GenOn Holdco 10, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 42670-42671 [2017-19159]
Download as PDF
42670
Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices
DEPARTMENT OF ENERGY
Background
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
On December 19, 2016 the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed East-West Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received
comments from one landowner and the
Louisiana Department of Fisheries and
Wildlife. The primary issues raised by
the commentors are potential impacts
on soils, wetlands, wildlife refuges,
cultural resources, and the aging
process/potential corrosion of the
pipelines.
Federal Energy Regulatory
Commission
[Docket No. CP17–8–000]
Florida Gas Transmission Company,
LLC; Notice of Schedule for
Environmental Review of the EastWest Project
On October 31, 2016 Florida Gas
Transmission Company, LLC (FGT) filed
an application in Docket No. CP17–8–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the East-West Project
(Project), and would provide new
capacity of 275 million cubic feet per
day on FGT’s pipeline system in the
western division to meet the demand for
additional transportation and delivery
of natural gas to the proposed Port
Arthur—Motiva Meter and Regulator
(M&R) Station and the Wilson—Coastal
Bend M&R Station in Jefferson and
Wharton Counties, Texas respectively.
On November 9, 2016 the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA, October 20, 2017
90-day Federal Authorization Decision
Deadline, January 18, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Project Description
FGT proposes to construct and
operate about 13.3 miles of 12-inchdiameter lateral pipeline, about 12 miles
16-inch-diameter lateral and connection
pipeline, and four new meter stations
and auxiliary and appurtenant facilities
in Wharton, Matagorda, Jefferson, and
Orange Counties, Texas, and Calcasieu
and Acadia Parishes, Louisiana.
VerDate Sep<11>2014
16:34 Sep 08, 2017
Jkt 241001
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–8), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: September 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19113 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
[Docket No. ER17–2377–000]
GenOn Holdco 10, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of GenOn
Holdco 10, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
25, 2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\11SEN1.SGM
11SEN1
Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 5, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–19159 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–2368–000]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
GenOn Holdco 3, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding GenOn
Holdco 3, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
25, 2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
VerDate Sep<11>2014
16:34 Sep 08, 2017
Jkt 241001
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 5, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–19150 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14793–000]
The Domestic and Foreign Missionary
Society of the Protestant Episcopal
Diocese of Alabama; Notice of
Application Accepted for Filing With
the Commission, Intent To Waive
Scoping, Soliciting Motions To
Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Terms and Conditions, and
Recommendations, and Establishing
an Expedited Schedule for Processing
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 14793–000.
c. Date filed: July 12, 2016.
d. Applicant: The Domestic and
Foreign Missionary Society of the
Protestant Episcopal Diocese of
Alabama.
e. Name of Project: Camp McDowell
Project.
f. Location: On Clear Creek, near
Nauvoo in Winston County, Alabama.
No federal lands would be occupied by
project works or located within the
project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708 (2012), amended by
the Hydropower Regulatory Efficiency
Act of 2013, Public Law 113–23, 127
Stat. 493 (2013).
h. Applicant Contact: Mr. Fraizer
Christy, 3621 Kingshill Road,
Birmingham, Alabama 35223; (205)
617–0565.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
42671
i. FERC Contact: Monte TerHaar, (202)
502–6035, or email at monte.terhaar@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments, terms
and conditions, and recommendations:
Due to the small size and location of
this project and the close coordination
with state and federal agencies during
preparation of the application, the 60day timeframe in 18 CFR 4.34(b) is
shortened. Instead, motions to intervene
and protests, comments, terms and
conditions, and recommendations are
due 30 days from the issuance date of
this notice. All reply comments must be
filed with the Commission within 45
days from the issuance date of this
notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14793–000.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
1. The proposed Camp McDowell
Project would consist of: (1) An existing
157-foot-long, 13.5-foot-high concrete/
masonry dam consisting of: (a) A 113foot-long spillway with a crest elevation
of 513.5 feet North American Vertical
Datum of 1927 (NAVD 27); (b) a 9-footlong non-overflow section with a 5-footdiameter low level gated release pipe;
and (c) a 35-foot-long non-overflow
section; (2) an existing 10-acre
impoundment (Clear Creek) at normal
water surface elevation of 513.5 feet; (3)
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Pages 42670-42671]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19159]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER17-2377-000]
GenOn Holdco 10, LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding,
of GenOn Holdco 10, LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is September 25, 2017.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[[Page 42671]]
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Dated: September 5, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-19159 Filed 9-8-17; 8:45 am]
BILLING CODE 6717-01-P