PE Hydro Generation, LLC; Notice of Availability of Draft Environmental Assessment, 40151 [2017-17965]
Download as PDF
Federal Register / Vol. 82, No. 163 / Thursday, August 24, 2017 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2343–086]
[Docket Nos. EF17–2–000; EF17–3–000;
EF17–4–000]
[Docket No. CP17–46–000]
PE Hydro Generation, LLC; Notice of
Availability of Draft Environmental
Assessment
rmajette on DSKBCKNHB2PROD with NOTICES
40151
Notice of Filing; Bonneville Power
Administration
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47879), the Office of Energy
Projects has reviewed the application
for a new license for the Millville
Hydroelectric Project, located on the
Shenandoah River, near the town of
Harpers Ferry in Jefferson County, West
Virginia, and has prepared a draft
Environmental Assessment (draft EA)
for the project. The project does not
occupy federal land.
In the draft EA, Commission staff
analyze the potential environmental
effects of relicensing the project and
conclude that continued project
operation under a new license, with
appropriate measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free number at 1–866–
208–3676, or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, please
contact Michael Spencer by telephone at
(202) 502–6093 or by email at
michael.spencer@ferc.gov.
Dated: August 16, 2017.
Kimberly D. Bose,
Secretary.
Take notice that on August 10, 2017,
Bonneville Power Administration
submitted a Second Errata to its July 31,
2017 tariff filing per: BP–18 Power and
Transmission Rates.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 30, 2017.
[FR Doc. 2017–17965 Filed 8–23–17; 8:45 am]
Dated: August 16, 2017.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2017–17964 Filed 8–23–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
15:29 Aug 23, 2017
Jkt 241001
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Southern Natural Gas Company, LLC;
Notice of Availability of the
Environmental Assessment for the
Proposed Fairburn Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Fairburn Expansion Project, proposed
by Southern Natural Gas Company, LLC
(Southern) in the above-referenced
docket. Southern requests authorization
to acquire, upgrade, construct, and
operate certain natural gas pipeline and
compression facilities in Clayton, Cobb,
Fayetteville, Fulton, and Monroe
Counties, Georgia. The project would
provide approximately 343 million
cubic feet per day of new firm
transportation capacity to delivery
points in Southern’s Zone 2 and Zone
3 systems.
The EA assesses the potential
environmental effects of the
construction and operation of the
Fairburn Expansion Project in
accordance with the requirements of the
National Environmental Policy Act
(NEPA). The FERC staff concludes that
approval of the proposed project, with
appropriate mitigating measures, would
not constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Army Corps of Engineers
and the U.S. Environmental Protection
Agency participated as a cooperating
agency in the preparation of the EA.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis.
The proposed Fairburn Expansion
Project includes the following facilities
in Georgia:
• One new 4.9-mile-long 30-inchdiameter Fairburn Lateral pipeline,
extending from the Transcontinental
Gas Pipe Line Company interconnect in
Fayette County to a new proposed
18,000-horsepower electric Fairburn
Compressor Station with pig 1 receiver
in Fulton County;
1 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 82, Number 163 (Thursday, August 24, 2017)]
[Notices]
[Page 40151]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-17965]
[[Page 40151]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2343-086]
PE Hydro Generation, LLC; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office
of Energy Projects has reviewed the application for a new license for
the Millville Hydroelectric Project, located on the Shenandoah River,
near the town of Harpers Ferry in Jefferson County, West Virginia, and
has prepared a draft Environmental Assessment (draft EA) for the
project. The project does not occupy federal land.
In the draft EA, Commission staff analyze the potential
environmental effects of relicensing the project and conclude that
continued project operation under a new license, with appropriate
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the draft EA is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
at www.ferc.gov using the eLibrary link. Enter the docket number,
excluding the last three digits, in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free number at 1-866-208-3676, or
for TTY, 202-502-8659.
You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
For further information, please contact Michael Spencer by
telephone at (202) 502-6093 or by email at michael.spencer@ferc.gov.
Dated: August 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-17965 Filed 8-23-17; 8:45 am]
BILLING CODE 6717-01-P