Sendero Carlsbad NGL, LLC; Notice of Request for Temporary Waiver, 40148-40149 [2017-17954]
Download as PDF
40148
Federal Register / Vol. 82, No. 163 / Thursday, August 24, 2017 / Notices
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Jennifer McCloskey at
the address or phone number listed
above. Minutes will also be available at
the following Web site: https://
energy.gov/em/services/communicationengagement/environmentalmanagement-advisory-board-emab.
Issued at Washington, DC, August 18,
2017.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2017–17902 Filed 8–23–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
rmajette on DSKBCKNHB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1832–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report (ER16–1832–000, 001,
002 and 003) to be effective N/A.
Filed Date: 8/17/17.
Accession Number: 20170817–5136.
Comments Due: 5 p.m. ET 9/7/17.
Docket Numbers: ER17–210–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report (ER17–210–002 and 004)
to be effective N/A.
Filed Date: 8/17/17.
Accession Number: 20170817–5135.
Comments Due: 5 p.m. ET 9/7/17.
Docket Numbers: ER17–2324–000.
Applicants: NSTAR Electric
Company.
Description: Initial rate filing: LCC
Services and Telemetering Services
Agreements—RMLD to be effective 8/
17/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5003.
Comments Due: 5 p.m. ET 9/8/17.
VerDate Sep<11>2014
15:29 Aug 23, 2017
Jkt 241001
Docket Numbers: ER17–2325–000.
Applicants: Colonial Eagle Solar, LLC.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5030.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2326–000.
Applicants: Conetoe II Solar, LLC.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5031.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2327–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205
filing re: cost recovery for regulated
transmission facilities to be effective 10/
18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5034.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2328–000.
Applicants: Duke Energy Kentucky,
Inc.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5035.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2329–000.
Applicants: Duke Energy Ohio, Inc.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5036.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2330–000.
Applicants: Laurel Hill Wind Energy,
LLC.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5038.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2331–000.
Applicants: North Allegheny Wind,
LLC.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5042.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2332–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT Schedule RE: New
Black Start Unit Revenue Requirements
Process to be effective 11/16/2017.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Filed Date: 8/18/17.
Accession Number: 20170818–5044.
Comments Due: 5 p.m. ET 9/8/17.
Docket Numbers: ER17–2333–000.
Applicants: Duke Energy Beckjord
Storage, LLC.
Description: Compliance filing: Order
No. 819 Compliance Filing to be
effective 10/18/2017.
Filed Date: 8/18/17.
Accession Number: 20170818–5059.
Comments Due: 5 p.m. ET 9/8/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 18, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17949 Filed 8–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR17–22–000]
Sendero Carlsbad NGL, LLC; Notice of
Request for Temporary Waiver
Take notice that on August 17, 2017,
pursuant to Rule 202 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.202 (2017),
Sendero Carlsbad NGL, LLC filed a
petition for temporary waiver of the
tariff filing and reporting requirements
for liquids pipelines the Commission
regulates under sections 6 and 20 of the
Interstate Commerce Act, 49 U.S.C. app
6, 20 (1988), and 18 CFR parts 341 and
357 of the Commission’s regulations, as
more fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
E:\FR\FM\24AUN1.SGM
24AUN1
Federal Register / Vol. 82, No. 163 / Thursday, August 24, 2017 / Notices
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on September 15, 2017.
Dated: August 18, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17954 Filed 8–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2660–029]
rmajette on DSKBCKNHB2PROD with NOTICES
Woodland Pulp LLC; Notice of Petition
for Declaratory Order and Soliciting
Comments, Protests, and/or Motions
To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Petition for
Declaratory Order.
b. Project No: 2660–029.
c. Date Filed: July 27, 2017.
d. Applicant: Woodland Pulp, LLC.
e. Name of Project: Forest City Project.
f. Location: On the East Branch of the
St. Croix River in Washington and
Aroostook Counties, Maine.
