly Migratory Species; Adjustments to 2017 Northern Albacore Tuna Quota, 2017 North and South Atlantic Swordfish Quotas, and 2017 Atlantic Bluefin Tuna Reserve Category Quota National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Temporary final rule. AGENCY: NMFS adjusts the northern albacore tuna annual baseline quota for 2017 with available underharvest of the 2016 adjusted U.S. northern albacore quota. NMFS also adjusts the North and South Atlantic swordfish baseline quotas for 2017 based on available underharvest from the 2016 adjusted U.S. quotas and international quota transfers. NMFS also augments the 2017 sradovich on DSKBBY8HB2PROD with RULES SUMMARY: VerDate Sep<11>2014 16:23 Sep 15, 2017 Jkt 241001 Atlantic bluefin tuna Reserve category quota with available underharvest of the 2016 adjusted U.S. bluefin tuna quota. This action is necessary to implement binding recommendations of the International Commission for the Conservation of Atlantic Tunas (ICCAT), as required by the Atlantic Tunas Convention Act (ATCA), and to achieve domestic management objectives under the Magnuson-Stevens Fishery Conservation and Management Act (Magnuson-Stevens Act). DATES: Effective September 18, 2017, through December 31, 2017. ADDRESSES: Supporting documents such as Environmental Assessments and Fishery Management Plans and their Amendments described below may be downloaded from the HMS Web site at www.nmfs.noaa.gov/sfa/hms/. These documents also are available upon request from Sarah McLaughlin, Steve Durkee, or Gray Redding at the telephone numbers below. FOR FURTHER INFORMATION CONTACT: Sarah McLaughlin, 978–281–9260, Steve Durkee, 202–670–6637, or Gray Redding, 301–427–8503. SUPPLEMENTARY INFORMATION: Regulations implemented under the authority of the Atlantic Tunas Convention Act (ATCA; 16 U.S.C. 971 et seq.) and the Magnuson-Stevens Fishery Conservation and Management Act (Magnuson-Stevens Act; 16 U.S.C. 1801 et seq.) governing the harvest of northern albacore, swordfish, and bluefin tuna by persons and vessels subject to U.S. jurisdiction are found at 50 CFR part 635. Section 635.27(e) describes the northern albacore annual quota recommended by ICCAT and the annual northern albacore quota adjustment process. Section 635.27(c) describes the quota adjustment process for both North and South Atlantic swordfish. Section 635.27(a) subdivides the ICCAT-recommended U.S. bluefin tuna quota among the various domestic fishing categories, per the allocations established in the 2006 Consolidated Atlantic Highly Migratory Species Fishery Management Plan (2006 Consolidated HMS FMP) (71 FR 58058, October 2, 2006), as amended by Amendment 7 to the 2006 Consolidated HMS FMP (Amendment 7) (79 FR 71510, December 2, 2014), and describes the annual bluefin tuna quota adjustment process. NMFS is required under ATCA and the Magnuson-Stevens Act to provide U.S. fishing vessels with a reasonable opportunity to harvest the ICCAT-recommended quotas. The northern albacore quota implementation and quota adjustment processes, along with the bluefin tuna PO 00000 Frm 00044 Fmt 4700 Sfmt 4700 quota adjustment process, were previously analyzed in Amendment 7, which published in August 2014 and included a Final Environmental Impact Statement, Final Regulatory Impact Review (RIR), Final Regulatory Flexibility Analysis (FRFA), and Final Social Impact Statement. ICCAT conducted another bluefin tuna stock assessment update in 2014, and, after considering the scientific advice in the stock assessment, adopted a recommendation regarding western Atlantic bluefin tuna management that increases the U.S. bluefin tuna quota for 2015 and 2016 (ICCAT Recommendation 14–05). NMFS published a final rule to implement that baseline annual U.S. bluefin tuna quota on August 28, 2015 (80 FR 52198), and prepared an Environmental Assessment (EA), RIR, and FRFA for that action. ICCAT Recommendation 16–08 extended the U.S. bluefin tuna allocation established in Recommendation 14–05 through 2017. The North Atlantic swordfish quota adjustment process was previously analyzed in the EA, RIR, and FRFA that were prepared for the 2012 Swordfish Quota Adjustment Rule (July 31, 2012; 77 FR 45273). The South Atlantic swordfish quota adjustment process was previously analyzed in the EA, RIR, and FRFA that were prepared for the 2007 Swordfish Quota Specification Final Rule (October 5, 2007; 72 FR 56929). In the 2016 North and South Atlantic Swordfish Quotas Adjustment Final Rule (July 26, 2016, 81 FR 48719), after taking public comment on the issue, NMFS announced its intent to no longer issue proposed and final specifications/ rules for North and South Atlantic swordfish quotas adjustments in cases where the quota adjustment follows previously codified and analyzed formulas. Therefore, beginning this year, NMFS is instead issuing a temporary final rule to adjust the quota, in a similar process to northern albacore and bluefin tuna quota adjustments. NMFS will continue to undertake notice and comment rulemaking when adopting new quotas, quota formulas, or otherwise altering conservation and management measures. Note that weight information for northern albacore and bluefin tuna below is shown in metric tons (mt) whole weight (ww), and both dressed weight (dw) and ww is shown for swordfish. Northern Albacore Annual Quota and Adjustment Process Since 1998, ICCAT has adopted recommendations regarding the northern albacore fishery. The current E:\FR\FM\18SER1.SGM 18SER1

