Application To Export Electric Energy; Plant-E Corp., 43003-43004 [2017-19424]
Download as PDF
Federal Register / Vol. 82, No. 176 / Wednesday, September 13, 2017 / Notices
Commission Meeting—Open to
the Public.
MATTER TO BE CONSIDERED: Briefing
Matter: Fiscal Year 2018 Operating Plan.
A live webcast of the Meeting can be
viewed at https://www.cpsc.gov/live.
CONTACT PERSON FOR MORE INFORMATION:
Rockelle Hammond, Office of the
Secretary, U.S. Consumer Product
Safety Commission, 4330 East West
Highway, Bethesda, MD 20814, (301)
504–7923.
STATUS:
Dated: September 11, 2017.
Alberta E. Mills,
Acting Secretary.
[FR Doc. 2017–19548 Filed 9–11–17; 4:15 pm]
BILLING CODE 6355–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–439]
Application To Export Electric Energy;
J. Aron & Company LLC
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
J. Aron & Company LLC
(Applicant) has applied for authority to
transmit electric energy from the United
States to Mexico pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before October 13, 2017.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity Delivery and
Energy Reliability, Mail Code: OE–20,
U.S. Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On August 17, 2017, DOE received an
application from the Applicant for
authority to transmit electric energy
from the United States to Mexico as a
power marketer for a five-year term
sradovich on DSK3GMQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:34 Sep 12, 2017
Jkt 241001
using existing international
transmission facilities.
In its application, the Applicant states
that it does not own or control any
electric generation or transmission
facilities, and it does not have a
franchised service area. The electric
energy that the Applicant proposes to
export to Mexico would be surplus
energy purchased from third parties
such as electric utilities and Federal
power marketing agencies pursuant to
voluntary agreements. The existing
international transmission facilities to
be utilized by the Applicant have
previously been authorized by
Presidential Permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
PROCEDURAL MATTERS: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments and other filings
concerning the Applicant’s application
to export electric energy to Mexico
should be clearly marked with OE
Docket No. EA–439. An additional copy
is to be provided to both Kelly Brooks,
J. Aron & Company LLC, 200 West
Street, 6th Floor, New York, NY 10282
and Ricardo Alicea, J. Aron & Company
LLC, 200 West Street, 15th Floor, New
York, NY 10282.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not have an adverse impact on the
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
43003
Issued in Washington, DC, on September 5,
2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2017–19407 Filed 9–12–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–440]
Application To Export Electric Energy;
Plant-E Corp.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
Plant-E Corp (Applicant) has
applied for authority to transmit electric
energy from the United States to Canada
pursuant to the Federal Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before October 13, 2017.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity Delivery and
Energy Reliability, Mail Code: OE–20,
U.S. Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On August 18, 2017, DOE received an
application from the Applicant for
authority to transmit electric energy
from the United States to Canada as a
power marketer for a five-year term
using existing international
transmission facilities.
In its application, the Applicant states
that it does not own or control any
electric generation or transmission
facilities, and it does not have a
franchised service area. The electric
energy that the Applicant proposes to
export to Canada would be surplus
energy purchased from third parties
such as electric utilities and Federal
power marketing agencies pursuant to
voluntary agreements. The existing
SUMMARY:
E:\FR\FM\13SEN1.SGM
13SEN1
43004
Federal Register / Vol. 82, No. 176 / Wednesday, September 13, 2017 / Notices
international transmission facilities to
be utilized by the Applicant have
previously been authorized by
Presidential Permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments and other filings
concerning the Applicant’s application
to export electric energy to Canada
should be clearly marked with OE
Docket No. EA–440. An additional copy
is to be provided to Pierre Plante, PlantE Corp., 740 St Maurice, Suite 209,
Montreal, Quebec H3C 1L5.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not have an adverse impact on the
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on September 5,
2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2017–19424 Filed 9–12–17; 8:45 am]
BILLING CODE 6450–01–P
sradovich on DSK3GMQ082PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–173–000.
VerDate Sep<11>2014
17:34 Sep 12, 2017
Jkt 241001
Applicants: Southern California
Edison Company.
Description: Application for
Authorization under Section 203 of the
FPA to Merge Jurisdictional Facilities of
Southern California Edison Company.
Filed Date: 9/6/17.
Accession Number: 20170906–5181.
Comments Due: 5 p.m. ET 9/27/17.
Docket Numbers: EC17–174–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: Application of
Consolidated Edison Company of New
York, Inc. under New Docket for an
order pursuant to Section 203 of the
Federal Power Act.
