Download as PDF Federal Register / Vol. 82, No. 176 / Wednesday, September 13, 2017 / Notices Commission Meeting—Open to the Public. MATTER TO BE CONSIDERED: Briefing Matter: Fiscal Year 2018 Operating Plan. A live webcast of the Meeting can be viewed at https://www.cpsc.gov/live. CONTACT PERSON FOR MORE INFORMATION: Rockelle Hammond, Office of the Secretary, U.S. Consumer Product Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504–7923. STATUS: Dated: September 11, 2017. Alberta E. Mills, Acting Secretary. [FR Doc. 2017–19548 Filed 9–11–17; 4:15 pm] BILLING CODE 6355–01–P DEPARTMENT OF ENERGY [OE Docket No. EA–439] Application To Export Electric Energy; J. Aron & Company LLC Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. AGENCY: J. Aron & Company LLC (Applicant) has applied for authority to transmit electric energy from the United States to Mexico pursuant to the Federal Power Act. DATES: Comments, protests, or motions to intervene must be submitted on or before October 13, 2017. ADDRESSES: Comments, protests, motions to intervene, or requests for more information should be addressed to: Office of Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585–0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to Electricity.Exports@ hq.doe.gov, or by facsimile to 202–586– 8008. SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)). On August 17, 2017, DOE received an application from the Applicant for authority to transmit electric energy from the United States to Mexico as a power marketer for a five-year term sradovich on DSK3GMQ082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:34 Sep 12, 2017 Jkt 241001 using existing international transmission facilities. In its application, the Applicant states that it does not own or control any electric generation or transmission facilities, and it does not have a franchised service area. The electric energy that the Applicant proposes to export to Mexico would be surplus energy purchased from third parties such as electric utilities and Federal power marketing agencies pursuant to voluntary agreements. The existing international transmission facilities to be utilized by the Applicant have previously been authorized by Presidential Permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties. PROCEDURAL MATTERS: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission’s (FERC) Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above. Comments and other filings concerning the Applicant’s application to export electric energy to Mexico should be clearly marked with OE Docket No. EA–439. An additional copy is to be provided to both Kelly Brooks, J. Aron & Company LLC, 200 West Street, 6th Floor, New York, NY 10282 and Ricardo Alicea, J. Aron & Company LLC, 200 West Street, 15th Floor, New York, NY 10282. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE’s National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https://energy.gov/ node/11845, or by emailing Angela Troy at Angela.Troy@hq.doe.gov. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 43003 Issued in Washington, DC, on September 5, 2017. Christopher Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2017–19407 Filed 9–12–17; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. EA–440] Application To Export Electric Energy; Plant-E Corp. Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. AGENCY: Plant-E Corp (Applicant) has applied for authority to transmit electric energy from the United States to Canada pursuant to the Federal Power Act. DATES: Comments, protests, or motions to intervene must be submitted on or before October 13, 2017. ADDRESSES: Comments, protests, motions to intervene, or requests for more information should be addressed to: Office of Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585–0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to Electricity.Exports@ hq.doe.gov, or by facsimile to 202–586– 8008. SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)). On August 18, 2017, DOE received an application from the Applicant for authority to transmit electric energy from the United States to Canada as a power marketer for a five-year term using existing international transmission facilities. In its application, the Applicant states that it does not own or control any electric generation or transmission facilities, and it does not have a franchised service area. The electric energy that the Applicant proposes to export to Canada would be surplus energy purchased from third parties such as electric utilities and Federal power marketing agencies pursuant to voluntary agreements. The existing SUMMARY: E:\FR\FM\13SEN1.SGM 13SEN1 43004 Federal Register / Vol. 82, No. 176 / Wednesday, September 13, 2017 / Notices international transmission facilities to be utilized by the Applicant have previously been authorized by Presidential Permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties. Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission’s (FERC) Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above. Comments and other filings concerning the Applicant’s application to export electric energy to Canada should be clearly marked with OE Docket No. EA–440. An additional copy is to be provided to Pierre Plante, PlantE Corp., 740 St Maurice, Suite 209, Montreal, Quebec H3C 1L5. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE’s National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https://energy.gov/ node/11845, or by emailing Angela Troy at Angela.Troy@hq.doe.gov. Issued in Washington, DC, on September 5, 2017. Christopher Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2017–19424 Filed 9–12–17; 8:45 am] BILLING CODE 6450–01–P sradovich on DSK3GMQ082PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–173–000. VerDate Sep<11>2014 17:34 Sep 12, 2017 Jkt 241001 Applicants: Southern California Edison Company. Description: Application for Authorization under Section 203 of the FPA to Merge Jurisdictional Facilities of Southern California Edison Company. Filed Date: 9/6/17. Accession Number: 20170906–5181. Comments Due: 5 p.m. ET 9/27/17. Docket Numbers: EC17–174–000. Applicants: Consolidated Edison Company of New York, Inc. Description: Application of Consolidated Edison Company of New York, Inc. under New Docket for an order pursuant to Section 203 of the Federal Power Act. Filed Date: 9/6/17. Accession Number: 20170906–5183. Comments Due: 5 p.m. ET 9/27/17. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–149–000. Applicants: CA Flats Solar 150, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator (EWG) of CA Flats Solar 150, LLC. Filed Date: 9/6/17. Accession Number: 20170906–5178. Comments Due: 5 p.m. ET 9/27/17. Docket Numbers: EG17–150–000. Applicants: Florey Knob Energy LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Florey Knob Energy LLC. Filed Date: 9/7/17. Accession Number: 20170907–5054. Comments Due: 5 p.m. ET 9/28/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3069–007; ER10–3070–007. Applicants: Alcoa Power Generating Inc., Alcoa Power Marketing LLC. Description: Supplement to June 27, 2017 Southeast Regional Triennial Submission and Notice of Change in Status of the Alcoa Subsidiaries. Filed Date: 9/6/17. Accession Number: 20170906–5192. Comments Due: 5 p.m. ET 9/27/17. Docket Numbers: ER17–1795–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Deficiency Response in ER17–1795— Classify Service Upgrade as Base Plan Upgrade to be effective 8/8/2017. Filed Date: 9/7/17. Accession Number: 20170907–5166. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2185–001. Applicants: Great Valley Solar 1, LLC. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Description: Tariff Amendment: Great Valley Solar 1, LLC Amendment to SFA Filing and Request to be effective 10/1/ 2017. Filed Date: 9/7/17. Accession Number: 20170907–5115. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2193–001. Applicants: Great Valley Solar 1, LLC. Description: Tariff Amendment: Great Valley Solar 1, LLC Amendment to LGIA CTA Filing and Request to be effective 10/1/2017. Filed Date: 9/7/17. Accession Number: 20170907–5117. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2434–001. Applicants: Duke Energy Progress, LLC. Description: Tariff Amendment: Amendment to Filing in ER17–2434 to be effective 7/1/2017. Filed Date: 9/7/17. Accession Number: 20170907–5138. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2441–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3356 Milligan 1 Wind LLC Generator Interconnection Agreement to be effective 8/24/2017. Filed Date: 9/7/17. Accession Number: 20170907–5000. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2442–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3357 Monument Road Wind LLC Generator Interconnection Agreement to be effective 8/24/2017. Filed Date: 9/7/17. Accession Number: 20170907–5001. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2443–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–09–07_SA 3046 Upland PrairieMEC GIA (J455) to be effective 8/23/ 2017. Filed Date: 9/7/17. Accession Number: 20170907–5021. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2444–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–09–07_SA 3045 Ida Grove-MEC GIA (J412) to be effective 8/23/2017. Filed Date: 9/7/17. Accession Number: 20170907–5065. Comments Due: 5 p.m. ET 9/28/17. Docket Numbers: ER17–2445–000. Applicants: MET New York Trading LLC. E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 82, Number 176 (Wednesday, September 13, 2017)]
[Notices]
[Pages 43003-43004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19424]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-440]