Agencies

[Federal Register Volume 82, Number 179 (Monday, September 18, 2017)]
[Rules and Regulations]
[Pages 43494-43500]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19821]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 423

[EPA-HQ-OW-2009-0819; FRL-9967-90-OW]
RIN 2040-AF76


Postponement of Certain Compliance Dates for the Effluent 
Limitations Guidelines and Standards for the Steam Electric Power 
Generating Point Source Category

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Under the Clean Water Act (``CWA''), The Environmental 
Protection Agency (EPA) intends to conduct a rulemaking to potentially 
revise certain best available technology economically achievable 
(``BAT'') effluent limitations and pretreatment standards for existing 
sources (``PSES'') for the steam electric power generating point source 
category, which were published in the Federal Register on November 3, 
2015. EPA is, accordingly, postponing the associated compliance dates 
in the 2015 Rule. In particular, EPA is postponing the earliest 
compliance dates for the new, more stringent, BAT effluent limitations 
and PSES for flue gas desulfurization (``FGD'') wastewater and bottom 
ash transport water in the 2015 Rule for a period of two years. At this 
time, EPA does not intend to conduct a rulemaking that would 
potentially revise the new, more stringent BAT effluent limitations and 
pretreatment standards in the 2015 Rule for fly ash transport water, 
flue gas mercury control wastewater, and gasification wastewater, or 
any of the other requirements in the 2015 Rule. As such, EPA is not 
changing the compliance dates for the BAT limitations and PSES 
established by the 2015 Rule for these wastestreams. EPA's action to 
postpone certain compliance dates in the 2015 Rule is intended to 
preserve the status quo for FGD wastewater and bottom ash transport

[[Page 43495]]

water until EPA completes its next rulemaking concerning those 
wastestreams, and it thus does not otherwise amend the effluent 
limitations guidelines and standards for the steam electric power 
generating point source category.

DATES: The final rule is effective September 18, 2017. In accordance 
with 40 CFR part 23, this regulation shall be considered issued for 
purposes of judicial review at 1 p.m. Eastern Standard Time on October 
2, 2017. Under section 509(b)(1) of the CWA, judicial review of this 
regulation can be had only by filing a petition for review in the U.S. 
Court of Appeals within 120 days after the regulation is considered 
issued for purposes of judicial review. Under section 509(b)(2), the 
requirements in this regulation may not be challenged later in civil or 
criminal proceedings brought by EPA to enforce these requirements.

ADDRESSES: The EPA has established a docket for this action under 
Docket ID No. EPA-OW-2009-0819. All documents in the docket are listed 
on the https://www.regulations.gov Web site. Although listed in the 
index, some information is not publicly available, e.g., CBI or other 
information whose disclosure is restricted by statute. Certain other 
material, such as copyrighted material, is not placed on the Internet 
and will be publicly available only in hard copy form. Publicly 
available docket materials are available electronically through https://www.regulations.gov.

FOR FURTHER INFORMATION CONTACT: Ronald Jordan, United States 
Environmental Protection Agency, Engineering and Analysis Division; 
telephone number: (202) 566-1003; email address: jordan.ronald@epa.gov. 
Electronic copies of this document and related materials are available 
on EPA's Web site at https://www.epa.gov/eg/steam-electric-power-generatingeffluent-guidelines-2015-final-rule. Copies of this final 
rule are also available at https://www.regulations.gov.

SUPPLEMENTARY INFORMATION: 

I. Background

    On November 3, 2015, the EPA published a final rule amending 40 CFR 
part 423, the effluent limitations guidelines and standards for the 
steam electric power generating point source category, under Sections 
301, 304, 306, 307, 308, 402, and 501 of the CWA (33 U.S.C. 1311, 1314, 
1316, 1317, 1318, 1342, and 1361). The amendments addressed limitations 
and standards on various wastestreams at steam electric power plants: 
FGD wastewater, bottom ash transport water, fly ash transport water, 
flue gas mercury control wastewater, gasification wastewater, and 
combustion residual leachate. Collectively, this rulemaking is known as 
the ``Effluent Limitations Guidelines and Standards for the Steam 
Electric Power Generating Point Source Category,'' or ``2015 Rule.'' 
For further information on the 2015 Rule, see 80 FR 67838 (November 3, 
2015).
    EPA received seven petitions for review of the 2015 Rule. The U.S. 
Judicial Panel on Multi-District Litigation issued an order on December 
8, 2015, consolidating all of the petitions in the U.S. Court of 
Appeals for the Fifth Circuit, Southwestern Electric Power Co., et al. 
v. EPA, No. 15-60821.
    In a letter dated March 24, 2017, the Utility Water Act Group 
(``UWAG'') \1\ submitted a petition for reconsideration of the 2015 
Rule which requested that EPA suspend the Rule's approaching deadlines. 
UWAG supplemented its petition with additional information in a letter 
dated April 13, 2017. In a letter dated April 5, 2017, the Small 
Business Administration (``SBA'') Office of Advocacy sent EPA a second 
petition for reconsideration of the 2015 Rule, which expressly supports 
UWAG's petition and raises issues that SBA considers to be pertinent to 
small businesses. The petitions raise wide-ranging objections to the 
Rule.\2\ Among other things, the UWAG petition points to new data which 
they believe show that plants burning subbituminous and bituminous coal 
cannot comply with the 2015 Rule's limitations and standards for FGD 
wastewater and questions EPA's characterization of bottom ash transport 
water. UWAG also requested that EPA suspend or delay the ``rule's fast-
approaching compliance deadlines while EPA works to reconsider and 
revise, as appropriate, the substantive requirements of the current 
rule.''
---------------------------------------------------------------------------

