Woodland Pulp LLC; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions To Intervene, 40149-40150 [2017-17955]

Download as PDF Federal Register / Vol. 82, No. 163 / Thursday, August 24, 2017 / Notices Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426 This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on September 15, 2017. Dated: August 18, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–17954 Filed 8–23–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2660–029] rmajette on DSKBCKNHB2PROD with NOTICES Woodland Pulp LLC; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Petition for Declaratory Order. b. Project No: 2660–029. c. Date Filed: July 27, 2017. d. Applicant: Woodland Pulp, LLC. e. Name of Project: Forest City Project. f. Location: On the East Branch of the St. Croix River in Washington and Aroostook Counties, Maine. VerDate Sep<11>2014 15:29 Aug 23, 2017 Jkt 241001 g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant Contact: Mr. Scott Beal, Woodland Pulp, LLC, 144 Main Street, Baileyville, ME 04694, Tel: 207–427– 4004. i. FERC Contact: Any questions on this notice should be addressed to Mr. M. Joseph Fayyad, (202) 502–8759, or email: Mo.Fayyad@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2660–029. k. Description of Project: The Forest City Project is located at river mile 58 of the East Branch of the St. Croix River on the international boundary between the United States and Canada. The existing project as licensed includes only the lands, waters, and structures that are located in the United States, which consist of: (a) A 147-foot-long section of the 540-foot-long, 12-foothigh earthen Forest City Dam that includes: (i) A 110-foot-long west earthen embankment, and (ii) a 37-footlong section of the timber-crib spillway section with two 8.3-foot-wide, 10-foothigh spillway gates on the west side of the spillway, which control the impoundment between a minimum elevation of 427.94 feet mean sea level (msl) and a maximum elevation of 434.94 feet msl; (b) a 9,141-acre portion of the 17,040-acre multi-lake impoundment (North Lake and East Grand Lake); and (c) appurtenant facilities. The project does not occupy federal lands and there are no generating facilities located at the project. The Forest City Project supplies water to the unlicensed downstream Grand Falls and Woodland hydroelectric projects. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 40149 In November 2015, the Commission issued Woodland Pulp a new license to operate and maintain the Forest City Project. In December 2016, Woodland Pulp filed an application to surrender its new license and decommission the project by removing the gates located on the United States side of the spillway. The Commission is considering the licensee’s surrender and decommissioning proceeding in Project No. 2660–028. On July 24, 2017, Governor LePage of Maine signed into law a resolve authorizing Maine Department of Inland Fisheries and Wildlife (Maine DIFW) to assume ownership of the Forest City Dam pursuant to two conditions: (1) The Commission finds that the Forest City Project will not require a license from the Commission if Maine DIFW owns the U.S. portion of the dam; and (2) Maine DIFW executes an agreement with Woodland Pulp that provides that Woodland Pulp and its successors will operate and maintain the Forest City Dam consistent with the manner in which the dam was operated in most recent 12 months, at the direction of the State, and at no cost to the State, for a period of 15 years. On July 27, 2017, Maine DIFW and Woodland Pulp executed an operation and management agreement. l. Description of Request: The licensee requests the Commission to find that the Forest City Project will not be necessary or appropriate for any downstream unit of development if the licensee transfers the dam to the Maine Department of Inland Fisheries and Wildlife, and will therefore no longer be required to be licensed pursuant to section 23(b)(1) of the Federal Power Act. m. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. E:\FR\FM\24AUN1.SGM 24AUN1 40150 Federal Register / Vol. 82, No. 163 / Thursday, August 24, 2017 / Notices rmajette on DSKBCKNHB2PROD with NOTICES o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: August 18, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–17955 Filed 8–23–17; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 15:29 Aug 23, 2017 Jkt 241001 DEPARTMENT OF ENERGY Comments Due: 5 p.m. ET 9/8/17. Federal Energy Regulatory Commission Docket Numbers: ER17–2335–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Service Agreement No. 4762, Queue No. AC1–018 to be effective 7/19/2017. Filed Date: 8/18/17. Accession Number: 20170818–5129. Comments Due: 5 p.m. ET 9/8/17. Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–140–000. Applicants: Middle Daisy, LLC. Description: Self-Certification of EG of Middle Daisy, LLC. Filed Date: 8/17/17. Accession Number: 20170817–5129. Comments Due: 5 p.m. ET 9/7/17. Docket Numbers: EG17–141–000. Applicants: Shoreham Solar Commons LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Shoreham Solar Commons LLC. Filed Date: 8/18/17. Accession Number: 20170818–5135. Comments Due: 5 p.m. ET 9/8/17. Docket Numbers: EG17–142–000. Applicants: Shoreham Solar Commons Holdings LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Shoreham Solar Commons Holdings LLC. Filed Date: 8/18/17. Accession Number: 20170818–5137. Comments Due: 5 p.m. ET 9/8/17. Docket Numbers: EG17–143–000. Applicants: Golden Hills North Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Golden Hills North Wind, LLC. Filed Date: 8/18/17. Accession Number: 20170818–5140. Comments Due: 5 p.m. ET 9/8/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–2217–000. Applicants: Logan Generating Company, L.P. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 8/18/17. Accession Number: 20170818–5126. Comments Due: 5 p.m. ET 9/8/17. Docket Numbers: ER17–2334–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: Joint filing of an executed LGIA among NYISO, NMPC and Arkwright Summit Wind Far to be effective 8/10/2017. Filed Date: 8/18/17. Accession Number: 20170818–5092. PO 00000 Frm 00021 Fmt 4703 Sfmt 9990 Docket Numbers: ER17–2336–000. Applicants: Shoreham Solar Commons LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization to be effective 10/18/2017. Filed Date: 8/18/17. Accession Number: 20170818–5136. Comments Due: 5 p.m. ET 9/8/17. Docket Numbers: ER17–2337–000. Applicants: Shoreham Solar Commons Holdings LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization to be effective 10/18/2017. Filed Date: 8/18/17. Accession Number: 20170818–5138. Comments Due: 5 p.m. ET 9/8/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 18, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–17950 Filed 8–23–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 82, Number 163 (Thursday, August 24, 2017)]
[Notices]
[Pages 40149-40150]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-17955]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2660-029]


