Bonneville Power Administration; Notice of Filing, 37445-37446 [2017-16880]
Download as PDF
mstockstill on DSK30JT082PROD with NOTICES
Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices
changes to the proposed electrical
configuration, which has been designed
to make the proposed Project more costeffective for the Applicant.
The reconfiguration would connect
the proposed Project to the UNSE
transmission system at the proposed
Gateway Substation rather than at the
existing Valencia Substation, as initially
proposed. A new, approximately 3-mile,
overhead double-circuit 138-kV AC
transmission line would be constructed
on new monopoles. The first circuit
would originate at an existing pole
1,900 feet west of the existing Valencia
Substation and terminate at the
proposed Gateway Substation. At this
origination point, the existing UNSE
‘‘Vail to Valencia’’ transmission line
would be severed and connected to this
new line, thereby converting the
existing UNSE ‘‘Vail to Valencia’’
transmission line to the ‘‘Vail to
Gateway’’ transmission line. The second
circuit would originate at the proposed
Gateway Substation and proceed in an
easterly direction to the same pole
(1,900 feet west of the existing Valencia
Substation), where it would connect
with the existing portion of the UNSE
138-kV ‘‘Vail to Valencia’’ transmission
line that travels east to the existing
Valencia Substation. This circuit would
constitute the new ‘‘Gateway to
Valencia’’ transmission line and serve as
the source for Valencia. The existing
UNSE Vail to Valencia line currently
connects to the Valencia Substation; this
line is the current (and only) source of
power for the City of Nogales. The
Valencia Substation is the first existing
substation within the U.S. The Nogales
Interconnection project would change
the configuration such that the Vail to
Valencia line would become the Vail to
Gateway line. Because the Valencia
Substation still needs a source of power,
the Gateway to Valencia line would be
built. Minor modifications to relaying
equipment within the Valencia
Substation would be made to
accommodate this Gateway to Valencia
line.
In addition to the DC tie at the
Gateway site as initially proposed (now
referred to as the Nogales Gateway
Substation), on the eastern portion of
the Gateway site, a 138-kV UNSE
Gateway Substation would consist of a
three bay breaker and a half open air
configuration to accommodate the line
from Vail, the line to Valencia, and the
connection to the DC tie, as well as a
future UNSE distribution transformer.
The Nogales Gateway Substation and
the UNSE Gateway Substation would be
located on the Gateway site and
collectively referred to as the Gateway
Substation. There were no additional
VerDate Sep<11>2014
17:03 Aug 09, 2017
Jkt 241001
changes proposed in this amendment to
the location of the new, approximately
two-mile, overhead, 230-kV AC
transmission line extending south from
the proposed Gateway Substation to the
proposed international border crossing.
The proposed reconfiguration would not
affect the location of the proposed route
or ROW requirements, but certain
changes were proposed to be made to
the conductors and towers. A
comparison of the initial configuration
and the reconfiguration for each of the
alternative routes is provided in the
application amendment.
The draft Environmental Assessment
contains relevant figures in Chapters 1
and 2. It can be downloaded from the
Document Library page on the project
Web site: https://
nogalesinterconnectionea.com/.
The Proposed Project One-line
Diagram (Figure 2.4–5) illustrates the
details of the configuration as proposed
by the amendment. A side-by-side
comparison of the reconfiguration to the
original application is also in the
appendix to the Applicant’s amendment
(which can also be downloaded from
the project Web site).
Procedural Matters: Any person may
comment on this application by filing
such comment at the address provided
above. Any person seeking to become a
party to this proceeding must file a
motion to intervene at the address
provided above in accordance with Rule
214 of the Federal Energy Regulatory
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Two copies
of each comment or motion to intervene
should be filed with DOE on or before
the date listed above.
Additional copies of such motions to
intervene also should be filed directly
with: Enrique Marroquin, Nogales
Transmission, L.L.C., 1900 North Akard
Street, Dallas, Texas 75201.
Before a Presidential permit may be
issued or amended, DOE must
determine that the proposed action is in
the public interest. In making that
determination, DOE considers the
environmental impacts of the proposed
project pursuant to the National
Environmental Policy Act of 1969, as
amended, determines the project’s
impact on electric reliability by
ascertaining whether the proposed
project would adversely affect the
operation of the U.S. electric power
supply system under normal and
contingency conditions, and any other
factors that DOE may also consider
relevant to the public interest. DOE also
must obtain the concurrences of the
Secretary of State and the Secretary of
Defense before taking final action on a
Presidential permit application.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
37445
Copies of this application amendment
will be made available for public
inspection and copying (upon request)
at the address provided above, and by
accessing the program Web site at:
https://energy.gov/oe/services/electricitypolicy-coordination-andimplementation/internationalelectricity-regulatio-2.
Issued in Washington, DC, on August 3,
2017.
Christopher A. Lawrence,
Electricity Policy Analyst, Transmission
Permitting and Technical Assistance
Division, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2017–16882 Filed 8–9–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EF17–4–000]
Bonneville Power Administration;
Notice of Filing
Take notice that on July 31, 2017,
Bonneville Power Administration
submitted tariff filing per: BP–18 IS–18
Rate to be effective 10/1/2017.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
E:\FR\FM\10AUN1.SGM
10AUN1
37446
Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 30, 2017.