    \1\ According to the petition, UWAG is a voluntary, ad hoc, 
unincorporated group of 163 individual energy companies and three 
national trade associations of energy companies: Edison Electric 
Institute, the National Rural Electric Cooperative Association, and 
the American Public Power Association.
    \2\ A copy of each petition and the supplemental information is 
included in the docket for this rule, Docket ID No. EPA-HQ-OW-2009-
0819.
---------------------------------------------------------------------------

    In an April 12, 2017 letter to those who submitted the 
reconsideration petitions, the Administrator announced his decision to 
reconsider the 2015 Rule. See DCN SE06612. As explained in that letter, 
after considering the objections raised in the reconsideration 
petitions, the Administrator determined that it is appropriate and in 
the public interest to reconsider the Rule. On April 14, 2017, EPA 
requested that the Fifth Circuit hold the case in abeyance while the 
Agency undertook reconsideration. On April 24, 2017, the Fifth Circuit 
granted the motion and placed the case in abeyance.
    On June 6, 2017 (82 FR 26017), EPA proposed to postpone the 
compliance dates for the new, more stringent, BAT effluent limitations 
and PSES in the 2015 Rule for each of the following wastestreams: FGD 
wastewater, bottom ash transport water, fly ash transport water, flue 
gas mercury control wastewater, and gasification wastewater, while 
reconsideration of the 2015 Rule was underway. EPA explained that this 
postponement would preserve the regulatory status quo with respect to 
wastestreams subject to the 2015 Rule's new, and more stringent, 
limitations and standards during reconsideration and that postponement 
of compliance dates is intended to prevent the unnecessary expenditure 
of resources until EPA finalizes any rulemaking as a result of its 
reconsideration of the 2015 Rule. EPA also solicited comments on 
whether this postponement should be for a specified period of time, for 
example, two years.
    On August 11, 2017, EPA sent a second letter to those who had 
requested reconsideration of the 2015 Rule, announcing the 
Administrator's decision to conduct a new rulemaking to potentially 
revise the new, more stringent BAT limitations and PSES in the 2015 
Rule that apply to two wastestreams: FGD wastewater and bottom ash 
transport water. See DCN SE06670. On August 14, 2017, EPA filed a 
motion to govern further proceedings in the U.S. Court of Appeals for 
the Fifth Circuit, which explained that EPA intends to conduct further 
rulemaking to potentially revise the new, more stringent BAT/PSES 
requirements in the 2015 Rule applicable to FGD wastewater and bottom 
ash transport water, and requested, in part, that the Court sever and 
hold in abeyance all judicial proceedings concerning portions of the 
2015 Rule related to those particular requirements. On August 22, 2017, 
the Court granted EPA's motion.
    In an earlier action, EPA administratively postponed certain 
compliance dates that had not yet passed in part of the 2015 Rule 
pursuant to Section 705 of the Administrative Procedure Act (``APA''), 
5 U.S.C. 705, which states that ``[w]hen an agency finds that justice 
so requires, it may postpone the effective date of action taken by it 
pending judicial review.'' 82 FR 19005 (April 25, 2017). EPA had 
postponed the compliance dates as a

[[Page 43496]]

temporary measure pursuant to Section 705 to preserve the status quo 
while the litigation in the Fifth Circuit was pending and EPA's 
reconsideration was underway. Because EPA has decided to conduct 
further rulemaking to potentially revise the new, more stringent BAT 
limitations and PSES in the 2015 Rule applicable to two specific 
wastestreams (FGD wastewater and bottom ash transport water), and it is 
today finalizing a rule which postpones the associated compliance dates 
in the 2015 Rule pending its next rulemaking, there is no longer any 
need for the Agency to maintain its prior action pursuant to Section 
705 of the APA. EPA, hereby, withdraws that action.