VerDate Sep<11>2014
15:29 Aug 23, 2017
Jkt 241001
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Mr. Scott Beal,
Woodland Pulp, LLC, 144 Main Street,
Baileyville, ME 04694, Tel: 207–427–
4004.
i. FERC Contact: Any questions on
this notice should be addressed to Mr.
M. Joseph Fayyad, (202) 502–8759, or
email: Mo.Fayyad@ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2660–029.
k. Description of Project: The Forest
City Project is located at river mile 58
of the East Branch of the St. Croix River
on the international boundary between
the United States and Canada. The
existing project as licensed includes
only the lands, waters, and structures
that are located in the United States,
which consist of: (a) A 147-foot-long
section of the 540-foot-long, 12-foothigh earthen Forest City Dam that
includes: (i) A 110-foot-long west
earthen embankment, and (ii) a 37-footlong section of the timber-crib spillway
section with two 8.3-foot-wide, 10-foothigh spillway gates on the west side of
the spillway, which control the
impoundment between a minimum
elevation of 427.94 feet mean sea level
(msl) and a maximum elevation of
434.94 feet msl; (b) a 9,141-acre portion
of the 17,040-acre multi-lake
impoundment (North Lake and East
Grand Lake); and (c) appurtenant
facilities. The project does not occupy
federal lands and there are no
generating facilities located at the
project. The Forest City Project supplies
water to the unlicensed downstream
Grand Falls and Woodland
hydroelectric projects.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
40149
In November 2015, the Commission
issued Woodland Pulp a new license to
operate and maintain the Forest City
Project. In December 2016, Woodland
Pulp filed an application to surrender
its new license and decommission the
project by removing the gates located on
the United States side of the spillway.
The Commission is considering the
licensee’s surrender and
decommissioning proceeding in Project
No. 2660–028.
On July 24, 2017, Governor LePage of
Maine signed into law a resolve
authorizing Maine Department of Inland
Fisheries and Wildlife (Maine DIFW) to
assume ownership of the Forest City
Dam pursuant to two conditions: (1) The
Commission finds that the Forest City
Project will not require a license from
the Commission if Maine DIFW owns
the U.S. portion of the dam; and (2)
Maine DIFW executes an agreement
with Woodland Pulp that provides that
Woodland Pulp and its successors will
operate and maintain the Forest City
Dam consistent with the manner in
which the dam was operated in most
recent 12 months, at the direction of the
State, and at no cost to the State, for a
period of 15 years. On July 27, 2017,
Maine DIFW and Woodland Pulp
executed an operation and management
agreement.
l. Description of Request: The licensee
requests the Commission to find that the
Forest City Project will not be necessary
or appropriate for any downstream unit
of development if the licensee transfers
the dam to the Maine Department of
Inland Fisheries and Wildlife, and will
therefore no longer be required to be
licensed pursuant to section 23(b)(1) of
the Federal Power Act.
m. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE., Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 82, Number 163 (Thursday, August 24, 2017)]
[Notices]
[Pages 40148-40149]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-17954]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR17-22-000]
Sendero Carlsbad NGL, LLC; Notice of Request for Temporary Waiver
Take notice that on August 17, 2017, pursuant to Rule 202 of the
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.202 (2017), Sendero Carlsbad NGL, LLC filed a
petition for temporary waiver of the tariff filing and reporting
requirements for liquids pipelines the Commission regulates under
sections 6 and 20 of the Interstate Commerce Act, 49 U.S.C. app 6, 20
(1988), and 18 CFR parts 341 and 357 of the Commission's regulations,
as more fully explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and
[[Page 40149]]
Procedure (18 CFR 385.211 and 385.214). Protests will be considered by
the Commission in determining the appropriate action to be taken, but
will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the comment date. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
Web site that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on September 15, 2017.
Dated: August 18, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-17954 Filed 8-23-17; 8:45 am]
BILLING CODE 6717-01-P