Rover Pipeline LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Majorsville Compressor Station Amendment and Request for Comments on Environmental Issues, 37447-37448 [2017-16878]
Download as PDF
Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–16877 Filed 8–9–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–464–000]
mstockstill on DSK30JT082PROD with NOTICES
Rover Pipeline LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Majorsville
Compressor Station Amendment and
Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Amendment to the Rover Pipeline
Project involving construction and
operation of facilities by Rover Pipeline,
LLC (Rover) in Marshall County, West
Virginia. The Commission will use this
EA in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
VerDate Sep<11>2014
17:03 Aug 09, 2017
Jkt 241001
Washington, DC on or before September
4, 2017.
If you sent comments on this
amendment to the Commission before
the opening of this docket on May 17,
2017, you will need to file those
comments in Docket No. CP17–464–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. If you are filing a
comment on a particular project, please
select ‘‘Comment on a Filing’’ as the
filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP17–464–
000 with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Proposed Project
Rover proposes to install a third 3,550
horsepower natural gas compressor unit
at the Majorsville Compressor Station 1
and a new equipment run at the
Majorsville Meter Station in Marshall
County, West Virginia. The new unit
1 The Majorsville Compressor Station was
approved by the Commission on February 2, 2017
in docket no. CP15–93–000 as a component of the
Rover Pipeline Project and is currently under
construction.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
37447
would bring the Majorsville Compressor
Station to a total of 10,650 horsepower.
The proposal would increase the point
capacity of the Majorsville Compressor
Station and the Majorsville Meter
Station from 300 million cubic feet per
day (MMcf/d) to 400 MMcf/d. Rover
would house the new unit (and the
previously approved units) in a larger
compressor building. Rover has not
proposed to expand the station
boundary beyond the previously
approved limits. The general location of
the project facilities is shown in
appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would occur at Rover’s previously
approved and under construction
Majorsville Compressor Station.
Following construction, Rover would
maintain about the project’s facilities as
part of operations associated with the
Rover Pipeline Project.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss the
environmental impacts that could occur
as a result of the construction and
operation of the proposed project. We
will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
3 We, us, and our refer to the environmental staff
of the Commission’s Office of Energy Projects.
E:\FR\FM\10AUN1.SGM
10AUN1
37448
Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.4 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
mstockstill on DSK30JT082PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; environmental and public
interest groups; and other interested
parties. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
within 0.5 mile of the Majorsville
Compressor Station, and anyone who
submits comments on the project. We
will update the environmental mailing
list as the analysis proceeds to ensure
that we send the information related to
this environmental review to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an intervenor which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
VerDate Sep<11>2014
17:03 Aug 09, 2017
Jkt 241001
intervene. Instructions for becoming an
intervenor are in the Document-less
Intervention Guide under the e-filing
link on the Commission’s Web site.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the eLibrary
link. Click on the eLibrary link, click on
General Search and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., CP17–
464). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, any public sessions or site
visits will be posted on the
Commission’s calendar located at
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: August 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–16878 Filed 8–9–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–56–000; CP17–57–000]
Texas Eastern Transmission, L.P,
Brazoria Interconnector Gas Pipeline,
LLC; Notice of Schedule for
Environmental Review of the Stratton
Ridge Expansion Project
On February 3, 2017, Texas Eastern
Transmission, LP (Texas Eastern) and
Brazoria Interconnector Gas Pipeline,
LLC (BIG Pipeline) filed jointly an
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
application in Docket Nos. CP17–56–
000 and CP17–57–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate
certain natural gas pipeline facilities.
The proposed project is known as the
Stratton Ridge Expansion Project
(Project), and is designed to provide the
capacity necessary for Texas Eastern to
transport up to 322,000 dekatherms per
day of natural gas on a firm basis from
Texas Eastern’s existing
interconnections to a delivery point on
the BIG Pipeline near Stratton Ridge,
Texas.