II. Summary of Comments Received

    EPA received thousands of written comments on the proposed rule to 
postpone certain compliance dates in the 2015 Rule. EPA also held a 
public hearing on July 31, 2017. The comments on the proposed rule 
generally fall into one of four categories: (1) Support for 
postponement of compliance dates; (2) opposition to the postponement of 
compliance dates; (3) comments on the substantive requirements of the 
2015 Rule (which are outside the scope of this action, which concerns 
postponing certain compliance dates only); and (4) comments on the 
length of time that EPA should postpone the compliance dates.
    Commenters that support the postponement rule generally assert that 
the postponement is appropriate to prevent industry from spending 
``unnecessary resources'' until EPA completes its reconsideration of 
the 2015 Rule. Many commenters who support a postponement in compliance 
dates state that, given the substantial costs required to implement 
technology required to comply with the 2015 Rule, as well as the time 
needed for designing and optimizing treatment systems, certainty in the 
discharge requirements is needed and postponement of compliance dates 
allows for that. In addition, commenters argue that the Agency has both 
the authority and the responsibility to postpone the 2015 Rule until it 
completes any rulemaking following its reconsideration process.
    Comments on the length of the postponement generally assert that 
EPA should postpone the compliance dates for a minimum of two years, 
until EPA has taken final action on any rule revisions, or some time 
period beyond when EPA has taken final action on any rule revisions.
    Commenters that oppose the postponement rule generally assert that 
(1) the technology bases underlying the 2015 Rule are widely available 
and affordable now, many steam electric plants have already installed 
or are in the process of implementing these technologies, and 
postponing the compliance dates would hinder technology development; 
(2) any postponement allows power plants to continue to discharge 
pollutants that are harmful to public health and the environment, and 
the forgone public health and environmental benefits during any 
postponement outweigh the costs to industry; and (3) EPA lacks 
authority to postpone the compliance dates.

III. Rationale for Finalizing a Postponement of Compliance Dates

    In light of new information not contained in the record for the 
2015 Rule and the inherent discretion the Agency has to reconsider past 
policy decisions consistent with the CWA and other applicable law, EPA 
intends to conduct a new rulemaking regarding the appropriate 
technology bases and associated limits for the BAT/PSES requirements 
applicable to FGD wastewater and bottom ash transport water discharged 
from steam electric power plants. Given this, and after carefully 
considering comments received on the proposed rule, EPA finds it 
appropriate to postpone the earliest compliance dates for the new, more 
stringent, BAT effluent limitations and PSES applicable to FGD 
wastewater and bottom ash transport water in the 2015 Rule until it 
completes the new rulemaking. This maintains the 2015 Rule as a whole 
at this time, with the only change being to postpone specific 
compliance deadlines for two wastestreams. Thus, the earliest 
compliance dates for plants to meet the new, more stringent FGD 
wastewater and bottom ash wastewater limitations and standards in the 
2015 Rule, which were to be determined by the permitting authority as a 
date ``as soon as possible beginning November 1, 2018 . . .'', are now 
to be determined by the permitting authority as a date ``as soon as 
possible beginning November 1, 2020 . . . .'' EPA is not changing the 
``no later than'' date of December 31, 2023, because EPA is not aware 
that the 2023 date is an immediate driver for expenditures by plants 
(petitioners had requested relief from the ``fast-approaching 
compliance deadlines'' in the 2015 Rule), and EPA plans to take up the 
appropriate compliance period in its next rulemaking. In order to be 
absolutely clear about what is being postponed, the final rule includes 
more precise regulatory text to implement the rule than was included in 
the proposed rule.
    Agencies have inherent authority to reconsider past decisions and 
to revise, replace or repeal a decision to the extent permitted by law 
and supported by a reasoned explanation. FCC v. Fox Television 
Stations, Inc., 556 U.S. 502, 515 (2009); Motor Vehicle Mfrs. Ass'n v. 
State Farm Mutual Auto. Ins. Co., 463 U.S. 29, 42 (1983). See also 
Nat'l Ass'n of Home Builders v. EPA, 682 F.3d 1032, 1038 & 1043 (D.C. 
Cir. 2012). Particularly relevant here, the CWA expressly authorizes 
EPA to revise effluent limitations and standards. 33 U.S.C. 1311(d), 
1314(b), (g)(1), (m)(1)(A), 1317(b)(2). Moreover, in doing so, Section 
304(b)(2)(B) of the CWA directs EPA to consider several factors, 
including ``other factors as the Administrator deems appropriate,'' and 
the Agency is afforded considerable discretion in deciding how much 
weight to give each factor. See, e.g., Weyerhaeuser Co. v. Costle, 590 
F.2d 1011, 1045 (D.C. Cir. 1978). In this case, where EPA has decided 
to undertake a new rulemaking, which may result in substantive changes 
to the 2015 Rule, that is an appropriate factor to consider and one 
that warrants the postponement of compliance dates for the new, more 
stringent BAT and PSES requirements for two wastestreams in the 2015 
Rule, until such a rulemaking is complete (i.e., EPA issues any final 
rule that substantively revises the 2015 Rule or EPA decides not to 
issue such a final rule). This will prevent the potentially needless 
expenditure of resources during a rulemaking that may ultimately change 
the 2015 Rule in these respects.
    As mentioned, some commenters stated that the record for the 2015 
Rule demonstrates that the technologies underlying the new, more 
stringent requirements for FGD wastewater and bottom ash transport 
water are widely available and affordable. Notwithstanding statements 
in the 2015 Rule record, certain parties have raised serious concerns 
about the availability and affordability of the technology basis for 
the FGD wastewater and bottom ash transport water requirements in the 
2015 Rule, and the Administrator wishes to take some time to carefully 
review these requirements in light of those concerns and ensure any 
such requirements are technologically available and economically 
achievable within the meaning of the statute. EPA has discretion in 
determining technological availability and economic achievability and 
is not constrained by the CWA to make the same policy decision as the 
former Administration, so long as its decision is reasonable. As 
explained above, the Agency may

