Clean River Power MR-2, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene and Protest, 43348-43349 [2017-19567]
Download as PDF
43348
Federal Register / Vol. 82, No. 178 / Friday, September 15, 2017 / Notices
link. Click on the eLibrary link, click on
General Search and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., CP17–
481). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
NYISO Operating Committee Meeting
DEPARTMENT OF ENERGY
September 15, 2017, 10:00 a.m.–4:00
p.m. (EST)
Federal Energy Regulatory
Commission
Dated: September 6, 2017.
Kimberly D. Bose,
Secretary.
September 27, 2017, 10:00 a.m.–4:00
p.m. (EST)
[FR Doc. 2017–19561 Filed 9–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc. (NYISO):
NYISO Business Issues Committee
Meeting
mstockstill on DSK30JT082PROD with NOTICES
September 12, 2017, 10:00 a.m.–4:00
p.m. (EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents
.jsp?com=bic&directory=2017-09-12.
VerDate Sep<11>2014
17:07 Sep 14, 2017
Jkt 241001
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.
jsp?com=oc&directory=2017-09-15.
NYISO Electric System Planning
Working Group Meeting
September 26, 2017, 10:00 a.m.–4:00
p.m. (EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2017-09-26.
NYISO Management Committee
Meeting
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/
documents.jsp?com=mc&directory
=2017-09-27.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER13–102.
New York Independent System
Operator, Inc., Docket No. ER15–2059.
New York Transco, LLC, Docket No.
ER15–572.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: September 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19562 Filed 9–14–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
[Project No. P–13407–004]
Clean River Power MR–2, LLC; Notice
of Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene and Protest
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Applications: Amendment
of License.
b. Project No.: 13407–004.
c. Date filed: May 23, 2017.
d. Applicant: Clean River Power MR–
2, LLC, a subsidiary of Free Flow Power
Corporation.
e. Name of Project: Lowell Lock and
Dam Water Power Project.
f. Location: The proposed project
would be located at the existing Lowell
Lock and Dam on the Muskingum River
in Washington County, West of the City
of Lowell, Ohio. The lock and dam was
formally owned and operated by the
U.S. Army Corps of Engineers, but is
currently owned and operated by the
Ohio Department of Natural Resources,
Division of Parks and Recreation.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contacts: Ramya
Swaminathan, Chief Operating Officer,
Free Flow Power Corporation, 239
Causeway Street, Suite 300, Boston, MA
02114; (978) 283–2822, or by email at:
Ramya@ryedevelopment.com.
i. FERC Contact: M. Joseph Fayyad
(202) 502–8759, or by email at
mo.fayyad@ferc.gov.
j. Deadline for filing comments,
motions to intervene and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
E:\FR\FM\15SEN1.SGM
15SEN1
mstockstill on DSK30JT082PROD with NOTICES
Federal Register / Vol. 82, No. 178 / Friday, September 15, 2017 / Notices
The first page of any filing should
include docket number P–13407–004.
k. Description of currently authorized
project: The authorized but
unconstructed project works consist of:
(a) An existing 840-foot-long, 18-foothigh timber crib and concrete dam that
contains a full-length, uncontrolled
spillway having a crest elevation of
607.06 feet North American Vertical
Datum of 1988; (b) an existing 628-acre
impoundment with a volume of 4,492
acre-feet at the crest elevation of the
dam; (c) a new 215-foot-long by 165foot-wide by 23-foot-deep intake
channel to be excavated upstream of the
dam to convey flows to be used for
generation into the powerhouse; (d) a
new 37-foot-long by 80-foot-wide by 52foot-high intake structure equipped with
trashracks containing 2-inch clear bar
spacing; (e) a new 160-foot-long by 75foot-wide by 66-foot-high concrete
powerhouse located immediately
downstream of the dam on the north
river bank containing two 2.5-megawatt
horizontal Kaplan turbine/generator
units; (f) a new 143.5-foot-long dam
abutment located adjacent to the
powerhouse to serve as an overflow
weir to maintain the existing overflow
capacity of the dam; (g) a new 100-footlong by 125-foot-wide by 24-foot-deep
tailrace channel located immediately
downstream of the powerhouse to
return flows exiting the powerhouse to
the Muskingum River; (h) a new 40-footlong by 40-foot-wide substation located
adjacent to the north end of the dam; (i)
a new 135-foot-long, 4.16-kilovolt (kV)
transmission cable that connects the
powerhouse to the substation; (j) a new
1,200-foot-long, 69-kV overhead
transmission line that connects the
substation to a local utility distribution
line; (k) a new 150-foot-long access road
and a new 1,800-square-foot parking lot
located at the south end of the dam; and
(l) appurtenant facilities.
l. Description of Amendment: The
licensee proposes certain design
changes to the project’s works as
follows: (1) Change the location of the
project works form the north side to the
south side of the dam; (2) the tailrace
channel will be 255-foot-long by 170foot-wide by 28-foot-deep; and (3) the
transmission line will be a 150-footlong, 4.16-kV transmission line that
connects the powerhouse to the
substation and a 2,375-foot-long, 69-kV
transmission line that connects the
substation to the local utility
distribution line. Most of the 69-kV
transmission line will be submerged
behind the dam.
m. Location of the Application: A
copy of the application is available for
inspection and reproduction at the
VerDate Sep<11>2014
17:07 Sep 14, 2017
Jkt 241001
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. The filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervener
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
43349
Dated: September 7, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19567 Filed 9–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM01–5–000]
Electronic Tariff Filings; Notice
Regarding Footnotes, Headers, or
Footers in Tariff Text in the
Commission’s E-Tariff System
Take notice that the Commission’s
electronic tariff system (eTariff) does not
reproduce footnotes, headers, or footers
in the Real-Text-Format (RTF) tariff text
posted on the Commission’s Web site
(https://etariff.ferc.gov/TariffList.aspx).1
To the extent footnotes, headers or
footers are needed in tariff text, filers
should enter them separately in the
body of the document on each page
where needed rather than by using
automatic features of the word
processing program.
