Combined Notice of Filings #1, 37855-37856 [2017-17087]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 155 / Monday, August 14, 2017 / Notices
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–739–034.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee filed an update to the Claytor
Project’s Shoreline Management Plan
(SMP), pursuant to Section 3.5 of the
current SMP and Article 414 of the
project’s license. The revised SMP
includes minor revisions and updates
throughout the plan, including
formatting changes and updates to
existing tables to reflect current data.
Other notable changes include:
Clarification of terms used (i.e., steep
slope, automatic boat cover, highdensity multi-use, etc.); amending
vegetation removal regulations; adding
permitting exceptions; and
incorporating various changes requested
by agencies during the consultation
process.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
VerDate Sep<11>2014
16:45 Aug 11, 2017
Jkt 241001
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17089 Filed 8–11–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
37855
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–153–000.
Applicants: Bayshore Solar B, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, Request for
Expedited Consideration and
Confidential Treatment of Bayshore
Solar B, LLC.
Filed Date: 8/7/17.
Accession Number: 20170807–5184.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: EC17–154–000.
Applicants: Sagebrush, a California
partnership, Sagebrush Asset Holdings,
LLC, Sky River LLC.
Description: Application For
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Sky River LLC, et.
al.
Filed Date: 8/7/17.
Accession Number: 20170807–5190.
Comments Due: 5 p.m. ET 8/28/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2144–007;
ER10–3308–026; ER11–2005–024;
ER11–2007–021; ER11–2009–024;
ER11–2011–024; ER11–2013–024;
ER11–2014–024; ER11–2016–021;
ER11–3989–020; ER12–1223–021;
ER12–1829–016; ER12–2201–015;
ER12–2311–015; ER12–2528–014;
ER14–2145–007; ER16–2363–003.
Applicants: Beebe 1B Renewable
Energy, LLC, Beebe Renewable Energy,
LLC, Bluestem Wind Energy, LLC,
Cassia Gulch Wind Park, LLC, Cow
Branch Wind Power, LLC, CR Clearing,
LLC, Criterion Power Partners, LLC,
Fourmile Wind Energy, LLC, Harvest
WindFarm, LLC, Harvest II Windfarm,
LLC, High Mesa Energy, LLC, Michigan
Wind 1, LLC, Michigan Wind 2, LLC,
Shooting Star Wind Project, LLC, Tuana
Springs Energy, LLC, Wildcat Wind,
LLC, Wind Capital Holdings, LLC.
Description: Notice of Change in
Status of the Exelon Sellers.
Filed Date: 8/7/17.
Accession Number: 20170807–5199.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–795–002.
Applicants: ISO New England Inc.
Description: Tariff Amendment: ISO–
NE Filing to Re-Establish Statutory
Action Date to be effective 3/15/2017.
E:\FR\FM\14AUN1.SGM
14AUN1
sradovich on DSK3GMQ082PROD with NOTICES
37856
Federal Register / Vol. 82, No. 155 / Monday, August 14, 2017 / Notices
Filed Date: 8/8/17.
Accession Number: 20170808–5034.
Comments Due: 5 p.m. ET 8/29/17.
Docket Numbers: ER17–2256–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: Cost
Allocation for Brookline and Morgan
Transmission Projects (Part 1 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5173.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2257–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: Cost
Allocation for Brookline and Morgan
Transmission Projects (Part 2 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5175.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2258–000.
Applicants: Rock Falls Wind Farm
LLC.
Description: Baseline eTariff Filing:
Rock Falls Wind Farm Initial MarketBased Rate Application Filing to be
effective 10/7/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5180.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–2259–000.
Applicants: Seville Solar One LLC.
Description: § 205(d) Rate Filing:
Revised SLA Rate Schedule No. 2 to be
effective 8/8/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5181.
Comments Due: 5 p.m. ET 8/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–17087 Filed 8–11–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:45 Aug 11, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2809–034]
KEI (Maine) Power Management (III);
Notice Soliciting Scoping Comments
Take notice that the following
hydroelectric license application has
been filed with the Commission and is
available for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–2809–034.
c. Date filed: April 28, 2017.
d. Applicant: KEI (Maine) Power
Management (III) LLC (KEI Power).
e. Name of Project: American Tissue
Hydroelectric Project.
f. Location: On Cobbosseecontee
Stream, in the Town of Gardiner,
Kennebec County, Maine. There are no
Federal or tribal lands within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lewis C. Loon,
Operations and Maintenance Manager,
USA, KEI (Maine) Power Management
(III) LLC, 423 Brunswick Avenue,
Gardiner, ME 04345; (207) 203–3026.
i. FERC Contact: John Baummer, 202–
502–6837, or john.baummer@ferc.gov.
j. Deadline for filing scoping
comments: September 7, 2017.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2809–034.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
k. This application is not ready for
environmental analysis at this time.