Dated: August 2, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–16880 Filed 8–9–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK30JT082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–134–000.
Applicants: Ameren Illinois
Company.
Description: Supplement to June 28,
2017 Application of Ameren Illinois
Company for Authorization under
Section 203 of the Federal Power Act
(revised Attachment N).
Filed Date: 8/4/17.
Accession Number: 20170804–5130.
Comments Due: 5 p.m. ET 8/14/17.
Docket Numbers: EC17–149–000.
Applicants: Bayshore Solar A, LLC.
Description: Application for
Authorization under Section 203 of the
Federal Power Act the Disposition of
Jurisdictional Facilities, Request for
Expedited Consideration and
Confidential Treatment of Bay Shore
Solar A, LLC.
Filed Date: 8/3/17.
Accession Number: 20170803–5179.
Comments Due: 5 p.m. ET 8/24/17.
Docket Numbers: EC17–150–000.
Applicants: Apple Blossom Wind,
LLC.
Description: Application for
Authorization of Transaction Pursuant
to Section 203 of the Federal Power Act
and Request of Apple Blossom Wind,
LLC.
Filed Date: 8/4/17.
Accession Number: 20170804–5170.
Comments Due: 5 p.m. ET 8/25/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–137–000.
Applicants: Techren Solar I LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Techren Solar I LLC.
Filed Date: 8/3/17.
Accession Number: 20170803–5195.
VerDate Sep<11>2014
17:03 Aug 09, 2017
Jkt 241001
Comments Due: 5 p.m. ET 8/24/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1789–001.
Applicants: Interstate Power and
Light Company.
Description: Tariff Amendment:
Amendment to IPL Wholesale Tariff
Application to be effective 8/8/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5189.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2075–001.
Applicants: Idaho Power Company.
Description: Tariff Amendment:
Amendment to EIM Tariff Filing to be
effective 1/25/2018.
Filed Date: 8/4/17.
Accession Number: 20170804–5179.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2238–000.
Applicants: Nexus Energy Inc.
Description: Baseline eTariff Filing:
Nexus Energy Market-based Rate Tariff
v1 to be effective 11/1/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5004.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2239–000.
Applicants: NorthWestern
Corporation.
Description: Notice of Termination of
Transmission Service Agreement No.
19–SD of NorthWestern Corporation.
Filed Date: 8/3/17.
Accession Number: 20170803–5181.
Comments Due: 5 p.m. ET 8/24/17.
Docket Numbers: ER17–2240–000.
Applicants: New York Independent
System Operator, Inc.
Description: 205(d) Rate Filing: 205
filing re: Removal of Bunce Creek PARs
cost recovery mechanism to be effective
10/3/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5075.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2241–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing: First
Revised Service Agreement No. 3903,
Queue No. T174/AB1–106 to be
effective 7/9/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5078.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2242–000.
Applicants: Southern California
Edison Company.
Description: 205(d) Rate Filing:
Amended and Restated Silver Peak 55
kV Interconnection Agreement to be
effective 8/6/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5110.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2243–000.
Applicants: Public Service Company
of Oklahoma.
Description: 205(d) Rate Filing: PSO
CSW Operating Companies MBR
Concurrence Cancellation to be effective
6/30/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5141.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2244–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of
Interconnection Construction Service
Agreement No 3460 to be effective 7/12/
2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5146.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2245–000.
Applicants: Moffett Solar 1, LLC.
Description: Baseline eTariff Filing:
Baseline—Market-Based Rate Tariff to
be effective 9/1/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5158.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2246–000.
Applicants: Midcontinent
Independent System Operator.
Description: § 205(d) Rate Filing:
2017–08–04_Tariff revisions to
implement regional cost allocation for
TMEPs to be effective 10/4/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5159.
Comments Due: 5 p.m. ET 8/25/17.
Docket Numbers: ER17–2247–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4591,
Non-Queue No. NQ143 to be effective 7/
7/2017.
Filed Date: 8/4/17.
Accession Number: 20170804–5168.
Comments Due: 5 p.m. ET 8/25/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–51–000.
Applicants: NorthWestern
Corporation.
Description: Application for
Authorization Under Section 204 of the
Federal Power Act to Issue Securities of
NorthWestern Corporation.
Filed Date: 8/4/17.
Accession Number: 20170804–5133.
Comments Due: 5 p.m. ET 8/25/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 82, Number 153 (Thursday, August 10, 2017)]
[Notices]
[Pages 37445-37446]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-16880]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EF17-4-000]
Bonneville Power Administration; Notice of Filing
Take notice that on July 31, 2017, Bonneville Power Administration
submitted tariff filing per: BP-18 IS-18 Rate to be effective 10/1/
2017.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
Web site that enables subscribers to receive email notification when a
document is added
[[Page 37446]]
to a subscribed docket(s). For assistance with any FERC Online service,
please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on August 30, 2017.
Dated: August 2, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-16880 Filed 8-9-17; 8:45 am]