On February 16, 2017, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—October 5, 2017
90-day Federal Authorization Decision
Deadline—January 3, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Stratton Ridge Project would
consist of:
• A new Angleton Compressor
Station, consisting of a 12,500
horsepower electric motor-driven
compressor in Brazoria County, Texas;
• a new 0.5 mile, 30-inch-diameter
pipeline lateral in Brazoria County,
Texas to interconnect with the BIG
intrastate pipeline system;
• installation of Clean Burn
Equipment at the Mont Belvieu
Compressor Station in Chambers
County, Texas; and
• installation of minor auxiliary and
support facilities (e.g. launcher and
receiver modification, valves, piping
modification) at existing Texas Eastern
facilities in San Jacinto, Lavaca, Waller,
and Shelby Counties, Texas.
Background
On March 24, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Stratton Ridge Project and
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 82, Number 153 (Thursday, August 10, 2017)]
[Notices]
[Pages 37447-37448]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-16878]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-464-000]
Rover Pipeline LLC; Notice of Intent To Prepare an Environmental
Assessment for the Proposed Majorsville Compressor Station Amendment
and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Amendment to the Rover
Pipeline Project involving construction and operation of facilities by
Rover Pipeline, LLC (Rover) in Marshall County, West Virginia. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. You can make a difference by providing us with
your specific comments or concerns about the project. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
Your input will help the Commission staff determine what issues they
need to evaluate in the EA. To ensure that your comments are timely and
properly recorded, please send your comments so that the Commission
receives them in Washington, DC on or before September 4, 2017.
If you sent comments on this amendment to the Commission before the
opening of this docket on May 17, 2017, you will need to file those
comments in Docket No. CP17-464-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has expert staff available to assist you at
(202) 502-8258 or FercOnlineSupport@ferc.gov. Please carefully follow
these instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
eRegister. If you are filing a comment on a particular project, please
select ``Comment on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP17-464-000 with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
Rover proposes to install a third 3,550 horsepower natural gas
compressor unit at the Majorsville Compressor Station \1\ and a new
equipment run at the Majorsville Meter Station in Marshall County, West
Virginia. The new unit would bring the Majorsville Compressor Station
to a total of 10,650 horsepower. The proposal would increase the point
capacity of the Majorsville Compressor Station and the Majorsville
Meter Station from 300 million cubic feet per day (MMcf/d) to 400 MMcf/
d. Rover would house the new unit (and the previously approved units)
in a larger compressor building. Rover has not proposed to expand the
station boundary beyond the previously approved limits. The general
location of the project facilities is shown in appendix 1.\2\
---------------------------------------------------------------------------
\1\ The Majorsville Compressor Station was approved by the
Commission on February 2, 2017 in docket no. CP15-93-000 as a
component of the Rover Pipeline Project and is currently under
construction.
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would occur at Rover's
previously approved and under construction Majorsville Compressor
Station. Following construction, Rover would maintain about the
project's facilities as part of operations associated with the Rover
Pipeline Project.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\3\ We, us, and our refer to the environmental staff of the
Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss the environmental impacts that could
occur as a result of the construction and operation of the proposed
project. We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments
[[Page 37448]]
received during the scoping process, we may also publish and distribute
the EA to the public for an allotted comment period. We will consider
all comments on the EA before making our recommendations to the
Commission. To ensure we have the opportunity to consider and address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\4\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; environmental and public
interest groups; and other interested parties. This list also includes
all affected landowners (as defined in the Commission's regulations)
who are within 0.5 mile of the Majorsville Compressor Station, and
anyone who submits comments on the project. We will update the
environmental mailing list as the analysis proceeds to ensure that we
send the information related to this environmental review to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an intervenor which is an official party to the Commission's
proceeding. Intervenors play a more formal role in the process and are
able to file briefs, appear at hearings, and be heard by the courts if
they choose to appeal the Commission's final ruling. An intervenor
formally participates in the proceeding by filing a request to
intervene. Instructions for becoming an intervenor are in the Document-
less Intervention Guide under the e-filing link on the Commission's Web
site. Motions to intervene are more fully described at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP17-
464). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, any public sessions or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: August 4, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-16878 Filed 8-9-17; 8:45 am]