Combined Notice of Filings #1, 37582-37583 [2017-16957]
Download as PDF
37582
Federal Register / Vol. 82, No. 154 / Friday, August 11, 2017 / Notices
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4758,
Queue Position No. AA2–177 to be
effective 7/10/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5139.
Comments Due: 5 p.m. ET 8/28/17.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF17–1266–000.
Applicants: Escondido Bioenergy
Facilty, LLC.
Description: Form 556 of Escondido
Bioenergy Facilty, LLC.
Filed Date: 8/3/17.
Accession Number: 20170803–5043.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 7, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–16958 Filed 8–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14851–000]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
White Pine Waterpower, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On July 13, 2017, White Pine
Waterpower, LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the White Pine Pumped Storage
Project to be located near the town of
Ely in White Pine, Nevada. The sole
purpose of a preliminary permit, if
VerDate Sep<11>2014
17:18 Aug 10, 2017
Jkt 241001
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The applicant proposes to study two
alternative closed-loop pumped storage
alternatives at the site: One sized to 250
megawatts (MW) and the other to 500
MW. The 500-MW alternative would
consist of the following: (1) A new
upper reservoir with a surface area of 52
acres and a storage capacity of 2,400
acre-feet at a surface elevation of
approximately 8,530 feet above mean
sea level (msl) created through
construction of a new earth or rockfilled dam; (2) a new lower reservoir
with a surface area of 40 acres and a
total storage capacity of 2,400 acre-feet
at a surface elevation of 6,290 feet msl;
(3) 10,600 feet of tunnel and penstock
connecting the upper and lower
reservoirs; (5) a new underground
powerhouse containing three turbinegenerator units; (6) a new 1.5 mile
transmission line connecting the
powerhouse to a nearby electric grid
interconnection, (7) appurtenant
facilities. The 500-MW alternative
would have an annual generation of
502,717 megawatt-hours (MWh).
For the 250-MW alternative, the new
upper and lower reservoirs would be
sized to have half of the storage of the
500-MW alternative (1,200 acre-feet),
reducing the dam size needed to
impound the reservoirs. The alternative
would require 11,700 feet of tunnel and
penstock and have 2 pump-generating
units. The 250-MW alternative would
require the same transmission line and
would have an estimated annual
generation of 547,500 MWh.
Applicant Contact: Matthew Shapiro,
CEO, Gridflex Energy, LLC, 1210 W.
Franklin Street, Suite 2, Boise, ID 83702.
FERC Contact: Jim Fargo; phone: (202)
502–6095.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14851–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14851) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 7, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–16960 Filed 8–10–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–151–000.
Applicants: Waverly Wind Farm LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Waverly Wind
Farm LLC.
Filed Date: 8/4/17.
Accession Number: 20170804–5211.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: EC17–152–000.
Applicants: GenOn Energy, Inc.
Description: Application of GenOn
Energy, Inc. and Its Public Utility
Subsidiaries for Approval Under
Section 203 of the Federal Power Act
and Request for Expedited Action.
Filed Date: 8/4/17.
Accession Number: 20170804–5214.
Comments Due: 5 p.m. ET 8/25/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–328–004;
ER10–2196–004; ER10–2740–012; ER10–
2742–011; ER11–4027–009; ER13–1143–
005; ER13–1144–005; ER14–152–008;
ER15–1657–005; ER17–1849–001.
Applicants: Cogentrix Virginia
Financing Holding Com, Elgin Energy
E:\FR\FM\11AUN1.SGM
11AUN1
Federal Register / Vol. 82, No. 154 / Friday, August 11, 2017 / Notices
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Center, LLC, Essential Power OPP, LLC,
Essential Power Rock Springs, LLC,
James River Genco, LLC, Nautilus
Power, LLC, Rocky Road Power, LLC,
SEPG Energy Marketing Services, LLC,
Tilton Energy LLC, Lakewood
Cogeneration, L.P.
Description: Notice of Non-Material
Change in Status of Cogentrix Virginia
Financing Holding Company, LLC, et al.
Filed Date: 8/4/17.
Accession Number: 20170804–5216.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2248–000.
Applicants: Sierra Pacific Power
Company.
Description: Notice of Cancellation of
Emergency Services Agreement of Sierra
Pacific Power Company.
Filed Date: 8/4/17.
Accession Number: 20170804–5230.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2249–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Duke Energy Indiana, LLC.
Description: § 205(d) Rate Filing:
2017–08–07_DEI–DEI WDS Termination
to be effective 8/8/2017.
Filed Date: 8/7/17.
Accession Number: 20170807–5072.
Comments Due: 5 p.m. ET 8/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 7, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
17:18 Aug 10, 2017
[ER–FRL–9034–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements
Filed 07/31/2017 Through 08/04/2017
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20170150, Final Supplement,
DOS, ND, Line 67 Expansion
(previously known as the Alberta
Clipper Pipeline), Contact: Mary D.
Hassell 202–736–7428.
EIS No. 20170151, Draft, USFS, MN,
School Trust Land Exchange,
Comment Period Ends: 10/10/2017,
Contact: Peter Taylor 218–626–4368.
EIS No. 20170152, Draft, BR, CA, San
Luis Low Point Improvement Project,
Comment Period Ends: 09/25/2017,
Contact: Nicole Johnson 916–978–
5085.
