Southwest Gas Storage Company; Notice of Request Under Blanket Authorization, 37209-37210 [2017-16752]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 152 / Wednesday, August 9, 2017 / Notices Description: § 205(d) Rate Filing: Revised MBR Tariff re Cat Seller & 819 to be effective 8/3/2017. Filed Date: 8/2/17. Accession Number: 20170802–5057. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2224–000. Applicants: New Covert Generating Company, LLC. Description: § 205(d) Rate Filing: Revised MBR Tariff re Cat Seller & 829 to be effective 8/3/2017. Filed Date: 8/2/17. Accession Number: 20170802–5058. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2225–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–08–02_SA 2931 ATC–WPL J390 E&P Termination to be effective 8/3/ 2017. Filed Date: 8/2/17. Accession Number: 20170802–5065. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2226–000. Applicants: Rolling Hills Generating, L.L.C. Description: § 205(d) Rate Filing: Revised MBR Tariff re Cat Seller & 819 to be effective 8/3/2017. Filed Date: 8/2/17. Accession Number: 20170802–5068. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2227–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended and Restated TSA Golden State Water Company RS No. 465 to be effective 10/2/2017. Filed Date: 8/2/17. Accession Number: 20170802–5075. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2228–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–08–02_SA 2509 ITC-Tuscola Wind E&P (J202) Termination to be effective 8/3/2017. Filed Date: 8/2/17. Accession Number: 20170802–5076. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2229–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Tariff Revisions to Change Frequency of Regional Cost Allocation Review to be effective 10/1/2017. Filed Date: 8/2/17. Accession Number: 20170802–5081. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2230–000. Applicants: Golden Spread Electric Cooperative, Inc. VerDate Sep<11>2014 17:00 Aug 08, 2017 Jkt 241001 Description: § 205(d) Rate Filing: Member Rate Change—North Plains to be effective 6/8/2017. Filed Date: 8/2/17. Accession Number: 20170802–5082. Comments Due: 5 p.m. ET 8/23/17. Docket Numbers: ER17–2231–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: OATT–PSCo–TSGT-Non-Conforming BASA 409 0.1.0 to be effective 4/1/2017. Filed Date: 8/2/17. Accession Number: 20170802–5087. Comments Due: 5 p.m. ET 8/23/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 2, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–16758 Filed 8–8–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–475–000] Southwest Gas Storage Company; Notice of Request Under Blanket Authorization Take notice that on July 19, 2017, Southwest Gas Storage Company (Southwest) 1300 Main Street, Houston, Texas 77002, filed in Docket No. CP17– 475–000 a prior notice request pursuant to sections 157.20, 157.208, 157.2135 and 157.216 of the Commission’s regulations under the Natural Gas Act for authorization to modify, replace, and abandon certain natural gas storage facilities and convert certain injection/ withdrawal wells to observation status within Southwest’s existing Howell Storage Field, located in Livingston PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 37209 County, Michigan, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Blair Lichtenwalter, Senior Director of Certificates, Southwest Gas Storage Company, 1300 Main Street, Houston, Texas 77002, at (713) 989–1205 or by email at blair.lichtenwalter@ energytransfer.com. Specifically, Southwest requests authorization to abandon in place seven storage lateral pipelines consisting of approximately 8,528 feet of existing 4, 6, 8, and 12-inch-diameter lateral pipelines and appurtenances, and to convert the connecting injection/ withdrawal wells to observation status. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If E:\FR\FM\09AUN1.SGM 09AUN1 37210 Federal Register / Vol. 82, No. 152 / Wednesday, August 9, 2017 / Notices a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the e-Filing link. Dated: August 1, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–16752 Filed 8–8–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2100–182—California] California Department of Water Resources; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC) regulations, 18 Code of Federal Regulations part 380, the Office of Energy Projects has reviewed an application filed June 23, 2017, by the California Department of Water Resources to permit Pacific Gas and Electric Company to reroute a portion of its transmission line across project lands in the vicinity of the project’s Thermalito Diversion Pool at the Feather River Hydroelectric Project No. 2100. The project is located on the Feather River in Butte County, California, and occupies lands of the United States administered by the U.S. Forest Service and the U.S. Bureau of Land Management. Staff prepared an environmental assessment (EA) for the application that analyzes the potential environmental effects of approving the transmission line reroute as a non-project use of project lands. In the EA, staff concludes that such an approval, with specified environmental protection measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission’s Public Reference Room or may it be viewed on the Commission’s Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number P–2100 in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, 202–502–8659. For further information, contact Mr. John Aedo at (415) 369–3335 or by email at john.aedo@ferc.gov. Dated: August 2, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–16756 Filed 8–8–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed B24 Hydroelectric Station would have a combined installed capacity of 150 kilowatts (kW), and would be located along a 24-inch diameter raw water pipeline. The project would be located near the Town of La Puente in Los Angeles County, California. Applicant Contact: Robert J. DiPrimio, Senior Vice President, San Gabriel Valley Water Company, 11142 Garvey Avenue, El Monte, CA 91733; Phone No. (626) 448–6183; Email rjdiprimio@ sgvwater.com. FERC Contact: Robert Bell, Phone No. (202) 502–6062; Email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new powerhouse containing one generating unit with an installed capacity of 150 kilowatts (kW) installed in the potable water pipeline; and (2) appurtenant facilities. The proposed project would have an estimated annual generation of 1,200 megawatt-hours (MWh). A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. [Docket No. CD17–17–000] San Gabriel Valley Water Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On July 27, 2017, San Gabriel Valley Water Company filed a notice of intent TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................. Y sradovich on DSK3GMQ082PROD with NOTICES FPA 30(a)(3)(C)(i), as amended by HREA FPA 30(a)(3)(C)(ii), as amended HREA. FPA 30(a)(3)(C)(iii), as amended HREA. by by Preliminary Determination: The proposed hydroelectric project will VerDate Sep<11>2014 17:00 Aug 08, 2017 Jkt 241001 On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. utilize an existing potable water pipeline, used to convey potable water PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Y Y Y to storage tanks for subsequent customer distribution. The addition of the B24 E:\FR\FM\09AUN1.SGM 09AUN1

