Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 34992-34993 [2017-15754]
Download as PDF
34992
Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Michael Mahoney, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington DC
20555–0001; telephone 301–415–3857,
email: Michael.Mahoney@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
has granted the request of Duke Energy
Carolinas, LLC (the licensee) to
withdraw its application dated
December 15, 2016 (ADAMS Accession
No. ML16350A422), for proposed
amendments to Renewed Facility
Operating License No. NPF–35 and
NPF–52 for the Catawba Nuclear
Station, Unit Nos. 1 and 2, located in
York County, South Carolina.
The submittal dated December 15,
2016, proposed to adopt multiple
Technical Specifications Task Force
(TSTF) Travelers that would have
modified Technical Specification (TS)
3.4.12, ‘‘Low Temperature Overpressure
Protection (LTOP) System,’’ to increase
the time allowed for swapping charging
pumps to one hour. The portion related
to TSTF–285–A, Revision 1, ‘‘Charging
Pump Swap LTOP Allowance,’’ is being
withdrawn. The licensee’s application
was noticed previously in the Federal
Register on April 25, 2017 (82 FR
19099). The licensee provided a request
to withdraw the application by letter
dated on June 29, 2017 (ADAMS
Accession No. ML17180A154).
Dated at Rockville, Maryland, this 19th day
of July 2017.
For the Nuclear Regulatory Commission.
Michael Mahoney,
Project Manager, Plant Licensing Branch II–
1, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2017–15758 Filed 7–26–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
mstockstill on DSK30JT082PROD with NOTICES
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating Plant,
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
VerDate Sep<11>2014
19:17 Jul 26, 2017
Jkt 241001
The U.S. Nuclear Regulatory
Commission (NRC) has determined that
the inspections, tests, and analyses have
been successfully completed, and that
the specified acceptance criteria are met
for the Vogtle Electric Generating Plant
(VEGP), Units 3 and 4.
DATES: The determination of the
successful completion of inspections,
tests, and analyses for VEGP, Units 3
and 4 is effective July 27, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
has submitted inspections, tests,
analyses, and acceptance criteria
(ITAAC) closure notifications (ICNs)
under § 52.99(c)(1) of title 10 of the
Code of Federal Regulations (10 CFR),
informing the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP, Unit 3 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81),
2.2.01.06d.i (105), 2.2.03.09b (204),
2.3.05.02.ii (341), 2.5.02.07b (535),
and 3.2.00.01c.i (741)
VEGP, Unit 4 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81),
2.2.01.06d.i (105), 2.2.03.09b (204),
2.3.05.02.ii (341), 2.5.02.07b (535),
and 3.2.00.01c.i (741)
The ITAAC for VEGP, Unit 3 are in
Appendix C of the VEGP, Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP, Unit 4 are in Appendix C of
VEGP, Unit 4 combined license
(ADAMS Accession No. ML14100A135).
II. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs. Each ICN
presents a narrative description of how
the ITAAC was completed. The NRC’s
ICN review process involves a
determination on whether, among other
things: (1) each ICN provides sufficient
information, including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
E:\FR\FM\27JYN1.SGM
27JYN1
Federal Register / Vol. 82, No. 143 / Thursday, July 27, 2017 / Notices
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC will be reflected
on the NRC’s Web site at https://
www.nrc.gov/reactors/new-reactors/
oversight/itaac.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP, Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog4icnsr.pdf.
mstockstill on DSK30JT082PROD with NOTICES
Dated at Rockville, Maryland, this 18th day
of July 2017.
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–15754 Filed 7–26–17; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
19:17 Jul 26, 2017
Jkt 241001
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–454, 50–455, 50–456, 50–
457; NRC–2017–0167]
Exelon Generation Company, LLC;
Braidwood Station, Units 1 and 2, and
Byron Station, Unit Nos. 1 and 2
Nuclear Regulatory
Commission.
ACTION: 10 CFR 2.206 request; receipt.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is giving notice that
by petition dated February 8, 2017,
Barry Quigley (the petitioner) has
requested that the NRC take action with
regard to Braidwood Station, Units 1
and 2, and Byron Station, Unit Nos. 1
and 2. The petitioner’s requests are
included in the SUPPLEMENTARY
INFORMATION section of this document.
DATES: July 27, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2017–0167 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0167. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Joel
S. Wiebe, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
SUMMARY:
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
34993
0001; telephone: 301–415–6606, email:
Joel.Wiebe@nrc.gov.
