Combined Notice of Filings #2, 42672-42673 [2017-19147]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
42672
Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices
a 26-foot-wide, 1.3-foot-deep gated
intake located on top of the spillway
protected by a 6-foot-high, 30-foot-wide
steel trash rack with 6-inch clear bar
spacing; (4) a 27-foot-long, 6-foot-wide,
concrete sluiceway; (5) a concrete
powerhouse, located at the base of the
dam, containing one 50-foot-long by 9foot-diameter Archimedes screw
turbine-generator unit (ASG unit), rated
at 140 kW; (6) a water-level sensor, and
automatic sluice gate controller; (7) a
650-foot-long, 460-volt, above-ground
transmission line; and (8) appurtenant
facilities. The estimated annual
generation of the proposed Camp
McDowell Project would be about 950
megawatt-hours. The applicant proposes
to operate the project in a run-of-river
mode. There are no federal or state
lands associated with the project.
m. Due to the applicant’s close
coordination with federal and state
agencies during the preparation of the
application, studies completed during
pre-filing consultation, and small size
and location of the project, we intend to
waive scoping and expedite the
exemption process. Based on a review of
the application and resource agency
consultation letters filed to date,
Commission staff intends to prepare a
single environmental assessment (EA).
Commission staff determined that the
issues that need to be addressed in its
EA have been adequately identified
during the pre-filing period, which
included a public scoping meeting and
site visit, and no new issues are likely
to be identified through additional
scoping. The EA will assess the
potential effects of project construction
and operation on geology and soils,
aquatic, terrestrial, threatened and
endangered species, recreation and land
use, aesthetic, and cultural and historic
resources.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
o. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
VerDate Sep<11>2014
16:34 Sep 08, 2017
Jkt 241001
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
q. A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
r. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, NOTICE OF INTENT TO
FILE COMPETING APPLICATION,
COMPETING APPLICATION,
COMMENTS, REPLY COMMENTS,
RECOMMENDATIONS, or TERMS AND
CONDITIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
s. Procedural Schedule: The
application will be processed according
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
to the following procedural schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Notice of the availability
of the EA.
November 9, 2017.
Dated: September 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19116 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–143–000.
Applicants: Great Valley Solar 1, LLC,
Great Valley Solar 2, LLC, Great Valley
Solar 3, LLC.
Description: Supplement to July 31,
2017 Application for Authorization of
Transaction Pursuant to Section 203 of
the Federal Power Act of Great Valley
Solar 1, LLC, et. al.
Filed Date: 8/31/17.
Accession Number: 20170831–5248.
Comments Due: 5 p.m. ET 9/11/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–148–000.
Applicants: HD Project One, LLC.
Description: Notice of SelfCertification of EG or FC of HD Project
One, LLC.
Filed Date: 9/1/17.
Accession Number: 20170901–5164.
Comments Due: 5 p.m. ET 9/22/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2401–001.
Applicants: SP Decatur Parkway
Solar, LLC.
Description: Tariff Amendment:
Amendment of Application for MBR
Authority and Initial Baseline Tariff
Filing to be effective 9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5091.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2403–001.
Applicants: SP Pawpaw Solar, LLC.
Description: Tariff Amendment:
Amendment of Application for MBR
Authority and Initial Baseline Tariff
Filing to be effective 9/1/2017.
E:\FR\FM\11SEN1.SGM
11SEN1
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices
Filed Date: 9/1/17.
Accession Number: 20170901–5096.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2404–001.
Applicants: SP Sandhills Solar, LLC.
Description: Tariff Amendment:
Amendment of Application for MBR
Authority and Initial Baseline Tariff
Filing to be effective 9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5095.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2416–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Annual Calculation of
the Cost of New Entry value (‘‘CONE’’)
for each Local Resource Zone (‘‘LRZ’’)
in the MISO Region of Midcontinent
Independent System Operator, Inc.
Filed Date: 9/1/17.
Accession Number: 20170901–5104.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2417–000.
Applicants: Great Valley Solar 3, LLC.
Description: Initial rate filing: Great
Valley Solar 3, LLC LGIA Co-Tenancy
Agreement Certificate of Concurrence to
be effective 10/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5114.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2418–000.
Applicants: Great Valley Solar 3, LLC.
Description: Initial rate filing: Great
Valley Solar 3, LLC Shared Facilities
Agreement Certificate of Concurrence to
be effective 10/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5115.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2419–000.
Applicants: Gateway Cogeneration 1,
LLC.
Description: Request of Gateway
Cogeneration 1, LLC for Limited Waiver
of Tariff Provisions and Expedited
Action.
Filed Date: 9/1/17.
Accession Number: 20170901–5117.
Comments Due: 5 p.m. ET 9/11/17.
Docket Numbers: ER17–2420–000.
Applicants: Alcoa Power Generating
Inc.
Description: § 205(d) Rate Filing:
Second Supplemental Transmission
Services Agreement to be effective 7/1/
2016.
Filed Date: 9/1/17.
Accession Number: 20170901–5121.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2421–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Revisions to Incorporate a Clustering
VerDate Sep<11>2014
16:34 Sep 08, 2017
Jkt 241001
42673
Approach in the Interconnection
Procedures to be effective 11/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5182.