l. The existing American Tissue
Project consists of: (1) A 256-foot-long,
23-foot-high cut granite, stone and brick
masonry dam that includes a 61-footlong west abutment section, a 100-footlong spillway section with 12-inch-high
flashboards and a crest elevation of
122.3 feet mean sea level (msl), and a
95-foot-long east abutment section with
an intake structure that includes: (a)
Trashracks with 2-inch clear spacing, (b)
a manually-operated headgate that
controls flow to the penstock, and (c)
three low level outlets at an elevation of
about 100 feet msl for releasing
minimum flows to the bypassed reach;
(2) an approximately 5.5-acre, 1,000foot-long impoundment with a normal
maximum water surface elevation of
123.3 feet msl; (3) a 280-foot-long, 7foot-diameter underground steel
penstock; (4) a 37-foot-long, 34-footwide concrete and wooden powerhouse
containing a single 1.0-MW turbinegenerator unit; (5) a 250-foot-long, 12kilovolt transmission line; (6) a tailrace;
and (7) appurtenant facilities.
KEI Power operates the project in a
run-of-river mode with an average
annual generation of 5,430 megawatthours. KEI Power proposes to release
year-round minimum flows of 10 cubic
feet per second (cfs) (or inflow to the
impoundment, whichever is less), to the
bypassed reach to enhance habitat for
aquatic organisms and provide
downstream passage for alewives. KEI
Power also proposes to release a
minimum flow of 52 cfs (or inflow,
whichever is less) to the tailrace to
protect aquatic resources in the
downstream reach. In addition, KEI
Power proposes to upgrade the existing
downstream fish passage facility,
construct and operate a new upstream
passage facility for American eel, and
release 40 cfs through the low level
gates of the dam from September 1 to
November 15 to facilitate downstream
eel passage.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to address the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item (h) above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
E:\FR\FM\14AUN1.SGM
14AUN1
Agencies
[Federal Register Volume 82, Number 155 (Monday, August 14, 2017)]
[Notices]
[Pages 37855-37856]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-17087]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-153-000.
Applicants: Bayshore Solar B, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, Request for Expedited Consideration and Confidential
Treatment of Bayshore Solar B, LLC.
Filed Date: 8/7/17.
Accession Number: 20170807-5184.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: EC17-154-000.
Applicants: Sagebrush, a California partnership, Sagebrush Asset
Holdings, LLC, Sky River LLC.
Description: Application For Authorization for Disposition of
Jurisdictional Facilities and Request for Expedited Action of Sky River
LLC, et. al.
Filed Date: 8/7/17.
Accession Number: 20170807-5190.
Comments Due: 5 p.m. ET 8/28/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER14-2144-007; ER10-3308-026; ER11-2005-024; ER11-
2007-021; ER11-2009-024; ER11-2011-024; ER11-2013-024; ER11-2014-024;
ER11-2016-021; ER11-3989-020; ER12-1223-021; ER12-1829-016; ER12-2201-
015; ER12-2311-015; ER12-2528-014; ER14-2145-007; ER16-2363-003.
Applicants: Beebe 1B Renewable Energy, LLC, Beebe Renewable Energy,
LLC, Bluestem Wind Energy, LLC, Cassia Gulch Wind Park, LLC, Cow Branch
Wind Power, LLC, CR Clearing, LLC, Criterion Power Partners, LLC,
Fourmile Wind Energy, LLC, Harvest WindFarm, LLC, Harvest II Windfarm,
LLC, High Mesa Energy, LLC, Michigan Wind 1, LLC, Michigan Wind 2, LLC,
Shooting Star Wind Project, LLC, Tuana Springs Energy, LLC, Wildcat
Wind, LLC, Wind Capital Holdings, LLC.
Description: Notice of Change in Status of the Exelon Sellers.
Filed Date: 8/7/17.
Accession Number: 20170807-5199.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17-795-002.
Applicants: ISO New England Inc.
Description: Tariff Amendment: ISO-NE Filing to Re-Establish
Statutory Action Date to be effective 3/15/2017.
[[Page 37856]]
Filed Date: 8/8/17.
Accession Number: 20170808-5034.
Comments Due: 5 p.m. ET 8/29/17.
Docket Numbers: ER17-2256-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Cost Allocation for
Brookline and Morgan Transmission Projects (Part 1 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807-5173.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17-2257-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Cost Allocation for
Brookline and Morgan Transmission Projects (Part 2 of 2) to be
effective 10/6/2017.
Filed Date: 8/7/17.
Accession Number: 20170807-5175.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17-2258-000.
Applicants: Rock Falls Wind Farm LLC.
Description: Baseline eTariff Filing: Rock Falls Wind Farm Initial
Market-Based Rate Application Filing to be effective 10/7/2017.
Filed Date: 8/7/17.
Accession Number: 20170807-5180.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17-2259-000.
Applicants: Seville Solar One LLC.
Description: Sec. 205(d) Rate Filing: Revised SLA Rate Schedule
No. 2 to be effective 8/8/2017.
Filed Date: 8/7/17.
Accession Number: 20170807-5181.
Comments Due: 5 p.m. ET 8/28/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-17087 Filed 8-11-17; 8:45 am]