KEI (Maine) Power Management (III); Notice Soliciting Scoping Comments, 37856-37857 [2017-17090]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
37856
Federal Register / Vol. 82, No. 155 / Monday, August 14, 2017 / Notices
Filed Date: 8/8/17.
Accession Number: 20170808–5034.
Comments Due: 5 p.m. ET 8/29/17.
Docket Numbers: ER17–2256–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: Cost
Allocation for Brookline and Morgan
Transmission Projects (Part 1 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5173.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2257–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: Cost
Allocation for Brookline and Morgan
Transmission Projects (Part 2 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5175.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2258–000.
Applicants: Rock Falls Wind Farm
LLC.
Description: Baseline eTariff Filing:
Rock Falls Wind Farm Initial MarketBased Rate Application Filing to be
effective 10/7/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5180.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2259–000.
Applicants: Seville Solar One LLC.
Description: § 205(d) Rate Filing:
Revised SLA Rate Schedule No. 2 to be
effective 8/8/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5181.
Comments Due: 5 p.m. ET 8/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17087 Filed 8–11–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:45 Aug 11, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2809–034]
KEI (Maine) Power Management (III);
Notice Soliciting Scoping Comments
Take notice that the following
hydroelectric license application has
been filed with the Commission and is
available for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–2809–034.
c. Date filed: April 28, 2017.
d. Applicant: KEI (Maine) Power
Management (III) LLC (KEI Power).
e. Name of Project: American Tissue
Hydroelectric Project.
f. Location: On Cobbosseecontee
Stream, in the Town of Gardiner,
Kennebec County, Maine. There are no
Federal or tribal lands within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lewis C. Loon,
Operations and Maintenance Manager,
USA, KEI (Maine) Power Management
(III) LLC, 423 Brunswick Avenue,
Gardiner, ME 04345; (207) 203–3026.
i. FERC Contact: John Baummer, 202–
502–6837, or john.baummer@ferc.gov.
j. Deadline for filing scoping
comments: September 7, 2017.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2809–034.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
k. This application is not ready for
environmental analysis at this time.
l. The existing American Tissue
Project consists of: (1) A 256-foot-long,
23-foot-high cut granite, stone and brick
masonry dam that includes a 61-footlong west abutment section, a 100-footlong spillway section with 12-inch-high
flashboards and a crest elevation of
122.3 feet mean sea level (msl), and a
95-foot-long east abutment section with
an intake structure that includes: (a)
Trashracks with 2-inch clear spacing, (b)
a manually-operated headgate that
controls flow to the penstock, and (c)
three low level outlets at an elevation of
about 100 feet msl for releasing
minimum flows to the bypassed reach;
(2) an approximately 5.5-acre, 1,000foot-long impoundment with a normal
maximum water surface elevation of
123.3 feet msl; (3) a 280-foot-long, 7foot-diameter underground steel
penstock; (4) a 37-foot-long, 34-footwide concrete and wooden powerhouse
containing a single 1.0-MW turbinegenerator unit; (5) a 250-foot-long, 12kilovolt transmission line; (6) a tailrace;
and (7) appurtenant facilities.
KEI Power operates the project in a
run-of-river mode with an average
annual generation of 5,430 megawatthours. KEI Power proposes to release
year-round minimum flows of 10 cubic
feet per second (cfs) (or inflow to the
impoundment, whichever is less), to the
bypassed reach to enhance habitat for
aquatic organisms and provide
downstream passage for alewives. KEI
Power also proposes to release a
minimum flow of 52 cfs (or inflow,
whichever is less) to the tailrace to
protect aquatic resources in the
downstream reach. In addition, KEI
Power proposes to upgrade the existing
downstream fish passage facility,
construct and operate a new upstream
passage facility for American eel, and
release 40 cfs through the low level
gates of the dam from September 1 to
November 15 to facilitate downstream
eel passage.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to address the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item (h) above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
E:\FR\FM\14AUN1.SGM
14AUN1
Federal Register / Vol. 82, No. 155 / Monday, August 14, 2017 / Notices
For assistance, contact FERC Online
Support.
o. Scoping Process: The Commission
staff intends to prepare a single
Environmental Assessment (EA) for the
American Tissue Hydroelectric Project
in accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on Scoping Document 1
(SD1) issued on August 8, 2017.
Copies of SD1 outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17090 Filed 8–11–17; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Meetings
AGENCY:
Federal Election Commission
Thursday, August 17,
2017 at 10:00 a.m.