[[Page 43497]]

reconsider past policy decisions consistent with the Clean Water Act 
and other applicable law. The Agency may also reconsider technical 
determinations in light of new information submitted to the Agency that 
was not in the record for the 2015 Rule. EPA intends to fully evaluate 
all of the issues raised in the petitions, including concerns about: 
Cost and impacts to steam electric facilities, public availability of 
information on which the rule is based, lack of data for plants that 
burn certain types of coal, and validity of certain pollutant data used 
in EPA's 2015 Rule analysis. For example, petitioners raised concerns 
about the numerical BAT limitations and PSES applicable to FGD 
wastewater in the 2015 Rule. They assert that there are differences 
among coal types that affect the performance and costs of biological 
treatment and that EPA did not have data to demonstrate the performance 
of biological treatment on all coal types. To resolve this concern, 
following the rulemaking, industry collected (and continues to collect) 
additional data on the performance of biological treatment for 
different coal types. As another example, petitioners raised questions 
about the inclusion and validity of certain data due, in part, to what 
they assert are flaws in data acceptance criteria, obsolete analytical 
methods, and the treatment of non-detect analytical results, which 
petitioners believed resulted in an overestimation of pollutant 
loadings for bottom ash transport water. EPA agrees that these are 
important issues that warrant further consideration in conjunction with 
the statutory factors for determining BAT for these wastestreams. EPA 
thus intends to re-evaluate these and other concerns raised in the 
petitions in the next rulemaking. EPA acknowledges that postponement of 
certain of the 2015 Rule's compliance dates may be disruptive to 
vendors and treatment technology suppliers. EPA, however, must also 
consider the substantial investments required by the steam electric 
power industry to comply with the BAT limitations and PSES,\3\ and that 
certainty regarding the limitations and standards deserves prominent 
consideration by the Agency when these limitations and standards may 
change. As UWAG pointed out in its April 13, 2017 letter, ``a rule of 
this magnitude and complexity requires substantial time to come into 
compliance for multiple wastestreams. Detailed studies and planning, 
followed by large capital expenditures and subsequent installation and 
testing, are time-consuming.'' Companies have been evaluating their 
compliance options and are reaching the point at which they will be 
committing funds, incurring costs, or commencing construction to 
install technologies.
---------------------------------------------------------------------------

    \3\ In the 2015 Rule, EPA estimated the total annualized pre-tax 
compliance costs for the FGD and bottom ash requirements to be 
$486.8 million. See DCN SE05978.
---------------------------------------------------------------------------

    As part of the 2015 Rule, EPA estimated the costs associated with 
compliance with the 2015 Rule's new requirements. For all applicable 
wastestreams, EPA assessed the operations and treatment system 
components, identified equipment and process changes that the plant 
would likely make to meet the 2015 Rule, and estimated the cost to 
implement those changes. This includes, among other things, the capital 
costs of installing the technology (based on estimates of the 
technology selected as representing the level of control) and the 
operation and maintenance costs of operating the technology. See 
Technical Development Document (``TDD''), pp. 9-1 through 9-52. EPA 
estimated that the total post-tax annualized compliance costs would be 
$339.6 million/year. See Regulatory Impact Analysis (``RIA''), Table 3-
2 (Option D).\4\
---------------------------------------------------------------------------

    \4\ EPA analyzed both pre-tax and post-tax costs. Pre-tax costs 
provide insight on the total expenditures as initially incurred by 
the plants. Post-tax costs are a more meaningful measure of 
compliance impact on privately owned for-profit plants, and 
incorporate approximate capital depreciation and other relevant tax 
treatments in the analysis. RIA, p. 3-6.
---------------------------------------------------------------------------