Application To Export Electric Energy; Plant-E Corp.

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Plant-E Corp (Applicant) has applied for authority to transmit 
electric energy from the United States to Canada pursuant to the 
Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before October 13, 2017.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
Electricity.Exports@hq.doe.gov, or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On August 18, 2017, DOE received an application from the Applicant 
for authority to transmit electric energy from the United States to 
Canada as a power marketer for a five-year term using existing 
international transmission facilities.
    In its application, the Applicant states that it does not own or 
control any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that the 
Applicant proposes to export to Canada would be surplus energy 
purchased from third parties such as electric utilities and Federal 
power marketing agencies pursuant to voluntary agreements. The existing

[[Page 43004]]

international transmission facilities to be utilized by the Applicant 
have previously been authorized by Presidential Permits issued pursuant 
to Executive Order 10485, as amended, and are appropriate for open 
access transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
copies of such comments, protests, or motions to intervene should be 
sent to the address provided above on or before the date listed above.
    Comments and other filings concerning the Applicant's application 
to export electric energy to Canada should be clearly marked with OE 
Docket No. EA-440. An additional copy is to be provided to Pierre 
Plante, Plant-E Corp., 740 St Maurice, Suite 209, Montreal, Quebec H3C 
1L5.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at https://energy.gov/node/11845, or by 
emailing Angela Troy at Angela.Troy@hq.doe.gov.

    Issued in Washington, DC, on September 5, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-19424 Filed 9-12-17; 8:45 am]