Dated: September 6, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19563 Filed 9–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–491–000]
Perryville Gas Storage LLC; Notice of
Application
Take notice that on June 23, 2017,
Perryville Gas Storage LLC (Perryville),
having its principal place of business at
Three Riverway, Suite 1350, Houston,
Texas 77056, filed in the above
referenced docket an application
pursuant to section 7(c) of the Natural
Gas Act (NGA), and Part 157 of the
Commission’s regulations for an order
amending the certificate of public
convenience and necessity issued in
Docket No. CP09–418–000, and
amended in Docket Nos. CP11–159–000,
CP12–460–000 and CP13–23–000, to
authorize Perryville to make certain
1 This applies to footnotes created
programmatically by the word processing software,
such as the Insert Footnote Tool in Microsoft Word,
and text added to the header or footer areas of a
document, such as using the Insert Header or Footer
Tool in Microsoft Word or clicking in the header
or footer areas of the document.
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 82, Number 178 (Friday, September 15, 2017)]
[Notices]
[Pages 43348-43349]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19567]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-13407-004]
Clean River Power MR-2, LLC; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene and Protest
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection.
a. Type of Applications: Amendment of License.
b. Project No.: 13407-004.
c. Date filed: May 23, 2017.
d. Applicant: Clean River Power MR-2, LLC, a subsidiary of Free
Flow Power Corporation.
e. Name of Project: Lowell Lock and Dam Water Power Project.
f. Location: The proposed project would be located at the existing
Lowell Lock and Dam on the Muskingum River in Washington County, West
of the City of Lowell, Ohio. The lock and dam was formally owned and
operated by the U.S. Army Corps of Engineers, but is currently owned
and operated by the Ohio Department of Natural Resources, Division of
Parks and Recreation.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contacts: Ramya Swaminathan, Chief Operating Officer,
Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA
02114; (978) 283-2822, or by email at: Ramya@ryedevelopment.com.
i. FERC Contact: M. Joseph Fayyad (202) 502-8759, or by email at
mo.fayyad@ferc.gov.
j. Deadline for filing comments, motions to intervene and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426.
[[Page 43349]]
The first page of any filing should include docket number P-13407-004.
k. Description of currently authorized project: The authorized but
unconstructed project works consist of: (a) An existing 840-foot-long,
18-foot-high timber crib and concrete dam that contains a full-length,
uncontrolled spillway having a crest elevation of 607.06 feet North
American Vertical Datum of 1988; (b) an existing 628-acre impoundment
with a volume of 4,492 acre-feet at the crest elevation of the dam; (c)
a new 215-foot-long by 165-foot-wide by 23-foot-deep intake channel to
be excavated upstream of the dam to convey flows to be used for
generation into the powerhouse; (d) a new 37-foot-long by 80-foot-wide
by 52-foot-high intake structure equipped with trashracks containing 2-
inch clear bar spacing; (e) a new 160-foot-long by 75-foot-wide by 66-
foot-high concrete powerhouse located immediately downstream of the dam
on the north river bank containing two 2.5-megawatt horizontal Kaplan
turbine/generator units; (f) a new 143.5-foot-long dam abutment located
adjacent to the powerhouse to serve as an overflow weir to maintain the
existing overflow capacity of the dam; (g) a new 100-foot-long by 125-
foot-wide by 24-foot-deep tailrace channel located immediately
downstream of the powerhouse to return flows exiting the powerhouse to
the Muskingum River; (h) a new 40-foot-long by 40-foot-wide substation
located adjacent to the north end of the dam; (i) a new 135-foot-long,
4.16-kilovolt (kV) transmission cable that connects the powerhouse to
the substation; (j) a new 1,200-foot-long, 69-kV overhead transmission
line that connects the substation to a local utility distribution line;
(k) a new 150-foot-long access road and a new 1,800-square-foot parking
lot located at the south end of the dam; and (l) appurtenant
facilities.
l. Description of Amendment: The licensee proposes certain design
changes to the project's works as follows: (1) Change the location of
the project works form the north side to the south side of the dam; (2)
the tailrace channel will be 255-foot-long by 170-foot-wide by 28-foot-
deep; and (3) the transmission line will be a 150-foot-long, 4.16-kV
transmission line that connects the powerhouse to the substation and a
2,375-foot-long, 69-kV transmission line that connects the substation
to the local utility distribution line. Most of the 69-kV transmission
line will be submerged behind the dam.
m. Location of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. The filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Motions to Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``MOTION TO
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervener must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: September 7, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-19567 Filed 9-14-17; 8:45 am]
BILLING CODE 6717-01-P