Comments Due: 5 p.m. ET 9/22/17.
DEPARTMENT OF ENERGY
Docket Numbers: ER17–2422–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: JPB
Caltrain Supplement No. 3 under Master
Agreement to be effective 9/5/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5189.
Comments Due: 5 p.m. ET 9/22/17.
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Merchant Hydro
Developers, LLC
Docket Numbers: ER17–2423–000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing:
Amended and Restated Engineering and
Procurement Agreement to be effective
9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5194.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17–2424–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing:
SDGE TO Tariff Revisions to
Appendices IV and IX to be effective 12/
1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901–5212.
Comments Due: 5 p.m. ET 9/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–19147 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 14833–000]
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Snoosh Mountain Pumped
Storage Hydroelectric Project to be
located in Somerset County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 66 acres and a
storage capacity of 990 acre-feet at a
surface elevation of approximately 2,670
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam
and/or dike; (2) excavating a new lower
reservoir with a surface area of 60 acres
and a total storage capacity of 1,188
acre-feet at a surface elevation of 1,850
feet msl; (3) a new 2,670-foot-long, 48inch-diameter penstock connecting the
upper and lower reservoirs; (4) a new
150-foot-long, 50-foot-wide powerhouse
containing two turbine-generator units
with a total rated capacity of 67
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
115-kilovolt electric grid
interconnection point; and (6)
appurtenant facilities. Possible initial
fill water and make-up water would
come from the nearby Raystown Branch
of the Juniata River, including
groundwater. The proposed project
would have an annual generation of
242,920 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Pages 42672-42673]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-143-000.
Applicants: Great Valley Solar 1, LLC, Great Valley Solar 2, LLC,
Great Valley Solar 3, LLC.
Description: Supplement to July 31, 2017 Application for
Authorization of Transaction Pursuant to Section 203 of the Federal
Power Act of Great Valley Solar 1, LLC, et. al.
Filed Date: 8/31/17.
Accession Number: 20170831-5248.
Comments Due: 5 p.m. ET 9/11/17.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG17-148-000.
Applicants: HD Project One, LLC.
Description: Notice of Self-Certification of EG or FC of HD Project
One, LLC.
Filed Date: 9/1/17.
Accession Number: 20170901-5164.
Comments Due: 5 p.m. ET 9/22/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-2401-001.
Applicants: SP Decatur Parkway Solar, LLC.
Description: Tariff Amendment: Amendment of Application for MBR
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5091.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2403-001.
Applicants: SP Pawpaw Solar, LLC.
Description: Tariff Amendment: Amendment of Application for MBR
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.
[[Page 42673]]
Filed Date: 9/1/17.
Accession Number: 20170901-5096.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2404-001.
Applicants: SP Sandhills Solar, LLC.
Description: Tariff Amendment: Amendment of Application for MBR
Authority and Initial Baseline Tariff Filing to be effective 9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5095.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2416-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Annual Calculation of the Cost of New Entry value
(``CONE'') for each Local Resource Zone (``LRZ'') in the MISO Region of
Midcontinent Independent System Operator, Inc.
Filed Date: 9/1/17.
Accession Number: 20170901-5104.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2417-000.
Applicants: Great Valley Solar 3, LLC.
Description: Initial rate filing: Great Valley Solar 3, LLC LGIA
Co-Tenancy Agreement Certificate of Concurrence to be effective 10/1/
2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5114.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2418-000.
Applicants: Great Valley Solar 3, LLC.
Description: Initial rate filing: Great Valley Solar 3, LLC Shared
Facilities Agreement Certificate of Concurrence to be effective 10/1/
2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5115.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2419-000.
Applicants: Gateway Cogeneration 1, LLC.
Description: Request of Gateway Cogeneration 1, LLC for Limited
Waiver of Tariff Provisions and Expedited Action.
Filed Date: 9/1/17.
Accession Number: 20170901-5117.
Comments Due: 5 p.m. ET 9/11/17.
Docket Numbers: ER17-2420-000.
Applicants: Alcoa Power Generating Inc.
Description: Sec. 205(d) Rate Filing: Second Supplemental
Transmission Services Agreement to be effective 7/1/2016.
Filed Date: 9/1/17.
Accession Number: 20170901-5121.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2421-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Sec. 205(d) Rate Filing: Revisions to Incorporate a
Clustering Approach in the Interconnection Procedures to be effective
11/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5182.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2422-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: JPB Caltrain Supplement No.
3 under Master Agreement to be effective 9/5/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5189.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2423-000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: Amended and Restated Engineering
and Procurement Agreement to be effective 9/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5194.
Comments Due: 5 p.m. ET 9/22/17.
Docket Numbers: ER17-2424-000.
Applicants: San Diego Gas & Electric Company.
Description: Sec. 205(d) Rate Filing: SDGE TO Tariff Revisions to
Appendices IV and IX to be effective 12/1/2017.
Filed Date: 9/1/17.
Accession Number: 20170901-5212.
Comments Due: 5 p.m. ET 9/22/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-19147 Filed 9-8-17; 8:45 am]
BILLING CODE 6717-01-P