Agencies

[Federal Register Volume 82, Number 152 (Wednesday, August 9, 2017)]
[Notices]
[Pages 37209-37210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-16752]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-475-000]


Southwest Gas Storage Company; Notice of Request Under Blanket 
Authorization

    Take notice that on July 19, 2017, Southwest Gas Storage Company 
(Southwest) 1300 Main Street, Houston, Texas 77002, filed in Docket No. 
CP17-475-000 a prior notice request pursuant to sections 157.20, 
157.208, 157.2135 and 157.216 of the Commission's regulations under the 
Natural Gas Act for authorization to modify, replace, and abandon 
certain natural gas storage facilities and convert certain injection/
withdrawal wells to observation status within Southwest's existing 
Howell Storage Field, located in Livingston County, Michigan, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the web at https://www.ferc.gov using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, please contact FERC 
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Blair 
Lichtenwalter, Senior Director of Certificates, Southwest Gas Storage 
Company, 1300 Main Street, Houston, Texas 77002, at (713) 989-1205 or 
by email at blair.lichtenwalter@energytransfer.com.
    Specifically, Southwest requests authorization to abandon in place 
seven storage lateral pipelines consisting of approximately 8,528 feet 
of existing 4, 6, 8, and 12-inch-diameter lateral pipelines and 
appurtenances, and to convert the connecting injection/withdrawal wells 
to observation status.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If

[[Page 37210]]

a protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the e-Filing link.

    Dated: August 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-16752 Filed 8-8-17; 8:45 am]
 BILLING CODE 6717-01-P