Wallowa Resources Community Solutions Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 35773-35774 [2017-16080]
Download as PDF
Federal Register / Vol. 82, No. 146 / Tuesday, August 1, 2017 / Notices
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 7, 2017.
Dated: July 26, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–16163 Filed 7–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–16–000]
Wallowa Resources Community
Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On July 20, 2017, Wallowa Resources
Community Solutions Inc. filed a notice
of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Wallowa
Lake County Service District Hydro
Station Project would have an installed
capacity of 20 kilowatts (kW), and
would be located along the existing
35773
State Park Spring municipal water
pipeline located near the town of
Joseph, Wallowa County, Oregon.
Applicant Contact: Kyle Petrocine,
401 NE 1st Street, Suite A, Enterprise,
OR 97828, Phone No. (541) 398–0018.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new 20kW impulse turbine and induction
generator; (2) a new, approximately 13foot by 14-foot powerhouse; and (3)
appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 149,000 kilowatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Satisfies
(Y/N)
Statutory provision
Description
FPA 30(a)(3)(A), as amended by HREA ...............
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume,
ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption
and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of
electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....
On or before August 9, 2013, the facility is not licensed, or exempted from
the licensing requirements of Part I of the FPA.
FPA 30(a)(3)(C)(i), as amended by HREA ............
mstockstill on DSK30JT082PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA ...........
FPA 30(a)(3)(C)(iii), as amended by HREA ..........
Preliminary Determination: The
proposed addition of the hydroelectric
project along the municipal water
pipeline will not alter its primary
purpose. Therefore, based upon the
above information and criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
VerDate Sep<11>2014
20:13 Jul 31, 2017
Jkt 241001
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
PO 00000
1 18
CFR 385.2001–2005 (2016).
Frm 00031
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
E:\FR\FM\01AUN1.SGM
01AUN1
35774
Federal Register / Vol. 82, No. 146 / Tuesday, August 1, 2017 / Notices
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD17–16) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email FERCOnline
Support@ferc.gov. For TTY, call (202)
502–8659.
Dated: July 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–16080 Filed 7–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
This filing is accessible online at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 21, 2017.
Dated: July 26, 2017.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2017–16164 Filed 7–31–17; 8:45 am]
BILLING CODE 6717–01–P
Medallion Pipeline Company, LLC;
Notice of Petition For Declaratory
Order
mstockstill on DSK30JT082PROD with NOTICES
[Docket No. OR17–18–000]
DEPARTMENT OF ENERGY
Take notice that on July 21, 2017,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2016),
Medallion Pipeline Company, LLC
(Medallion), filed a petition for a
declaratory order seeking approval of
the overall tariff and rate structure, and
open-season procedures for Medallion’s
proposed Wolfcamp Connector
expansion and Howard Lateral
expansion to transport crude oil from
Midland Basin in West Texas to
Colorado City Hub, as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
VerDate Sep<11>2014
20:13 Jul 31, 2017
Jkt 241001
Federal Energy Regulatory
Commission
[Docket No. IC17–11–000]
Commission Information Collection
Activities (FERC–549b); Comment
Request
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection [FERC–549B (Gas
Pipeline Rates: Capacity Reports and
Index of Customers)] to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (82 FR 18635, 4/20/
2017) requesting public comments. The
Commission received one comment on
the FERC–549B and is making this
notation in its submittal to OMB. The
sole comment, however, does not
pertain to this information collection
and is immaterial to the renewal effort
for the FERC–549B.1
DATES: Comments on the collection of
information are due by August 31, 2017.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
SUMMARY:
1 The comment can be found here: https://
elibrary.ferc.gov/idmws/common/OpenNat.asp?
fileID=14615693.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
1902–0169, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–0710.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC17–11–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/efiling
.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–549B (Gas Pipeline Rates:
Capacity Reports and Index of
Customers).
OMB Control No.: 1902–0169.
Type of Request: Three-year extension
of the FERC–549B information
collection requirements with no changes
to the current reporting requirements.
Abstract: The information collected
under the requirements of FERC–549B
includes both the Index of Customers
(IOC) report under Commission
regulations at 18 Code of Federal
Regulations (CFR) 284.13(c) and three
capacity reporting requirements. One of
these is in Commission regulations at 18
CFR 284.13(b) and requires reports on
firm and interruptible services. The
second is at 18 CFR 284.13(d)(1) and
requires pipelines make information on
capacity and flow information available
on their Internet Web sites. The third is
at 18 CFR 284.13(d)(2) and requires an
annual filing of peak day capacity.
Capacity Reports Under 284.13(b) and
284.13(d)(1)
On April 4, 1992, in Order No. 636
(RM91–11–000), the Commission
E:\FR\FM\01AUN1.SGM
01AUN1
Agencies
[Federal Register Volume 82, Number 146 (Tuesday, August 1, 2017)]
[Notices]
[Pages 35773-35774]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-16080]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD17-16-000]
Wallowa Resources Community Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On July 20, 2017, Wallowa Resources Community Solutions Inc. filed
a notice of intent to construct a qualifying conduit hydropower
facility, pursuant to section 30 of the Federal Power Act (FPA), as
amended by section 4 of the Hydropower Regulatory Efficiency Act of
2013 (HREA). The proposed Wallowa Lake County Service District Hydro
Station Project would have an installed capacity of 20 kilowatts (kW),
and would be located along the existing State Park Spring municipal
water pipeline located near the town of Joseph, Wallowa County, Oregon.
Applicant Contact: Kyle Petrocine, 401 NE 1st Street, Suite A,
Enterprise, OR 97828, Phone No. (541) 398-0018.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A new 20-kW impulse turbine and induction
generator; (2) a new, approximately 13-foot by 14-foot powerhouse; and
(3) appurtenant facilities. The proposed project would have an
estimated annual generating capacity of 149,000 kilowatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA........... The conduit the facility uses is a tunnel, Y
canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is
operated for the distribution of water for
agricultural, municipal, or industrial
consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA........ The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA....... The facility has an installed capacity that does Y
not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA...... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed addition of the
hydroelectric project along the municipal water pipeline will not alter
its primary purpose. Therefore, based upon the above information and
criteria, Commission staff preliminarily determines that the proposal
satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2)
state in the heading the name of the applicant and the project number
of the application to which the filing responds; (3) state the name,
address, and telephone number of the person filing; and (4) otherwise
comply with the requirements of sections 385.2001 through 385.2005 of
the Commission's regulations.\1\ All comments contesting Commission
staff's preliminary determination that the facility meets the
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2016).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp
[[Page 35774]]
using the ``eLibrary'' link. Enter the docket number (i.e., CD17-16) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: July 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-16080 Filed 7-31-17; 8:45 am]
BILLING CODE 6717-01-P