Filed Date: 9/6/17.
Accession Number: 20170906–5183.
Comments Due: 5 p.m. ET 9/27/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–149–000.
Applicants: CA Flats Solar 150, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator (EWG) of CA Flats Solar 150,
LLC.
Filed Date: 9/6/17.
Accession Number: 20170906–5178.
Comments Due: 5 p.m. ET 9/27/17.
Docket Numbers: EG17–150–000.
Applicants: Florey Knob Energy LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Florey Knob Energy
LLC.
Filed Date: 9/7/17.
Accession Number: 20170907–5054.
Comments Due: 5 p.m. ET 9/28/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3069–007;
ER10–3070–007.
Applicants: Alcoa Power Generating
Inc., Alcoa Power Marketing LLC.
Description: Supplement to June 27,
2017 Southeast Regional Triennial
Submission and Notice of Change in
Status of the Alcoa Subsidiaries.
Filed Date: 9/6/17.
Accession Number: 20170906–5192.
Comments Due: 5 p.m. ET 9/27/17.
Docket Numbers: ER17–1795–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response in ER17–1795—
Classify Service Upgrade as Base Plan
Upgrade to be effective 8/8/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5166.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2185–001.
Applicants: Great Valley Solar 1, LLC.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Description: Tariff Amendment: Great
Valley Solar 1, LLC Amendment to SFA
Filing and Request to be effective 10/1/
2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5115.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2193–001.
Applicants: Great Valley Solar 1, LLC.
Description: Tariff Amendment: Great
Valley Solar 1, LLC Amendment to
LGIA CTA Filing and Request to be
effective 10/1/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5117.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2434–001.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment:
Amendment to Filing in ER17–2434 to
be effective 7/1/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5138.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2441–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3356
Milligan 1 Wind LLC Generator
Interconnection Agreement to be
effective 8/24/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5000.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2442–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3357
Monument Road Wind LLC Generator
Interconnection Agreement to be
effective 8/24/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5001.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2443–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–09–07_SA 3046 Upland PrairieMEC GIA (J455) to be effective 8/23/
2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5021.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2444–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–09–07_SA 3045 Ida Grove-MEC
GIA (J412) to be effective 8/23/2017.
Filed Date: 9/7/17.
Accession Number: 20170907–5065.
Comments Due: 5 p.m. ET 9/28/17.
Docket Numbers: ER17–2445–000.
Applicants: MET New York Trading
LLC.
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 82, Number 176 (Wednesday, September 13, 2017)]
[Notices]
[Pages 43003-43004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19424]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-440]
Application To Export Electric Energy; Plant-E Corp.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Plant-E Corp (Applicant) has applied for authority to transmit
electric energy from the United States to Canada pursuant to the
Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before October 13, 2017.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed to: Office of Electricity Delivery
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy,
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of
delays in handling conventional mail, it is recommended that documents
be transmitted by overnight mail, by electronic mail to
Electricity.Exports@hq.doe.gov, or by facsimile to 202-586-8008.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the Federal Power Act (16 U.S.C.
824a(e)).
On August 18, 2017, DOE received an application from the Applicant
for authority to transmit electric energy from the United States to
Canada as a power marketer for a five-year term using existing
international transmission facilities.
In its application, the Applicant states that it does not own or
control any electric generation or transmission facilities, and it does
not have a franchised service area. The electric energy that the
Applicant proposes to export to Canada would be surplus energy
purchased from third parties such as electric utilities and Federal
power marketing agencies pursuant to voluntary agreements. The existing
[[Page 43004]]
international transmission facilities to be utilized by the Applicant
have previously been authorized by Presidential Permits issued pursuant
to Executive Order 10485, as amended, and are appropriate for open
access transmission by third parties.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedures (18 CFR 385.211). Any person desiring to become
a party to these proceedings should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five
copies of such comments, protests, or motions to intervene should be
sent to the address provided above on or before the date listed above.
Comments and other filings concerning the Applicant's application
to export electric energy to Canada should be clearly marked with OE
Docket No. EA-440. An additional copy is to be provided to Pierre
Plante, Plant-E Corp., 740 St Maurice, Suite 209, Montreal, Quebec H3C
1L5.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to DOE's National
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and
after a determination is made by DOE that the proposed action will not
have an adverse impact on the sufficiency of supply or reliability of
the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://energy.gov/node/11845, or by
emailing Angela Troy at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on September 5, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2017-19424 Filed 9-12-17; 8:45 am]
BILLING CODE 6450-01-P