Former Douglas Battery Site, Winston-Salem, Forsyth County, North Carolina; Notice of Settlement, 41256 [C1-2017-17737]

Download as PDF 41256 Federal Register / Vol. 82, No. 167 / Wednesday, August 30, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–485–000] mstockstill on DSK30JT082PROD with NOTICES Tallgrass Interstate Gas Transmission, LLC; Notice of Application Take notice that on August 18, 2017, Tallgrass Interstate Gas Transmission, LLC (Tallgrass), 370 Van Gordon Street, Lakewood, Colorado 80228, filed an application pursuant to section 7(b) of the Natural Gas Act (NGA) and Part 157 of the Commission’s Regulations requesting authority to abandon a 47mile 16-inch-diameter pipe segment (Segment 55) on its pipeline system from the discharge side of the existing Labonte Compressor Station located in Converse County, Wyoming to the inlet side of the existing Guernsey Compressor Station located in Platte County, Wyoming. Tallgrass states that Segment 55 will be abandoned in place and sold to Tallgrass Midstream, LLC (TMID), an affiliate. Upon authorization to abandon the facilities described above, TMID will purchase, convert, own and operate the pipeline segment as a crude oil pipeline to meet the increasing demand for pipeline transportation of crude oil. The filing may be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to David Haag, Vice President, Regulatory, Tallgrass Interstate Gas Transmission, LLC, 370 Van Gordon Street Lakewood, CO 80228–1519, phone: (303) 763–3258 or email: David.Haag@ tallgrassenergylp.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify VerDate Sep<11>2014 17:40 Aug 29, 2017 Jkt 241001 federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on September 14, 2017. Dated: August 24, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–18368 Filed 8–29–17; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [CERCLA–04–2017–3758; FRL–9966–03– Region 4] Former Douglas Battery Site, WinstonSalem, Forsyth County, North Carolina; Notice of Settlement Correction In notice document 2017–17737, appearing on page 39785, in the issue of Tuesday, August 22, 2017, make the following correction: On page 39785, in the second column, in the DATES section, on the third line, the entry ‘‘October 23, 2017’’ should read ‘‘September 21, 2017’’. [FR Doc. C1–2017–17737 Filed 8–29–17; 8:45 am] BILLING CODE 1301–00–D ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2017–0139; FRL–9966–83] Methylene Chloride in Furniture Refinishing; Workshop Environmental Protection Agency (EPA). ACTION: Notice of public meeting. AGENCY: On September 12, 2017, EPA is holding a workshop on the use of methylene chloride in furniture refinishing. In a proposed rule published on January 19, 2017, EPA proposed to prohibit manufacture (including import), processing, and distribution in commerce of methylene chloride in consumer paint and coating removal and most types of commercial paint and coating removal, except for SUMMARY: E:\FR\FM\30AUN1.SGM 30AUN1

Agencies

[Federal Register Volume 82, Number 167 (Wednesday, August 30, 2017)]
[Notices]
[Page 41256]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C1-2017-17737]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[CERCLA-04-2017-3758; FRL-9966-03-Region 4]


Former Douglas Battery Site, Winston-Salem, Forsyth County, North 
Carolina; Notice of Settlement

Correction

    In notice document 2017-17737, appearing on page 39785, in the 
issue of Tuesday, August 22, 2017, make the following correction:
    On page 39785, in the second column, in the DATES section, on the 
third line, the entry ``October 23, 2017'' should read ``September 21, 
2017''.

[FR Doc. C1-2017-17737 Filed 8-29-17; 8:45 am]
 BILLING CODE 1301-00-D
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.