Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System, 35052 [2017-15789]
Download as PDF
35052
Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices
resulted in a lower level of safety than
was maintained before it was granted; or
(3) continuation of the exemption would
not be consistent with the goals and
objectives of 49 U.S.C. 31136 and 31315.
If the exemption is still effective at the
end of the two year period, the person
may apply to FMCSA for a renewal
under procedures in effect at that time.
Issued on: July 19, 2017.
Larry W. Minor,
Associate Administrator for Policy.
[FR Doc. 2017–15839 Filed 7–26–17; 8:45 am]
BILLING CODE 4910–EX–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2016–0058]
mstockstill on DSK30JT082PROD with NOTICES
Notice of Application for Approval of
Discontinuance or Modification of a
Railroad Signal System
Under part 235 of Title 49 of the Code
of Federal Regulations (CFR) and 49
U.S.C. 20502(a), this provides the public
notice that on June 30, 2017, Watco
Companies LLC (Watco) petitioned the
Federal Railroad Administration (FRA)
seeking reconsideration of a decision
regarding the discontinuance or
modification of a signal system. FRA
assigned the petition Docket Number
FRA–2016–0058.
Applicant: Watco Companies LLC,
Anthony Cox, VP of Engineering, 315 E.
3rd St., Pittsburg, KS 66762.
Watco is the owner-operator of the
Grand Elk Railroad LLC (GDLK), which
operates on track that is currently leased
from Norfolk Southern Railway
Company (NS). Watco requests
reconsideration under 49 CFR 235.13(a)
of FRA’s denial of its application to
discontinue and remove the traffic
control system (TCS) from mile post
(MP) 33.00 at Park, in Grand Rapids, MI
to MP 1.4 at the end of GDLK, in
Elkhart, IN. FRA issued its decision
letter denying the application on
November 29, 2016, and issued a second
letter to clarify the basis of its decision
on January 10, 2017.
Based on new facts and new evidence,
Watco is seeking reconsideration of its
application on behalf of GDLK. Watco
asserts that FRA’s Railroad Safety Board
(Board) based its denial on erroneous
information. Watco believes the
hazardous materials (hazmat)
information provided in the field report
considered by the Board was out of date
or incorrect.
Watco owns and operates 20 railroads
on 3570 miles of main line that is track
warrant controlled (TWC) and Watco
VerDate Sep<11>2014
19:17 Jul 26, 2017
Jkt 241001
states that of those railroads, 5 safely
transport more hazmat than GDLK.
GDLK conducts ultrasonic rail and
geometry testing twice per year over the
entire railroad. GDLK operates to the
north of subject trackage from milepost
33 to milepost 102.3 a mix of TWC and
yard limits (YL). There are two manual
interlockings on the north section of
track using TWC as an acceptable
method of operation. TWC is the
method of operation used by all
dispatched Watco railroads, including
parts of the GDLK. Watco states that the
discontinuance of the TCS section and
converting it to TWC maintains the
consistency of dispatching and
standardization of training for the
GDLK, and will provide a higher level
of safety through simplified operations
by having one method of controlled
operation rather than the two it has
now. Watco further states that this
consistency and standardization of
dispatching and training will enhance
the safety of GDLK operations.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulatons.gov and in person at the
U.S. Department of Transportation’s
Docket Operations Facility, 1200 New
Jersey Avenue SE., W12–140,
Washington, DC 20590. The Docket
Operations Facility is open from 9 a.m.
to 5 p.m., Monday through Friday,
except Federal Holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested parties desire
an opportunity for oral comment, they
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue, SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by
September 11, 2017 will be considered
PO 00000
Frm 00130
Fmt 4703
Sfmt 4703
by FRA before final action is taken.
Comments received after that date will
be considered as far as practicable.
Anyone can search the electronic
form of any written communications
and comments received into any of our
dockets by the name of the individual
submitting the comment (or signing the
document, if submitted on behalf of an
association, business, labor union, etc.).
In accordance with 5 U.S.C. 553(c), DOT
solicits comments from the public to
better inform its processes. DOT posts
these comments, without edit, including
any personal information the
commenter provides, to
www.regulations.gov, as described in
the system of records notice (DOT/ALL–
14 FDMS), which can be reviewed at
https://www.transportation.gov/privacy.
See also https://www.regulations.gov/
privacyNotice for the privacy notice of
regulations.gov.
Robert C. Lauby,
Associate Administrator for Railroad Safety,
Chief Safety Officer.
[FR Doc. 2017–15789 Filed 7–26–17; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2017–0059]
Petition for Waiver of Compliance
Under part 211 of Title 49 of the Code
of Federal Regulations (CFR), this
provides the public notice that on June
27, 2017 the San Bernardino Railroad
Historical Society Inc. (SBRHS)
petitioned the Federal Railroad
Administration (FRA) for a waiver of
compliance from certain provisions of
the Federal railroad safety regulations
contained at 49 CFR part 230, Steam
Locomotive Inspection and
Maintenance Standards. FRA assigned
the petition docket number FRA–2017–
0059.