    The 2015 rulemaking record also describes evaluation of the initial 
capital costs that regulated parties would incur in the near term (if a 
stay were not in place) to meet the 2015 Rule's effluent limitations 
and standards. For the purpose of analysis, in the RIA, EPA assumed 
that all capital costs are incurred concurrently with technology 
installation according to discharge permit renewal schedules, but EPA 
realizes that feasibility studies and planning may need to be completed 
in advance of that date. Specifically, plants would incur engineering 
design costs, costs to acquire equipment, freight shipping costs to 
transport equipment from manufacturers to the installation site, costs 
for actions to prepare the site (such as installing concrete 
foundations and buildings for the new equipment), and construction 
expenses associated with connecting electrical and piping systems to 
new equipment. See TDD, p. 9-3. EPA estimated post-tax annualized 
capital costs of $204.4 million/year. See RIA, Table 3-2 (Option D). 
Although there is a wide degree of variability among the costs 
particular plants would expend, EPA estimates that the average post-tax 
annualized capital compliance costs for a plant would be approximately 
$1.5 million/year. See TDD, Table 9-19 (plants with compliance costs); 
RIA, Table 3-2 (Option D). To the extent that these costs are 
associated with the 2015 Rule requirements for FGD wastewater and 
bottom ash transport water, and in the event that EPA revises these 
requirements in a future rulemaking, these are costs that would be 
incurred for activities that ultimately might not be necessary. In that 
case, this would reflect costs incurred by facilities and potentially 
passed on to utility rate payers that ultimately did not need to be 
spent.
    In light of these imminent planning and capital expenditures that 
facilities incurring costs under the 2015 Rule would need to undertake 
in order to meet the earliest compliance deadlines for the new, more 
stringent limitations and standards in the 2015 Rule, and the fact that 
the Agency is conducting a new rulemaking regarding the appropriate 
technology bases and associated limits for BAT limitations and PSES 
applicable to FGD wastewater and bottom ash transport water, the Agency 
views it as appropriate to postpone the earliest compliance dates that 
have not yet passed for these wastestreams in 2015 Rule. This will 
preserve the regulatory status quo with respect to requirements for FGD 
wastewater and bottom ash transport water until the new rulemaking is 
complete.
    Some commenters also express concerns that postponement of 
compliance dates would hinder technology advancements. EPA's experience 
does not support this concern. The record for the 2015 Rule 
demonstrates that technology advancements were not hindered during that 
rulemaking. Rather, as explained in the preamble to the final 2015 
Rule, vendors continued to improve existing technologies and to develop 
new technologies during the rulemaking leading up to the 2015 Rule.
    EPA acknowledges that postponement of the compliance dates could 
lead to a delay in the accrual of some of the benefits attributable to 
the 2015 Rule. The 2015 Rule required that steam electric power plants 
would comply with the new, more stringent requirements no later than 
2023, with plants expected to implement new control technologies over a 
five-year compliance period of 2019-2023 according to their permit 
renewal schedule. In the record for the 2015 Rule, EPA estimated the 
value of certain benefits linked to reduced pollutant

[[Page 43498]]

discharges that could be monetized for the period 2019 through 2042. 
Based on the 2015 Rule data and methodology, and depending on the 
inclusion of the Clean Power Plan, EPA estimates that foregone 
annualized benefits for a two-year delay would be between $26.6 million 
and $33.6 million.\5\ EPA similarly estimates that plants would 
experience annualized cost savings of between $27.5 million and $36.8 
million as a result of a two-year delay. See DCN SE06668 for additional 
details, including calculations of the foregone benefits and cost 
savings. EPA understands that these estimates have uncertainty due to, 
for example, the possibility of unexpected implementation approaches, 
and thus that the actual cost savings could have been somewhat higher 
or lower than estimated. Similarly, due to data and analysis 
limitations, the forgone monetized benefits are likely underestimated. 
These estimates, however, are consistent with and reflect the best data 
and analysis available at the time of the 2015 Rule.
---------------------------------------------------------------------------

    \5\ The calculations are based on the benefits and costs 
estimated for the 2015 Rule, which were detailed in the ``Benefit 
and Cost Analysis for the Effluent Limitations Guidelines and 
Standards for the Steam Electric Power Generating Point Source 
Category'' (BCA) and ``Regulatory Impact Analysis for the Effluent 
Limitations Guidelines and Standards for the Steam Electric Power 
Generating Point Source Category'' (RIA) reports.
---------------------------------------------------------------------------

    EPA notes that, as explained earlier, there is uncertainty as to 
the FGD wastewater and bottom ash transport water BAT/PSES requirements 
while EPA conducts a new rulemaking. If EPA did not postpone the 
compliance dates, industry would likely incur costs as it prepares to 
comply with the 2015 Rule, irrespective of what EPA ultimately 
determines to be BAT/PSES for FGD wastewater and bottom ash transport 
water. By contrast, under the 2015 Rule, even if permits were written 
today, the earliest those permits would have required compliance with 
the limitations and standards at issue are ``as soon as possible 
beginning November 1, 2018.'' So, while some companies would have to 
plan to comply and spend money right away, the benefits would not begin 
to accrue until 2018, at the earliest. Also, these benefits may not be 
lost if a permitting authority requires similar effluent limitations 
where necessary to meet applicable water quality standards, under CWA 
section 301(b)(1)(C). EPA has carefully weighed the concerns about 
potentially foregone benefits with the consideration of the costs that 
could needlessly be incurred should the requirements be changed, as 
well as the overall uncertainty and potential confusion that would be 
caused by imposing the 2015 Rule requirements while simultaneously 
undertaking rulemaking that may change those requirements. On balance, 
EPA has concluded the more reasonable approach is to postpone the 
compliance dates in the 2015 Rule.
    Thus, EPA agrees with commenters who argue that it should postpone 
the new, more stringent BAT/PSES requirements for FGD wastewater and 
bottom ash transport water in the 2015 Rule until it completes a new 
rulemaking on these wastestreams. After reflecting on the time it 
typically takes the Agency to propose and finalize revised effluent 
limitations guidelines and standards, and in light the characteristics 
of this industry and the anticipated scope of the next rulemaking, EPA 
projects it will take approximately three years to propose and finalize 
a new rule (Fall 2020). See DCN SE06667. Consequently, EPA is 
postponing the earliest compliance dates for the new, more stringent, 
BAT effluent limitations and PSES for FGD wastewater and bottom ash 
transport water for a period of two years (November 1, 2020).\6\ To the 
extent that commenters believe a postponement under this rule should 
last beyond the time it takes EPA to complete its new rulemaking, such 
comments are appropriately considered as part of, and in light of, that 
new rulemaking and not this action. As explained, this rule is intended 
only as a relatively short-term measure until EPA completes the next 
rulemaking, and EPA anticipates that the next rulemaking will 
necessarily address compliance dates in some fashion. Although EPA 
proposed to postpone the compliance dates for the new, more stringent 
requirements applicable to fly ash transport water, gasification 
wastewater, and flue gas mercury control (FGMC) wastewater, in addition 
to the requirements for FGD wastewater and bottom ash transport water, 
this final rule does not postpone those former compliance dates. 
Commenters stated that EPA has no basis to postpone compliance dates 
for requirements that parties have not expressly argued should be 
reconsidered, such as those for fly ash transport water and FGMC 
wastewater. EPA agrees that the final rule should postpone only those 
requirements that the Agency plans to potentially revise in the next 
rulemaking. Because EPA is not conducting a new rulemaking concerning 
any of the other issues addressed by the 2015 Rule, including 
requirements for fly ash transport water, gasification wastewater, and 
FGMC wastewater, EPA is not changing the compliance dates for these 
wastestreams or any of the other compliance dates for the requirements 
in that Rule. The record for the 2015 Rule demonstrates that changes 
associated with converting a fly ash system are unrelated from an 
engineering perspective to conversions/upgrades for bottom ash 
transport water and FGD treatment systems. Converting a fly ash system 
requires installing a silo to capture the dry fly ash, which is 
subsequently transported offsite to beneficial reuse markets (e.g., 
cement plants) or landfilled. Bottom ash is handled separately, 
regardless of whether it is wet or dry. The same is true for FGD 
wastes. EPA recognizes however, that from a financing and long-term 
planning perspective, there are advantages to a facility in knowing the 
full suite of requirements it will need to comply with over a longer 
term planning horizon.
---------------------------------------------------------------------------

