Combined Notice of Filings #2, 34654-34655 [2017-15645]
Download as PDF
34654
Federal Register / Vol. 82, No. 142 / Wednesday, July 26, 2017 / Notices
of the Federal Power Act (FPA) (16
U.S.C. 824c). Under section 204 of the
FPA no public utility or licensee shall
issue any security, or assume any
obligation or liability as guarantor,
endorser, surety, or otherwise in respect
of any security of another person, until
the public utility applies for and
receives Commission approval by order
authorizing the issue or assumption of
the liability. The Commission issues an
order if it finds that such issue or
assumption (a) is for lawful object,
within the corporate purposes of the
applicant and compatible with the
public interest, which is necessary or
appropriate for or consistent with the
proper performance by the applicant as
a public utility, and which will not
impair its ability to perform that service,
and (b) is reasonably necessary or
appropriate for such purposes.
The Commission uses the information
contained in filings to determine its
acceptance and/or rejection of
applications for authorization to either
issue securities or to assume an
obligation or liability by the public
utilities and their licensees who submit
these applications.
The specific application requirements
and filing format are found at 18 CFR
part 34; and 18 CFR 131.43 and 131.50.
This information is filed electronically.
Type of Respondents: Public utilities
subject to the Federal Power Act.
Estimate of Annual Burden 1: The
Commission estimates the reduction in
the annual public reporting burden for
the FERC–523, as follows:
FERC–523, APPLICATIONS FOR AUTHORIZATION FOR ISSUANCE OF SECURITIES OR ASSUMPTION OF LIABILITY
Number of
respondents 2
Annual
number of
responses per
respondent
Total number
of responses
Average
burden hours
and cost per
response 3
Total annual
burden hours
and total
annual cost
(1)
Information collection requirements
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
FERC–523 ...................................................................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–15646 Filed 7–25–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK30JT082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
1 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
VerDate Sep<11>2014
17:49 Jul 25, 2017
Jkt 241001
145
1
145
70
$5,355
10,150 $776,475
Docket Numbers: ER12–2205–010;
ER10–1821–015; ER12–2159–009;
ER12–919–008.
Applicants: Meadow Creek Project
Company LLC, Goshen Phase II LLC,
Canadian Hills Wind, LLC, Rockland
Wind Farm LLC.
Description: Notice of Change in
Status of Meadow Creek Project
Company LLC, et al.
Filed Date: 7/20/17.
Accession Number: 20170720–5130.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–814–001;
ER17–816–001; ER17–815–001; ER10–
2543–004; ER10–2606–012.
Applicants: Verso Energy Services
LLC, Verso Luke LLC, Verso Escanaba
LLC, Verso Androscoggin LLC,
Consolidated Water Power Company.
Description: Notice of Change in
Status of the Verso MBR Sellers.
Filed Date: 7/20/17.
Accession Number: 20170720–5077.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–1778–001.
Applicants: HD Project One LLC.
Description: Tariff Amendment:
MBRA Application Amendment to be
effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5040.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–2044–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3215R2 People’s Electric Cooperative
NITSA NOA to be effective 6/1/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5062.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–2114–000.
Applicants: The Dayton Power and
Light Company, Ohio Power Company,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Interconnection Agreement SA No. 1461
between Dayton and Ohio Power to be
effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5059.
Comments Due: 5 p.m. ET 8/10/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
collection burden, refer to 5 Code of Federal
Regulations 1320.3.
2 The number of respondents is derived from the
actual number of applications processed.
3 The Commission staff thinks that the average
respondent for this collection is similarly situated
to the Commission, in terms of salary plus benefits.
Based upon FERC’s 2017 annual average of
$158,754 (for salary plus benefits), the average
hourly cost is $76.50/hour.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
E:\FR\FM\26JYN1.SGM
26JYN1
Federal Register / Vol. 82, No. 142 / Wednesday, July 26, 2017 / Notices
Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–15645 Filed 7–25–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 18, 2017.
FOR FURTHER INFORMATION CONTACT:
Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
ENVIRONMENTAL PROTECTION
AGENCY
[FR Doc. 2017–15648 Filed 7–25–17; 8:45 am]
[Docket No. OR17–17–000]
ENVIRONMENTAL PROTECTION
AGENCY
Paula V. Painter at 404/562–8887.
Dated: July 11, 2017.
Anita L. Davis,
Chief, Enforcement and Community
Engagement Branch, Superfund Division.