SBRHS maintains and operates No.
3751, a 4–8–4 ‘‘Northern’’ type steam
locomotive built by the Baldwin
Locomotive Works in 1927 for the
Atchison, Topeka & Santa Fe Railroad.
SBRHS requests relief from performing
the 1472 service day inspection (SDI),
for No. 3751, as it pertains to the
inspection of the boiler every 15
calendar years or 1472 service days
under 49 CFR 230.17—One thousand
four hundred seventy-two (1472) service
day inspection. SBRHS is requesting an
additional 139 calendar days before
performing a 1472 SDI. The previous
SDI was performed on August 14, 2002.
Granting relief will allow No. 3751 an
E:\FR\FM\27JYN1.SGM
27JYN1
Agencies
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Page 35052]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-15789]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA-2016-0058]
Notice of Application for Approval of Discontinuance or
Modification of a Railroad Signal System
Under part 235 of Title 49 of the Code of Federal Regulations (CFR)
and 49 U.S.C. 20502(a), this provides the public notice that on June
30, 2017, Watco Companies LLC (Watco) petitioned the Federal Railroad
Administration (FRA) seeking reconsideration of a decision regarding
the discontinuance or modification of a signal system. FRA assigned the
petition Docket Number FRA-2016-0058.
Applicant: Watco Companies LLC, Anthony Cox, VP of Engineering, 315
E. 3rd St., Pittsburg, KS 66762.
Watco is the owner-operator of the Grand Elk Railroad LLC (GDLK),
which operates on track that is currently leased from Norfolk Southern
Railway Company (NS). Watco requests reconsideration under 49 CFR
235.13(a) of FRA's denial of its application to discontinue and remove
the traffic control system (TCS) from mile post (MP) 33.00 at Park, in
Grand Rapids, MI to MP 1.4 at the end of GDLK, in Elkhart, IN. FRA
issued its decision letter denying the application on November 29,
2016, and issued a second letter to clarify the basis of its decision
on January 10, 2017.
Based on new facts and new evidence, Watco is seeking
reconsideration of its application on behalf of GDLK. Watco asserts
that FRA's Railroad Safety Board (Board) based its denial on erroneous
information. Watco believes the hazardous materials (hazmat)
information provided in the field report considered by the Board was
out of date or incorrect.
Watco owns and operates 20 railroads on 3570 miles of main line
that is track warrant controlled (TWC) and Watco states that of those
railroads, 5 safely transport more hazmat than GDLK. GDLK conducts
ultrasonic rail and geometry testing twice per year over the entire
railroad. GDLK operates to the north of subject trackage from milepost
33 to milepost 102.3 a mix of TWC and yard limits (YL). There are two
manual interlockings on the north section of track using TWC as an
acceptable method of operation. TWC is the method of operation used by
all dispatched Watco railroads, including parts of the GDLK. Watco
states that the discontinuance of the TCS section and converting it to
TWC maintains the consistency of dispatching and standardization of
training for the GDLK, and will provide a higher level of safety
through simplified operations by having one method of controlled
operation rather than the two it has now. Watco further states that
this consistency and standardization of dispatching and training will
enhance the safety of GDLK operations.
A copy of the petition, as well as any written communications
concerning the petition, is available for review online at
www.regulatons.gov and in person at the U.S. Department of
Transportation's Docket Operations Facility, 1200 New Jersey Avenue
SE., W12-140, Washington, DC 20590. The Docket Operations Facility is
open from 9 a.m. to 5 p.m., Monday through Friday, except Federal
Holidays.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested parties
desire an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number and may be submitted by any of the following
methods:
Web site: https://www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 202-493-2251.
Mail: Docket Operations Facility, U.S. Department of
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC
20590.
Hand Delivery: 1200 New Jersey Avenue, SE., Room W12-140,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by September 11, 2017 will be considered by
FRA before final action is taken. Comments received after that date
will be considered as far as practicable.
Anyone can search the electronic form of any written communications
and comments received into any of our dockets by the name of the
individual submitting the comment (or signing the document, if
submitted on behalf of an association, business, labor union, etc.). In
accordance with 5 U.S.C. 553(c), DOT solicits comments from the public
to better inform its processes. DOT posts these comments, without edit,
including any personal information the commenter provides, to
www.regulations.gov, as described in the system of records notice (DOT/
ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/privacy. See also https://www.regulations.gov/privacyNotice for the
privacy notice of regulations.gov.
Robert C. Lauby,
Associate Administrator for Railroad Safety, Chief Safety Officer.
[FR Doc. 2017-15789 Filed 7-26-17; 8:45 am]
BILLING CODE 4910-06-P