SUPPLEMENTARY INFORMATION: On
February 8, 2017, the petitioner
requested that the NRC take action with
regard to Braidwood Station, Units 1
and 2, and Byron Station, Unit Nos. 1
and 2 (ADAMS Accession No.
ML17061A127). The petitioner
requested: (1) Issue a violation under
part 50 of title 10 of the Code of Federal
Regulations (10 CFR), appendix B,
Criterion III, Design Control for
deficiencies in the analysis of record
(AOR) for the main steam isolation
valve (MSIV) room pressurization
following a high energy line break
(HELB), (2) Issue a violation under 10
CFR part 50, appendix B, Criterion XVI,
Corrective Action, for failure to update
the AOR in a timely manner, (3) Require
Exelon (the licensee) to show that the
consequences of the secondary missiles
resulting from MSIV room
pressurization do not have adverse
consequences, (4) Issue a demand for
information under 10 CFR 2.204,
‘‘Demand for information,’’ to compare
and contrast the behavior of Exelon
management described in the petition
with the NRC’s policy statement on the
attributes of a safety-conscious work
environment, and (5) Use Exelon’s
response to number 4, above, on which
to determine whether to issue a
‘‘chilling effects’’ letter.
As the basis for this request, the
petitioner states that: (1) Break
enthalpies used in the MSIV room
pressurization AOR are actually the
thermodynamic internal energy of the
steam, not the enthalpy. Since in the
range of interest, the internal energy is
about 13 percent less than the enthalpy,
the energy flow to the areas of concern
is non-conservative. Steam flow from
secondary piping is neglected; (2)
Corrective actions to resolve an issue in
the AOR are long overdue (8 years) and
improperly tracked; (3) A proposed
revision to the AOR shows that the
MSIV room roof slabs will be ejected by
the high pressures in the MSIV rooms
becoming potential missiles; and (4)
Management dismissed information in
the Updated Final Safety Evaluation
Report (UFSAR) that supported the
concerns about the AOR as ‘‘excessive
detail’’ and directed personnel to
remove the information. Management
dismissed UFSAR internal
inconsistency related to the ‘‘Break
Exclusion Zone’’ without discussion or
review and stated that the information
supporting the concern could be deleted
as an UFSAR cleanup item. Recently,
there was an operability concern where
engineering management maintained a
E:\FR\FM\27JYN1.SGM
27JYN1
Agencies
[Federal Register Volume 82, Number 143 (Thursday, July 27, 2017)]
[Notices]
[Pages 34992-34993]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-15754]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc., Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has determined
that the inspections, tests, and analyses have been successfully
completed, and that the specified acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: The determination of the successful completion of inspections,
tests, and analyses for VEGP, Units 3 and 4 is effective July 27, 2017.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: Chandu.Patel@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee) has submitted inspections,
tests, analyses, and acceptance criteria (ITAAC) closure notifications
(ICNs) under Sec. 52.99(c)(1) of title 10 of the Code of Federal
Regulations (10 CFR), informing the NRC that the licensee has
successfully performed the required inspections, tests, and analyses,
and that the acceptance criteria are met for:
VEGP, Unit 3 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.2.01.06d.i (105), 2.2.03.09b
(204), 2.3.05.02.ii (341), 2.5.02.07b (535), and 3.2.00.01c.i (741)
VEGP, Unit 4 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.2.01.06d.i (105), 2.2.03.09b
(204), 2.3.05.02.ii (341), 2.5.02.07b (535), and 3.2.00.01c.i (741)
The ITAAC for VEGP, Unit 3 are in Appendix C of the VEGP, Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP,
Unit 4 are in Appendix C of VEGP, Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs. Each ICN presents a narrative
description of how the ITAAC was completed. The NRC's ICN review
process involves a determination on whether, among other things: (1)
each ICN provides sufficient information, including a summary of the
methodology used to perform the ITAAC, to demonstrate that the
inspections, tests, and analyses have been successfully completed; (2)
each ICN provides sufficient information to demonstrate that the
acceptance criteria of the ITAAC are met; and (3) any NRC inspections
for the ITAAC have been completed and any ITAAC findings associated
with that ITAAC have been closed.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including
[[Page 34993]]
withdrawing the NRC staff's determination on that ITAAC). The NRC
staff's determination will be used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end of construction that all
acceptance criteria in the combined license are met. The ITAAC closure
process is not finalized for these ITAAC until the NRC makes an
affirmative finding under 10 CFR 52.103(g). Any future updates to the
status of these ITAAC will be reflected on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP, Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 18th day of July 2017.
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of
New Reactors.
[FR Doc. 2017-15754 Filed 7-26-17; 8:45 am]