Download as PDF 41012 Federal Register / Vol. 82, No. 166 / Tuesday, August 29, 2017 / Notices o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; and (3) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments should relate to project works which are the subject of this application. Agencies may obtain copies of the application directly from the applicant. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: August 22, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–18236 Filed 8–28–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RD16–10–000, RD17–5–000, and IC17–6–000 (FERC–725E)] sradovich on DSK3GMQ082PROD with NOTICES Errata Notice On August 15, 2017, the Commission issued a Notice of revised information collection and request for comments on FERC–725E (Mandatory Reliability Standards for the Western Electric Coordinating Council), in Docket Nos. RD16–10–000, RD17–5–000, and IC17– 6–000. This Errata Notice corrects multiple figures on page 13, in the table labeled FERC–725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Changes in Docket No. RD17–5–000. All of the changes described here occur in two separate rows under the column labeled Total Annual Burden Hours & Total Annual Cost ($) (3)*(4)=(5).: The entry in the row labeled Net Burden Change in Year 1 (Due to Docket RD17–5) should be changed from +252 hrs. (increase) to +252 hrs.; $2,993.40 (increase). The entry in the row labeled Net Burden Change in Year 2 and ongoing (Due to Docket RD17–5) should be changed from the ¥621 hrs. (decrease) to +873 hrs.; $53,884.47 (increase). VerDate Sep<11>2014 18:45 Aug 28, 2017 Jkt 241001 Dated: August 22, 2017. Kimberly D. Bose, Secretary. Dated: August 23, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–18237 Filed 8–28–17; 8:45 am] [FR Doc. 2017–18239 Filed 8–28–17; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2100–180—California] Combined Notice of Filings #1 California Department of Water Resources; Notice of Availability of Environmental Assessment Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–158–000. Applicants: CPV Towantic, LLC, Towantic Energy Holdings, LLC, Aircraft Services Corporation. Description: Correction to August 15, 2017 Application for Authorization under Section 203 of the Federal Power Act and Request for Waivers, Confidential Treatment, Expedited Action and Shortened Comment Period of CPV Towantic, LLC, et al. Filed Date: 8/21/17. Accession Number: 20170821–5157. Comments Due: 5 p.m. ET 9/5/17. Docket Numbers: EC17–163–000. Applicants: MDU Resources Group, Inc. Description: Application of MDU Resources Group, Inc. for Authorization Under FPA Section 203(a)(1)(B) and Request for Expedited Consideration and Confidential Treatment. Filed Date: 8/22/17. Accession Number: 20170822–5159. Comments Due: 5 p.m. ET 9/12/17. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–144–000. Applicants: St. Joseph Energy Center, LLC. Description: St. Joseph Energy Center, LLC Submits Self-Certification of EWG Status. Filed Date: 8/23/17. Accession Number: 20170823–5015. Comments Due: 5 p.m. ET 9/13/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2342–000. Applicants: Bladen Solar, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/10/2017. Filed Date: 8/22/17. Accession Number: 20170822–5135. Comments Due: 5 p.m. ET 9/12/17. Docket Numbers: ER17–2343–000. Applicants: Bullock Solar, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/4/2017. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 Code of Federal Regulations Part 380, the Office of Energy Projects has reviewed an application filed by the California Department of Water Resources on May 17, 2017, and supplemented June 16 and June 20, 2017, to permanently reroute three existing primary transmission lines at the Feather River Project No. 2100 between the Hyatt Pumping-Generating Plant and the Table Mountain Substation. The proposal would allow California Department of Water Resources to continuously deliver electricity along a different route away from repair activities at the project’s damaged main spillway and emergency spillway area. The Feather River Project is located on the Feather River in Butte County, California. Staff prepared an environmental assessment (EA) for the application which analyzes the potential environmental effects of approving the requested transmission line modification. In the EA, staff concludes that such an approval, with specified environmental protection measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission’s Public Reference Room or it may be viewed on the Commission’s Web site at www.ferc.gov using the eLibrary link. Enter the docket number P–2100–180 in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, 202–502–8659. For further information, contact Mr. John Aedo at (415) 369–3335 or by email at john.aedo@ferc.gov. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\29AUN1.SGM 29AUN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 166 / Tuesday, August 29, 2017 / Notices Filed Date: 8/22/17. Accession Number: 20170822–5137. Comments Due: 5 p.m. ET 9/12/17. Docket Numbers: ER17–2344–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: § 205(d) Rate Filing: 2017–8–22 GRE TSA Termination Agrmt-RS 309 to be effective 10/22/ 2017. Filed Date: 8/22/17. Accession Number: 20170822–5138. Comments Due: 5 p.m. ET 9/12/17. Docket Numbers: ER17–2345–000. Applicants: EC&R Energy Marketing, LLC. Description: Baseline eTariff Filing: Application for Market Based Rate to be effective 10/22/2017. Filed Date: 8/23/17. Accession Number: 20170823–5018. Comments Due: 5 p.m. ET 9/13/17. Docket Numbers: ER17–2346–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–08–23_Termination of Project J235 E&P Agreements (SA 2549 & SA 2517) to be effective 8/24/2017. Filed Date: 8/23/17. Accession Number: 20170823–5021. Comments Due: 5 p.m. ET 9/13/17. Docket Numbers: ER17–2347–000. Applicants: Louisville Gas and Electric Company. Description: § 205(d) Rate Filing: Att I and Att R Updates to be effective 10/23/ 2017. Filed Date: 8/23/17. Accession Number: 20170823–5029. Comments Due: 5 p.m. ET 9/13/17. Docket Numbers: ER17–2348–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 4458, Queue No. AA1–110 to be effective 10/16/2017. Filed Date: 8/23/17. Accession Number: 20170823–5037. Comments Due: 5 p.m. ET 9/13/17. Docket Numbers: ER17–2349–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: WECC Field Test Waiver for Rate Schedule No. 321 to be effective 8/8/ 2017. Filed Date: 8/23/17. Accession Number: 20170823–5052. Comments Due: 5 p.m. ET 9/13/17. Docket Numbers: ER17–2350–000. Applicants: Public Service Company of Oklahoma. Description: § 205(d) Rate Filing: PSO–OGE Cemetery Road Delivery Point Agreement to be effective 8/15/ 2017. VerDate Sep<11>2014 18:45 Aug 28, 2017 Jkt 241001 Filed Date: 8/23/17. Accession Number: 20170823–5073. Comments Due: 5 p.m. ET 9/13/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 23, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–18245 Filed 8–28–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14227–000] Nevada Hydro Company, Inc.; Notice of Intent To File License Application, Filing of Draft License Application, and Request To Waive Pre-Filing Requirements a. Type of Filing: Notice of Intent to File License Application and Request to Waive Pre-Filing Requirements. b. Project No.: 14227–000. c. Dated Filed: June 1, 2017. d. Submitted By: Nevada Hydro Company, Inc. (Nevada Hydro). e. Name of Project: Lake Elsinore Advanced Pumped Storage (LEAPS) Project. f. Location: On Lake Elsinore and San Juan Creek near the town of Lake Elsinore in Riverside and San Diego counties, California. The project would occupy about 845 acres of federal land. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Applicant Contact: Rexford Wait, Nevada Hydro Company, Inc., 2416 Cades Way Vista, California (760) 599– 1815. i. FERC Contact: Jim Fargo at (202) 502–6095 or email at james.fargo@ ferc.gov. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 41013 j. On June 1, 2017, Nevada Hydro filed a request that the Commission waive certain of the pre-filing consultation requirements of Part 5 of the Commission’s regulations for the proposed LEAPS Project to include: prefiling scoping; 1 comments and information or study requests; the preparation of and comments on a proposed study plan; resolution of disputes over studies; 2 and notice of the applicant’s intent to file a draft license application.3 Nevada Hydro’s justification for the waivers is that a Final Environmental Impact Statement, prepared by Commission staff, was issued in 2007 for essentially the same project proposal under P–11858 and the consultation on the current project proposal that has already occurred meets the intent of the Commission’s pre-filing consultation requirements. With this notice we are soliciting comments on Nevada Hydro’s notice of intent and request to waive pre-filing requirements. All comments should be sent to the address in paragraph l below. k. The NOI, waiver request, and associated filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. l. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper 1 18 CFR 5.8 (2017). CFR 5.9, 5.11–5.15 (2017). 3 18 CFR 5.16 (2017). 2 18 E:\FR\FM\29AUN1.SGM 29AUN1

