Midwest Hydraulic Company, LLC; Notice of Emergency Drawdown and Temporary Variance and Soliciting Comments, 41011-41012 [2017-18236]
Download as PDF
Federal Register / Vol. 82, No. 166 / Tuesday, August 29, 2017 / Notices
Decontamination and Decommissioning
Fund established at the Department of
Treasury pursuant to section 1801 of the
Atomic Energy Act of 1954 (42 U.S.C.
2297g). Payment or obligation of funds
shall be subject to the requirements of
the Anti-Deficiency Act (31 U.S.C.
1341).
Authority: Section 1001–1004 of Public
Law 102–486, 106 Stat. 2776 (42 U.S.C.
2296a et seq.).
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on September 11, 2017.
Issued in Washington, DC on May 11,
2017.
Theresa Kliczewski,
Office of Waste Disposal, Office of
Environmental Management.
Dated: August 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–18270 Filed 8–28–17; 8:45 am]
[FR Doc. 2017–18240 Filed 8–28–17; 8:45 am]
BILLING CODE 6450–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
[Docket No. OR17–21–000]
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 10805–057]
sradovich on DSK3GMQ082PROD with NOTICES
Grieve Pipeline, LLC; Notice of Petition
for Declaratory Order
Take notice that on August 11, 2017,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2016),
Grieve Pipeline, LLC, a subsidiary of Elk
Petroleum, Inc., filed a petition for a
declaratory order seeking approval of
open season procedures, rate structure,
key contract and tariff terms, as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
VerDate Sep<11>2014
18:45 Aug 28, 2017
Jkt 241001
Midwest Hydraulic Company, LLC;
Notice of Emergency Drawdown and
Temporary Variance and Soliciting
Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Temporary
Emergency Drawdown and Variance
from License Article 401.
b. Project No.: P–10805–057.
c. Date Filed: August 18, 2017.
d. Applicants: Midwest Hydraulic
Company, LLC.
e. Name of Projects: Hatfield
Hydroelectric Project.
f. Location: The project is located on
the Black River, in the Township of
Hatfield, in Jackson and Clarke counties,
Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Dwight
Bowler, Midwest Hydraulic Company,
LLC, c/o Black River Partners, 813
Jefferson Hill Road, Nassau, New York
(518) 766–2753.
i. FERC Contact: Ms. Rebecca Martin,
(202) 502–6012, Rebecca.Martin@
ferc.gov.
j. Deadline for filing comments, is 30
days from the issuance date of this
notice by the Commission. All
documents may be filed electronically
via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov/docs-filing/efiling.asp. If
unable to be filed electronically,
documents may be paper-filed. To
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
41011
paper-file, an original and seven copies
should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–10805–057) on any
comments, motions, or
recommendations filed.
k. Description of Request: The
licensee must lower the reservoir as a
risk reduction measure to prevent
additional scouring below the project
spillways during high flow events. The
drawdown is also necessary to safely
construct repairs below the spillway.
The drawdown would begin on
September 5, 2017 at a rate of 0.50 feet
per day for a total drawdown of 5.5 feet
to elevation 877 National Geodetic
Vertical Datum (NGVD). Article 401 of
the project license requires the licensee
to maintain a target reservoir surface
elevation of Lake Arbutus of 882.5 ±
0.25 feet NGVD at least 50 percent of the
time and ± 0.5 feet at all times. Article
401 allows the reservoir elevation to be
modified temporarily for operating
emergencies. The refill of the reservoir
is estimated to occur in spring of 2019.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments: Anyone may submit
comments in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
Any comments must be received on or
before the specified comment date for
the particular application.
E:\FR\FM\29AUN1.SGM
29AUN1
41012
Federal Register / Vol. 82, No. 166 / Tuesday, August 29, 2017 / Notices
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; and (3)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
All comments should relate to project
works which are the subject of this
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
Dated: August 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–18236 Filed 8–28–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RD16–10–000, RD17–5–000,
and IC17–6–000 (FERC–725E)]
sradovich on DSK3GMQ082PROD with NOTICES
Errata Notice
On August 15, 2017, the Commission
issued a Notice of revised information
collection and request for comments on
FERC–725E (Mandatory Reliability
Standards for the Western Electric
Coordinating Council), in Docket Nos.
RD16–10–000, RD17–5–000, and IC17–
6–000. This Errata Notice corrects
multiple figures on page 13, in the table
labeled FERC–725E, Mandatory
Reliability Standards for the Western
Electric Coordinating Council, Changes
in Docket No. RD17–5–000.
All of the changes described here
occur in two separate rows under the
column labeled Total Annual Burden
Hours & Total Annual Cost ($)
(3)*(4)=(5).: The entry in the row
labeled Net Burden Change in Year 1
(Due to Docket RD17–5) should be
changed from +252 hrs. (increase) to
+252 hrs.; $2,993.40 (increase). The
entry in the row labeled Net Burden
Change in Year 2 and ongoing (Due to
Docket RD17–5) should be changed
from the ¥621 hrs. (decrease) to +873
hrs.; $53,884.47 (increase).
VerDate Sep<11>2014
18:45 Aug 28, 2017
Jkt 241001
Dated: August 22, 2017.
Kimberly D. Bose,
Secretary.