DATE AND TIME:
999 E Street NW., Washington,
DC. (Ninth floor).
PLACE:
This meeting will be open to
the public.
sradovich on DSK3GMQ082PROD with NOTICES
STATUS:
ITEMS TO BE DISCUSSED:
Audit Division Recommendation
Memorandum on the Illinois
Republican Party (IRP) (A13–09)
Draft Advisory Opinion 2017–06: Stein
and Gottlieb
Management and Administrative
Matters
Individuals who plan to attend and
require special assistance, such as sign
language interpretation or other
reasonable accommodations, should
contact Dayna C. Brown, Secretary and
Clerk, at (202) 694–1040, at least 72
hours prior to the meeting date.
VerDate Sep<11>2014
16:45 Aug 11, 2017
Jkt 241001
PERSON TO CONTACT FOR INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
Laura E. Sinram,
Acting Deputy Secretary of the Commission.
[FR Doc. 2017–17237 Filed 8–10–17; 4:15 pm]
BILLING CODE 6715–01–P
FEDERAL MARITIME COMMISSION
Notice of Agreements Filed
The Commission hereby gives notice
of the filing of the following agreements
under the Shipping Act of 1984.
Interested parties may submit comments
on the agreement to the Secretary,
Federal Maritime Commission,
Washington, DC 20573, within twelve
days of the date this notice appears in
the Federal Register. A copy of the
agreement is available through the
Commission’s Web site (www.fmc.gov)
or by contacting the Office of
Agreements at (202)–523–5793 or
tradeanalysis@fmc.gov.
Agreement No.: 012108–006.
Title: The World Liner Data
Agreement.
Parties: Maersk Line A/S; CMA CGM
S.A.; COSCO Shipping Lines Co., Ltd.;
Hamburg-Sud; Hapag-Lloyd AG;
Mediterranean Shipping Company S.A.;
Orient Overseas Container Line Ltd.;
United Arab Shipping Company S.A.G.;
Hyundai Merchant Marine Co., Ltd.;
Evergreen Line Joint Service Agreement;
Nile Dutch Africa Line B.V.; Zim
Integrated Shipping Services Limited;
and Independent Container Line Ltd.
Filing Party: Wayne Rohde, Esq.;
Cozen O’Connor; 1200 Nineteenth Street
NW.; Washington, DC 20036.
Synopsis: The amendment deletes
ANL and Hanjin as parties and adds
COSCO and Nile Dutch as parties to the
Agreement.
Agreement No.: 012300–001.
Title: The COSCO Shipping/KL/
YMUK/ELJSA Slot Allocation and
Sailing Agreement.
Parties: COSCO Shipping Lines Co.,
Ltd., Limited; Kawasaki Kisen Kaisha,
Ltd.; Yang Ming (UK) Ltd.; Hanjin
Shipping Co., Ltd.; and the Evergreen
Line Joint Service Agreement.
Filing Party: Eric. C. Jeffrey, Esq.;
Nixon Peabody LLP; 799 9th Street NW.,
Suite 500; Washington, DC 20001.
Synopsis: The amendment deletes
Hanjin Shipping as a member of the
agreement, changes the name of the
agreement accordingly, and updates the
name of COSCO Shipping.
Agreement No.: 012439–001.
Title: THE Alliance Agreement.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
37857
Parties: Hapag-Lloyd AG and HapagLloyd USA LLC (acting as one party);
Kawasaki Kisen Kaisha, Ltd.; Mitsui
O.S.K. Lines, Ltd.; Nippon Yusen
Kaisha; and Yang Ming Marine
Transport Corp.
Filing Party: David F. Smith, Esq.;
Cozen O’Conner; 1200 Nineteenth Street
NW.; Washington, DC 20036.
Synopsis: The amendment authorizes
the Parties to the Agreement to form,
contribute funds to, develop rules for,
and administer a contingency fund
designed to protect against the effects of
one of the parties experiencing financial
distress or an insolvency event. The
parties have requested expedited
review.
By Order of the Federal Maritime
Commission.
Dated: August 9, 2017.
JoAnne D. O’ Bryant,
Program Analyst.
[FR Doc. 2017–17126 Filed 8–11–17; 8:45 am]
BILLING CODE 6731–AA–P
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisitions of Shares of a Bank or
Bank Holding Company
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire shares of a bank
or bank holding company. The factors
that are considered in acting on the
notices are set forth in paragraph 7 of
the Act (12 U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the offices of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than August
29, 2017.