Agencies

[Federal Register Volume 82, Number 166 (Tuesday, August 29, 2017)]
[Notices]
[Pages 41012-41013]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-18245]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC17-158-000.
    Applicants: CPV Towantic, LLC, Towantic Energy Holdings, LLC, 
Aircraft Services Corporation.
    Description: Correction to August 15, 2017 Application for 
Authorization under Section 203 of the Federal Power Act and Request 
for Waivers, Confidential Treatment, Expedited Action and Shortened 
Comment Period of CPV Towantic, LLC, et al.
    Filed Date: 8/21/17.
    Accession Number: 20170821-5157.
    Comments Due: 5 p.m. ET 9/5/17.

    Docket Numbers: EC17-163-000.
    Applicants: MDU Resources Group, Inc.
    Description: Application of MDU Resources Group, Inc. for 
Authorization Under FPA Section 203(a)(1)(B) and Request for Expedited 
Consideration and Confidential Treatment.
    Filed Date: 8/22/17.
    Accession Number: 20170822-5159.
    Comments Due: 5 p.m. ET 9/12/17.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG17-144-000.
    Applicants: St. Joseph Energy Center, LLC.
    Description: St. Joseph Energy Center, LLC Submits Self-
Certification of EWG Status.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5015.
    Comments Due: 5 p.m. ET 9/13/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-2342-000.
    Applicants: Bladen Solar, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
10/10/2017.
    Filed Date: 8/22/17.
    Accession Number: 20170822-5135.
    Comments Due: 5 p.m. ET 9/12/17.

    Docket Numbers: ER17-2343-000.
    Applicants: Bullock Solar, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
10/4/2017.

[[Page 41013]]

    Filed Date: 8/22/17.
    Accession Number: 20170822-5137.
    Comments Due: 5 p.m. ET 9/12/17.

    Docket Numbers: ER17-2344-000.
    Applicants: Northern States Power Company, a Minnesota corporation.
    Description: Sec.  205(d) Rate Filing: 2017-8-22 GRE TSA 
Termination Agrmt-RS 309 to be effective 10/22/2017.
    Filed Date: 8/22/17.
    Accession Number: 20170822-5138.
    Comments Due: 5 p.m. ET 9/12/17.

    Docket Numbers: ER17-2345-000.
    Applicants: EC&R Energy Marketing, LLC.
    Description: Baseline eTariff Filing: Application for Market Based 
Rate to be effective 10/22/2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5018.
    Comments Due: 5 p.m. ET 9/13/17.

    Docket Numbers: ER17-2346-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2017-08-23_Termination of 
Project J235 E&P Agreements (SA 2549 & SA 2517) to be effective 8/24/
2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5021.
    Comments Due: 5 p.m. ET 9/13/17.

    Docket Numbers: ER17-2347-000.
    Applicants: Louisville Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Att I and Att R Updates to 
be effective 10/23/2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5029.
    Comments Due: 5 p.m. ET 9/13/17.

    Docket Numbers: ER17-2348-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA SA 
No. 4458, Queue No. AA1-110 to be effective 10/16/2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5037.
    Comments Due: 5 p.m. ET 9/13/17.

    Docket Numbers: ER17-2349-000.
    Applicants: Tucson Electric Power Company.
    Description: Sec.  205(d) Rate Filing: WECC Field Test Waiver for 
Rate Schedule No. 321 to be effective 8/8/2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5052.
    Comments Due: 5 p.m. ET 9/13/17.

    Docket Numbers: ER17-2350-000.
    Applicants: Public Service Company of Oklahoma.
    Description: Sec.  205(d) Rate Filing: PSO-OGE Cemetery Road 
Delivery Point Agreement to be effective 8/15/2017.
    Filed Date: 8/23/17.
    Accession Number: 20170823-5073.
    Comments Due: 5 p.m. ET 9/13/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 23, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-18245 Filed 8-28-17; 8:45 am]
 BILLING CODE 6717-01-P