Dated: August 23, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–18237 Filed 8–28–17; 8:45 am]
[FR Doc. 2017–18239 Filed 8–28–17; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2100–180—California]
Combined Notice of Filings #1
California Department of Water
Resources; Notice of Availability of
Environmental Assessment
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–158–000.
Applicants: CPV Towantic, LLC,
Towantic Energy Holdings, LLC,
Aircraft Services Corporation.
Description: Correction to August 15,
2017 Application for Authorization
under Section 203 of the Federal Power
Act and Request for Waivers,
Confidential Treatment, Expedited
Action and Shortened Comment Period
of CPV Towantic, LLC, et al.
Filed Date: 8/21/17.
Accession Number: 20170821–5157.
Comments Due: 5 p.m. ET 9/5/17.
Docket Numbers: EC17–163–000.
Applicants: MDU Resources Group,
Inc.
Description: Application of MDU
Resources Group, Inc. for Authorization
Under FPA Section 203(a)(1)(B) and
Request for Expedited Consideration
and Confidential Treatment.
Filed Date: 8/22/17.
Accession Number: 20170822–5159.
Comments Due: 5 p.m. ET 9/12/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–144–000.
Applicants: St. Joseph Energy Center,
LLC.
Description: St. Joseph Energy Center,
LLC Submits Self-Certification of EWG
Status.
Filed Date: 8/23/17.
Accession Number: 20170823–5015.
Comments Due: 5 p.m. ET 9/13/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2342–000.
Applicants: Bladen Solar, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 10/10/2017.
Filed Date: 8/22/17.
Accession Number: 20170822–5135.
Comments Due: 5 p.m. ET 9/12/17.
Docket Numbers: ER17–2343–000.
Applicants: Bullock Solar, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 10/4/2017.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 Code of Federal
Regulations Part 380, the Office of
Energy Projects has reviewed an
application filed by the California
Department of Water Resources on May
17, 2017, and supplemented June 16
and June 20, 2017, to permanently
reroute three existing primary
transmission lines at the Feather River
Project No. 2100 between the Hyatt
Pumping-Generating Plant and the
Table Mountain Substation. The
proposal would allow California
Department of Water Resources to
continuously deliver electricity along a
different route away from repair
activities at the project’s damaged main
spillway and emergency spillway area.
The Feather River Project is located on
the Feather River in Butte County,
California.
Staff prepared an environmental
assessment (EA) for the application
which analyzes the potential
environmental effects of approving the
requested transmission line
modification. In the EA, staff concludes
that such an approval, with specified
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission’s Public
Reference Room or it may be viewed on
the Commission’s Web site at
www.ferc.gov using the eLibrary link.
Enter the docket number P–2100–180 in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
For further information, contact Mr.
John Aedo at (415) 369–3335 or by
email at john.aedo@ferc.gov.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
E:\FR\FM\29AUN1.SGM
29AUN1
Agencies
[Federal Register Volume 82, Number 166 (Tuesday, August 29, 2017)]
[Notices]
[Pages 41011-41012]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-18236]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10805-057]
Midwest Hydraulic Company, LLC; Notice of Emergency Drawdown and
Temporary Variance and Soliciting Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Temporary Emergency Drawdown and Variance
from License Article 401.
b. Project No.: P-10805-057.
c. Date Filed: August 18, 2017.
d. Applicants: Midwest Hydraulic Company, LLC.
e. Name of Projects: Hatfield Hydroelectric Project.
f. Location: The project is located on the Black River, in the
Township of Hatfield, in Jackson and Clarke counties, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Dwight Bowler, Midwest Hydraulic Company,
LLC, c/o Black River Partners, 813 Jefferson Hill Road, Nassau, New
York (518) 766-2753.
i. FERC Contact: Ms. Rebecca Martin, (202) 502-6012,
Rebecca.Martin@ferc.gov.
j. Deadline for filing comments, is 30 days from the issuance date
of this notice by the Commission. All documents may be filed
electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and seven
copies should be mailed to: Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. Please include the project number (P-
10805-057) on any comments, motions, or recommendations filed.
k. Description of Request: The licensee must lower the reservoir as
a risk reduction measure to prevent additional scouring below the
project spillways during high flow events. The drawdown is also
necessary to safely construct repairs below the spillway. The drawdown
would begin on September 5, 2017 at a rate of 0.50 feet per day for a
total drawdown of 5.5 feet to elevation 877 National Geodetic Vertical
Datum (NGVD). Article 401 of the project license requires the licensee
to maintain a target reservoir surface elevation of Lake Arbutus of
882.5 0.25 feet NGVD at least 50 percent of the time and
0.5 feet at all times. Article 401 allows the reservoir
elevation to be modified temporarily for operating emergencies. The
refill of the reservoir is estimated to occur in spring of 2019.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments: Anyone may submit comments in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. Any comments must be received on or before the specified comment
date for the particular application.
[[Page 41012]]
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, as applicable; (2) set
forth in the heading the name of the applicant and the project number
of the application to which the filing responds; and (3) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments must set forth their evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b). All comments should relate to
project works which are the subject of this application. Agencies may
obtain copies of the application directly from the applicant. A copy of
all other filings in reference to this application must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Dated: August 22, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-18236 Filed 8-28-17; 8:45 am]