    \6\ If EPA does not complete a new rulemaking by November, 2020, 
it plans to further postpone the compliance dates such that the 
earliest compliance date is not prior to completion of a new 
rulemaking.
---------------------------------------------------------------------------

    Some facilities commented that they may need to know what the 
ultimate requirements will be for bottom ash transport water and FGD 
wastewater to assist them in considering alternatives for meeting the 
requirements for the other waste streams (fly ash transport water and 
FGMC wastewater) for which EPA is not postponing the earliest 
compliance dates. EPA notes that there continues to be discretion under 
the 2015 Rule for permitting authorities to consider: Time needed to 
``expeditiously plan (including time to raise capital), design, 
procure, and install equipment'' to comply with the rule; changes being 
made at the plant to comply with several other rules; and ``other 
factors as appropriate'' in determining exactly when, within a 
specified compliance period, the 2015 Rule's new, more stringent 
limitations apply to any given plant. See 40 CFR 423.11(t).
    In light of the compliance date postponements being finalized 
today, in determining the ``as soon as possible date,'' EPA believes it 
would be reasonable for permitting authorities to consider the need for 
a facility to make integrated planning decisions regarding compliance 
with the requirements for all of the wastestreams currently subject to 
new, more stringent requirements in the 2015 Rule, as well as the other 
rules identified in Sec.  423.11(t) to the extent that a facility 
demonstrates such a need. This could include harmonizing schedules to 
the extent provided for

[[Page 43499]]

under the 2015 Rule \7\ for meeting the 2015 Rule requirements for fly 
ash transport water and FGMC wastewater to allow time for a facility to 
have certainty regarding what their ultimate requirements will be under 
the steam electric ELGs, as well as the requirements under the other 
rules listed in Sec.  423.11(t).
---------------------------------------------------------------------------

    \7\ For any final effluent limitation that is specified to 
become applicable after November 1, 2018, the specified date must be 
as soon as possible, but in no case later than December 31, 2023.
---------------------------------------------------------------------------

    This rule is effective immediately upon publication. Section 553(d) 
of the Administrative Procedure Act, 5 U.S.C. 553(d), provides that 
publication of a substantive rule must be made no less than 30 days 
before its effective date, subject to several exceptions. Section 
553(d)(1) establishes an exception for ``a substantive rule which 
grants or recognizes an exemption or relieves a restriction.'' The 
exception in Section 553(d)(1) reflects the purpose of the 30-day 
notice requirement, which is to give affected entities time to prepare 
for the effective date of a rule or to take any other action which the 
issuance of a rule may prompt. This rule fits within Section 553(d)(1) 
because it postpones certain requirements on steam electric power 
plants to control their pollutant discharges by two years, and as a 
result, it relieves a restriction on regulated entities for that 
period.

IV. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review; and, 
Executive Order 13563: Improving Regulation and Regulatory Review

    This action is a significant regulatory action that was submitted 
to the Office of Management and Budget (OMB) for review. Any changes 
made in response to OMB recommendations have been documented in the 
docket.

B. Executive Order 13771: Reducing Regulations and Controlling 
Regulatory Costs

    This action is considered an Executive Order 13771 deregulatory 
action. Details on the estimated cost savings of this final rule can be 
found in EPA's analysis of the potential costs and benefits associated 
with this action.

