Florida Gas Transmission Company, LLC; Notice of Schedule for Environmental Review of the East-West Project, 42670 [2017-19113]
Download as PDF
42670
Federal Register / Vol. 82, No. 174 / Monday, September 11, 2017 / Notices
DEPARTMENT OF ENERGY
Background
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
On December 19, 2016 the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed East-West Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received
comments from one landowner and the
Louisiana Department of Fisheries and
Wildlife. The primary issues raised by
the commentors are potential impacts
on soils, wetlands, wildlife refuges,
cultural resources, and the aging
process/potential corrosion of the
pipelines.
Federal Energy Regulatory
Commission
[Docket No. CP17–8–000]
Florida Gas Transmission Company,
LLC; Notice of Schedule for
Environmental Review of the EastWest Project
On October 31, 2016 Florida Gas
Transmission Company, LLC (FGT) filed
an application in Docket No. CP17–8–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the East-West Project
(Project), and would provide new
capacity of 275 million cubic feet per
day on FGT’s pipeline system in the
western division to meet the demand for
additional transportation and delivery
of natural gas to the proposed Port
Arthur—Motiva Meter and Regulator
(M&R) Station and the Wilson—Coastal
Bend M&R Station in Jefferson and
Wharton Counties, Texas respectively.
On November 9, 2016 the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA, October 20, 2017
90-day Federal Authorization Decision
Deadline, January 18, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Project Description
FGT proposes to construct and
operate about 13.3 miles of 12-inchdiameter lateral pipeline, about 12 miles
16-inch-diameter lateral and connection
pipeline, and four new meter stations
and auxiliary and appurtenant facilities
in Wharton, Matagorda, Jefferson, and
Orange Counties, Texas, and Calcasieu
and Acadia Parishes, Louisiana.
VerDate Sep<11>2014
16:34 Sep 08, 2017
Jkt 241001
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–8), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: September 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–19113 Filed 9–8–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
[Docket No. ER17–2377–000]
GenOn Holdco 10, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of GenOn
Holdco 10, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
25, 2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 82, Number 174 (Monday, September 11, 2017)]
[Notices]
[Page 42670]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-19113]
[[Page 42670]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-8-000]
Florida Gas Transmission Company, LLC; Notice of Schedule for
Environmental Review of the East-West Project
On October 31, 2016 Florida Gas Transmission Company, LLC (FGT)
filed an application in Docket No. CP17-8-000 requesting a Certificate
of Public Convenience and Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the East-West Project
(Project), and would provide new capacity of 275 million cubic feet per
day on FGT's pipeline system in the western division to meet the demand
for additional transportation and delivery of natural gas to the
proposed Port Arthur--Motiva Meter and Regulator (M&R) Station and the
Wilson--Coastal Bend M&R Station in Jefferson and Wharton Counties,
Texas respectively.
On November 9, 2016 the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA, October 20, 2017
90-day Federal Authorization Decision Deadline, January 18, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
FGT proposes to construct and operate about 13.3 miles of 12-inch-
diameter lateral pipeline, about 12 miles 16-inch-diameter lateral and
connection pipeline, and four new meter stations and auxiliary and
appurtenant facilities in Wharton, Matagorda, Jefferson, and Orange
Counties, Texas, and Calcasieu and Acadia Parishes, Louisiana.
Background
On December 19, 2016 the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed East-West Project
and Request for Comments on Environmental Issues (NOI). The NOI was
sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. In response to the NOI, the Commission received
comments from one landowner and the Louisiana Department of Fisheries
and Wildlife. The primary issues raised by the commentors are potential
impacts on soils, wetlands, wildlife refuges, cultural resources, and
the aging process/potential corrosion of the pipelines.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-8), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: September 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-19113 Filed 9-8-17; 8:45 am]