A. Federal Reserve Bank of Kansas
City (Dennis Denney, Assistant Vice
President) 1 Memorial Drive, Kansas
City, Missouri 64198–0001:
1. Deborah Viergutz, Ellenton,
Florida; Lisa A. Verzani, Helena,
Montana; Donald Verzani and Patricia
L. Verzani, both of Portland, Oregon;
and Jenny Wilcynski and Mike
Wilcynski, both of Big Sky, Montana; to
retain or acquire voting shares of First
State Bancorp, Inc., Randolph,
Nebraska, and for approval as members
of the Viergutz Family Group to control
voting shares of First State Bancorp,
E:\FR\FM\14AUN1.SGM
14AUN1
Agencies
[Federal Register Volume 82, Number 155 (Monday, August 14, 2017)]
[Notices]
[Pages 37856-37857]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-17090]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2809-034]
KEI (Maine) Power Management (III); Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric license application
has been filed with the Commission and is available for public
inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: P-2809-034.
c. Date filed: April 28, 2017.
d. Applicant: KEI (Maine) Power Management (III) LLC (KEI Power).
e. Name of Project: American Tissue Hydroelectric Project.
f. Location: On Cobbosseecontee Stream, in the Town of Gardiner,
Kennebec County, Maine. There are no Federal or tribal lands within the
project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Lewis C. Loon, Operations and Maintenance
Manager, USA, KEI (Maine) Power Management (III) LLC, 423 Brunswick
Avenue, Gardiner, ME 04345; (207) 203-3026.
i. FERC Contact: John Baummer, 202-502-6837, or
john.baummer@ferc.gov.
j. Deadline for filing scoping comments: September 7, 2017.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2809-034.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. The existing American Tissue Project consists of: (1) A 256-
foot-long, 23-foot-high cut granite, stone and brick masonry dam that
includes a 61-foot-long west abutment section, a 100-foot-long spillway
section with 12-inch-high flashboards and a crest elevation of 122.3
feet mean sea level (msl), and a 95-foot-long east abutment section
with an intake structure that includes: (a) Trashracks with 2-inch
clear spacing, (b) a manually-operated headgate that controls flow to
the penstock, and (c) three low level outlets at an elevation of about
100 feet msl for releasing minimum flows to the bypassed reach; (2) an
approximately 5.5-acre, 1,000-foot-long impoundment with a normal
maximum water surface elevation of 123.3 feet msl; (3) a 280-foot-long,
7-foot-diameter underground steel penstock; (4) a 37-foot-long, 34-
foot-wide concrete and wooden powerhouse containing a single 1.0-MW
turbine-generator unit; (5) a 250-foot-long, 12-kilovolt transmission
line; (6) a tailrace; and (7) appurtenant facilities.
KEI Power operates the project in a run-of-river mode with an
average annual generation of 5,430 megawatt-hours. KEI Power proposes
to release year-round minimum flows of 10 cubic feet per second (cfs)
(or inflow to the impoundment, whichever is less), to the bypassed
reach to enhance habitat for aquatic organisms and provide downstream
passage for alewives. KEI Power also proposes to release a minimum flow
of 52 cfs (or inflow, whichever is less) to the tailrace to protect
aquatic resources in the downstream reach. In addition, KEI Power
proposes to upgrade the existing downstream fish passage facility,
construct and operate a new upstream passage facility for American eel,
and release 40 cfs through the low level gates of the dam from
September 1 to November 15 to facilitate downstream eel passage.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to address the document. For assistance, contact
FERC Online Support. A copy is available for inspection and
reproduction at the address in item (h) above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
[[Page 37857]]
For assistance, contact FERC Online Support.
o. Scoping Process: The Commission staff intends to prepare a
single Environmental Assessment (EA) for the American Tissue
Hydroelectric Project in accordance with the National Environmental
Policy Act. The EA will consider both site-specific and cumulative
environmental impacts and reasonable alternatives to the proposed
action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on Scoping Document 1 (SD1) issued on
August 8, 2017.
Copies of SD1 outlining the subject areas to be addressed in the EA
were distributed to the parties on the Commission's mailing list and
the applicant's distribution list. Copies of SD1 may be viewed on the
web at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, call 1-866-208-3676 or
for TTY, (202) 502-8659.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-17090 Filed 8-11-17; 8:45 am]
BILLING CODE 6717-01-P