EIS No. 20170153, Final, ARS, ID, U.S.
Sheep Experimental Station Grazing
and Associated Activities Project,
Review Period Ends: 09/11/2017,
Contact: Gary Mayo 202–260–9494.
Dated: August 8, 2017.
Dawn Roberts,
Management Analyst, NEPA Compliance
Division, Office of Federal Activities.
[FR Doc. 2017–17018 Filed 8–10–17; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9965–41–Region 10]
Jkt 241001
The United States
Environmental Protection Agency (EPA)
is requesting comments on and will
hold public hearings for the State of
Idaho’s National Pollutant Discharge
Elimination System (NPDES) program
application (to be referred to as the
‘‘IPDES program application’’ or the
‘‘application’’). The Governor of the
State of Idaho submitted the application
to the EPA Region 10 Administrator
pursuant to section 402 of the Clean
Water Act (CWA or ‘the Act’). With this
submission, the Idaho Department of
Environmental Quality (IDEQ) seeks
approval to administer the Idaho
Pollutant Discharge Elimination System
(IPDES) program regulating discharges
of pollutants into waters of the United
States under its jurisdiction. The State’s
request includes an implementation
plan to transfer from the EPA to IDEQ
the administration of specific program
components in four phases over a fouryear period beginning July 1, 2018, or
upon program approval, whichever is
later. If the EPA approves the IPDES
program, IDEQ will administer this
program, subject to continuing EPA
oversight and enforcement authority, in
place of the NPDES program now
administered by the EPA. The EPA will
retain permitting authority over all
facilities that are located within a tribal
reservation and/or facilities that
discharge to tribal waters. Today, the
EPA is requesting comments on the
State’s application and providing notice
of public hearings that will be held at
locations throughout the state. At the
close of the public comment period, the
EPA will review all the public
comments received and will either
approve or disapprove the State’s
request for program approval. If
approved, the NPDES program authority
will begin to transfer from the EPA to
IDEQ on or after July 1, 2018, with the
final program phase being transferred to
IDEQ on or after July 1, 2021.
SUMMARY:
Comments must be received on
or before October 10, 2017.
DATES:
Location of Informational
Meetings and Public Hearings: EPA
Region 10 will hold five information
meetings, with each followed by a
public hearing on the following dates
and times. Please check the Web site at
https://www.epa.gov/npdes-permits/
idaho-npdes-program-authorization
prior to the scheduled dates for any
updates to this information.
ADDRESSES:
Public Notice of State of Idaho National
Pollutant Discharge Elimination
System (NPDES) Program Submission
for EPA Approval
Environmental Protection
Agency (EPA).
ACTION: Notice of availability; request
for comment; notice of public hearing.
AGENCY:
[FR Doc. 2017–16957 Filed 8–10–17; 8:45 am]
VerDate Sep<11>2014
ENVIRONMENTAL PROTECTION
AGENCY
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
37583
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 82, Number 154 (Friday, August 11, 2017)]
[Notices]
[Pages 37582-37583]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-16957]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-151-000.
Applicants: Waverly Wind Farm LLC.
Description: Application for Authorization for Disposition of
Jurisdictional Facilities and Request for Expedited Action of Waverly
Wind Farm LLC.
Filed Date: 8/4/17.
Accession Number: 20170804-5211.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: EC17-152-000.
Applicants: GenOn Energy, Inc.
Description: Application of GenOn Energy, Inc. and Its Public
Utility Subsidiaries for Approval Under Section 203 of the Federal
Power Act and Request for Expedited Action.
Filed Date: 8/4/17.
Accession Number: 20170804-5214.
Comments Due: 5 p.m. ET 8/25/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-328-004; ER10-2196-004; ER10-2740-012; ER10-
2742-011; ER11-4027-009; ER13-1143-005; ER13-1144-005; ER14-152-008;
ER15-1657-005; ER17-1849-001.
Applicants: Cogentrix Virginia Financing Holding Com, Elgin Energy
[[Page 37583]]
Center, LLC, Essential Power OPP, LLC, Essential Power Rock Springs,
LLC, James River Genco, LLC, Nautilus Power, LLC, Rocky Road Power,
LLC, SEPG Energy Marketing Services, LLC, Tilton Energy LLC, Lakewood
Cogeneration, L.P.
Description: Notice of Non-Material Change in Status of Cogentrix
Virginia Financing Holding Company, LLC, et al.
Filed Date: 8/4/17.
Accession Number: 20170804-5216.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17-2248-000.
Applicants: Sierra Pacific Power Company.
Description: Notice of Cancellation of Emergency Services Agreement
of Sierra Pacific Power Company.
Filed Date: 8/4/17.
Accession Number: 20170804-5230.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17-2249-000.
Applicants: Midcontinent Independent System Operator, Inc., Duke
Energy Indiana, LLC.
Description: Sec. 205(d) Rate Filing: 2017-08-07_DEI-DEI WDS
Termination to be effective 8/8/2017.
Filed Date: 8/7/17.
Accession Number: 20170807-5072.
Comments Due: 5 p.m. ET 8/28/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 7, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-16957 Filed 8-10-17; 8:45 am]
BILLING CODE 6717-01-P