C. Paperwork Reduction Act

    This final rule does not involve any information collection 
activities subject to the PRA, 44 U.S.C. 3501 et seq.

D. Regulatory Flexibility Act (RFA)

    I certify that this action will not have a significant economic 
impact on a substantial number of small entities under the RFA. In 
making this determination, the impact of concern is any significant 
adverse economic impact on small entities. An agency may certify that a 
rule will not have a significant economic impact on a substantial 
number of small entities if the rule relieves regulatory burden, has no 
net burden or otherwise has a positive economic effect on the small 
entities subject to the rule. This action maintains the 2015 Rule as a 
whole at this time, with the only change being to postpone specific 
compliance deadlines for two wastestreams. As described above, EPA 
estimates that steam electric plants, including some small entities, 
would experience annualized cost savings of $27.5 million as a result 
of this two-year delay. We have therefore concluded that this action 
will relieve regulatory burden for some directly regulated small 
entities.

E. Unfunded Mandates Reform Act (UMRA)

    This action does not contain an unfunded mandate of $100 million or 
more as described in UMRA, 2 U.S.C. 1531-1538, and does not 
significantly or uniquely affect small governments.

F. Executive Order 13132: Federalism

    This action does not have federalism implications, as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999). It will not have 
substantial direct effects on the States, on the relationship between 
the national government and the States, or on the distribution of power 
and responsibilities among the various levels of government.

G. Executive Order 13175: Consultation and Coordination With Indian 
Tribal Governments

    This action does not have Tribal implications, as specified in 
Executive Order 13175 (65 FR 67249, November 9, 2000).

H. Executive Order 13045: Protection of Children From Environmental 
Health Risks and Safety Risks

    This final rule is not subject to Executive Order 13045 (62 FR 
19885, April 23, 1997) because EPA previously determined that the 
environmental health risks or safety risks addressed by the 
requirements EPA is finalizing do not present a disproportionate risk 
to children.

I. Executive Order 13211: Actions Concerning Regulations That 
Significantly Affect Energy Supply, Distribution, or Use

    This action is not a ``significant energy action'' because it is 
not likely to have a significant adverse effect on the supply, 
distribution or use of energy.

J. National Technology Transfer and Advancement Act (NTTAA)

    This rulemaking does not involve technical standards that would 
require Agency consideration under NTTAA section 12(d), 15 U.S.C. 272 
note.

K. Executive Order 12898: Federal Actions To Address Environmental 
Justice in Minority Populations and Low-Income Populations

    This is a final rule to delay action, and it does not change the 
requirements of the effluent limitations guidelines and standards 
published in 2015. While the postponement in compliance dates could 
delay the protection the 2015 Rule would afford to all communities, 
including those impacted disproportionately by the pollutants in 
certain wastewater discharges, this action would not change any impacts 
of the 2015 Rule upon implementation. The EPA therefore believes it is 
more appropriate to consider the impact on minority and low-income 
populations in the context of possible substantive changes as part of 
any future rulemaking.

L. Congressional Review Act

    This action is subject to the CRA, and the EPA will submit a rule 
report to each House of the Congress and to the Comptroller General of 
the United States. This action is a not a ``major rule'' as defined by 
5 U.S.C. 804(2).

List of Subjects in 40 CFR Part 423

    Environmental protection, Electric power generation, Power plants, 
Waste treatment and disposal, Water pollution control.

    Dated: September 12, 2017.
E. Scott Pruitt,
Administrator.
    For reasons stated in the preamble, EPA amends 40 CFR part 423 as 
set forth below:

PART 423--STEAM ELECTRIC POWER GENERATING POINT SOURCE CATEGORY

0
1. The authority citation for part 423 continues to read as follows:

    Authority:  Secs. 101; 301; 304(b), (c), (e), and (g); 306; 307; 
308 and 501, Clean Water Act (Federal Water Pollution Control Act

[[Page 43500]]

Amendments of 1972, as amended; 33 U.S.C. 1251; 1311; 1314(b), (c), 
(e), and (g); 1316; 1317; 1318 and 1361).


0
2. Amend Sec.  423.11 by revising paragraph (t) introductory text to 
read as follows:


Sec.  423.11   Specialized definitions.

* * * * *
    (t) The phrase ``as soon as possible'' means November 1, 2018 
(except for purposes of Sec.  423.13(g)(1)(i) and (k)(1)(i), and Sec.  
423.16(e) and (g), in which case it means November 1, 2020), unless the 
permitting authority establishes a later date, after receiving 
information from the discharger, which reflects a consideration of the 
following factors:
* * * * *


Sec.  423.13   [Amended]

0
3. Amend Sec.  423.13 paragraphs (g)(1)(i) and (k)(1)(i) by removing 
the text ``November 1, 2018'' and adding the text ``November 1, 2020'' 
in its place.


Sec.  423.16   [Amended]

0
4. Amend Sec.  423.16 paragraphs (e) two times, and (g) by removing the 
text ``November 1, 2018'' and adding the text ``November 1, 2020'' in 
its place.

[FR Doc. 2017-19821 Filed 9-15-17; 8:45 am]
 BILLING CODE 6560-50-P