Woodland Pulp LLC; Notice of Petition for Declaratory Order and 
Soliciting Comments, Protests, and/or Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Petition for Declaratory Order.
    b. Project No: 2660-029.
    c. Date Filed: July 27, 2017.
    d. Applicant: Woodland Pulp, LLC.
    e. Name of Project: Forest City Project.
    f. Location: On the East Branch of the St. Croix River in 
Washington and Aroostook Counties, Maine.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b) (2012).
    h. Applicant Contact: Mr. Scott Beal, Woodland Pulp, LLC, 144 Main 
Street, Baileyville, ME 04694, Tel: 207-427-4004.
    i. FERC Contact: Any questions on this notice should be addressed 
to Mr. M. Joseph Fayyad, (202) 502-8759, or email: Mo.Fayyad@ferc.gov.
    j. Deadline for filing comments, protests, and motions to intervene 
is: 30 days from the issuance date of this notice by the Commission. 
The Commission strongly encourages electronic filing. Please file 
comments, protests, and motions to intervene using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-2660-029.
    k. Description of Project: The Forest City Project is located at 
river mile 58 of the East Branch of the St. Croix River on the 
international boundary between the United States and Canada. The 
existing project as licensed includes only the lands, waters, and 
structures that are located in the United States, which consist of: (a) 
A 147-foot-long section of the 540-foot-long, 12-foot-high earthen 
Forest City Dam that includes: (i) A 110-foot-long west earthen 
embankment, and (ii) a 37-foot-long section of the timber-crib spillway 
section with two 8.3-foot-wide, 10-foot-high spillway gates on the west 
side of the spillway, which control the impoundment between a minimum 
elevation of 427.94 feet mean sea level (msl) and a maximum elevation 
of 434.94 feet msl; (b) a 9,141-acre portion of the 17,040-acre multi-
lake impoundment (North Lake and East Grand Lake); and (c) appurtenant 
facilities. The project does not occupy federal lands and there are no 
generating facilities located at the project. The Forest City Project 
supplies water to the unlicensed downstream Grand Falls and Woodland 
hydroelectric projects.
    In November 2015, the Commission issued Woodland Pulp a new license 
to operate and maintain the Forest City Project. In December 2016, 
Woodland Pulp filed an application to surrender its new license and 
decommission the project by removing the gates located on the United 
States side of the spillway. The Commission is considering the 
licensee's surrender and decommissioning proceeding in Project No. 
2660-028.
    On July 24, 2017, Governor LePage of Maine signed into law a 
resolve authorizing Maine Department of Inland Fisheries and Wildlife 
(Maine DIFW) to assume ownership of the Forest City Dam pursuant to two 
conditions: (1) The Commission finds that the Forest City Project will 
not require a license from the Commission if Maine DIFW owns the U.S. 
portion of the dam; and (2) Maine DIFW executes an agreement with 
Woodland Pulp that provides that Woodland Pulp and its successors will 
operate and maintain the Forest City Dam consistent with the manner in 
which the dam was operated in most recent 12 months, at the direction 
of the State, and at no cost to the State, for a period of 15 years. On 
July 27, 2017, Maine DIFW and Woodland Pulp executed an operation and 
management agreement.
    l. Description of Request: The licensee requests the Commission to 
find that the Forest City Project will not be necessary or appropriate 
for any downstream unit of development if the licensee transfers the 
dam to the Maine Department of Inland Fisheries and Wildlife, and will 
therefore no longer be required to be licensed pursuant to section 
23(b)(1) of the Federal Power Act.
    m. Locations of the Application: This filing may be viewed on the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. You may also register online at 
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above and in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.

[[Page 40150]]

    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to project works which 
are the subject of the license surrender. Agencies may obtain copies of 
the application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. If an intervener 
files comments or documents with the Commission relating to the merits 
of an issue that may affect the responsibilities of a particular 
resource agency, they must also serve a copy of the document on that 
resource agency. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: August 18, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-17955 Filed 8-23-17; 8:45 am]
 BILLING CODE 6717-01-P