[FR Doc. 2017–15720 Filed 7–25–17; 8:45 am]
BILLING CODE 6560–50–P
[EPA–R09–SFUND–2017–03; FRL–9965–32–
Region 9]
BILLING CODE 6717–01–P
Belle Fourche Pipeline Company,
Bridger Pipeline LLC; Notice of
Petition for Declaratory Order
mstockstill on DSK30JT082PROD with NOTICES
34655
Take notice that on July 18, 2017,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2016),
Belle Fourche Pipeline Company (Belle
Fourche) and Bridger Pipeline LLC
(Bridger), filed a petition seeking a
declaratory order approving the overall
tariff and rate structure set forth in the
transportation service agreement
governing the transportation of crude oil
on Belle Fourche and Bridger’s pipeline
systems, as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate Sep<11>2014
17:49 Jul 25, 2017
Jkt 241001
[CERCLA–04–2017–3757; FRL 9965–49–
Region 4]
Coronet Industries, Inc.: Plant City,
Hillsborough County, Florida, Notice of
Settlement
Environmental Protection
Agency (EPA).
ACTION: Notice of settlement.
AGENCY:
Under 122(h) of the
Comprehensive Environmental
Response, Compensation and Liability
Act (CERCLA), the United States
Environmental Protection Agency has
entered into a settlement with CEMEX
Construction Materials Florida, LLC,
and Hexion Inc. concerning the Coronet
Industries Site located in Plant City,
Hillsborough County, Florida. The
settlement addresses recovery of
CERCLA costs for response actions
performed by the EPA at the Site.
DATES: The Agency will consider public
comments on the settlement until
August 25, 2017. The Agency will
consider all comments received and
may modify or withdraw its consent to
the settlement if comments received
disclose facts or considerations which
indicate that the proposed settlement is
inappropriate, improper, or inadequate.
ADDRESSES: Copies of the settlement are
available from the Agency by contacting
Ms. Paula V. Painter, Program Analyst,
using the contact information provided
in this notice. Comments may also be
submitted by referencing the Site’s
name through one of the following
methods:
• Internet: https://www.epa.gov/
aboutepa/about-epa-region-4southeast#r4-public-notices.
• U.S. Mail: U.S. Environmental
Protection Agency, Superfund Division,
Attn: Paula V. Painter, 61 Forsyth Street
SW., Atlanta, Georgia 30303.
• Email: Painter.Paula@epa.gov.
SUMMARY:
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Sycamore Removal Site, Hollywood,
CA; Notice of Proposed Settlement
Agreement and Order on Consent
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed settlement.
AGENCY:
This notice announces the
availability for review and comment of
a proposed administrative settlement
agreement under the Comprehensive
Environmental Response,
Compensation, and Liability Act of
1980, as amended (‘‘CERCLA’’), between
the U.S. Environmental Protection
Agency (‘‘EPA’’), and 953 N Sycamore
(LA), LLC (‘‘Sycamore LLC’’), regarding
the Sycamore Superfund Removal Site
in Hollywood, California. The
Settlement Agreement requires the
purchaser to conduct a removal action
to address soil and soil gas
contamination at the Sycamore Site.
DATES: Comments must be received on
or before August 25, 2017.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–R09–
SFUND–2017–03, to the Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Once submitted, comments cannot be
edited or withdrawn. The EPA may
publish any comment received to its
public docket. Do not submit
electronically any information you
consider to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Multimedia submissions (audio, video,
etc.) must be accompanied by a written
comment. The written comment is
considered the official comment and
should include discussion of all points
you wish to make. The EPA will
generally not consider comments or
comment contents located outside of the
primary submission (i.e. on the web,
cloud, or other file sharing system). For
additional submission methods, the full
EPA public comment policy,
information about CBI or multimedia
SUMMARY:
E:\FR\FM\26JYN1.SGM
26JYN1
Agencies
[Federal Register Volume 82, Number 142 (Wednesday, July 26, 2017)]
[Notices]
[Pages 34654-34655]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-15645]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-2205-010; ER10-1821-015; ER12-2159-009; ER12-
919-008.
Applicants: Meadow Creek Project Company LLC, Goshen Phase II LLC,
Canadian Hills Wind, LLC, Rockland Wind Farm LLC.
Description: Notice of Change in Status of Meadow Creek Project
Company LLC, et al.
Filed Date: 7/20/17.
Accession Number: 20170720-5130.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17-814-001; ER17-816-001; ER17-815-001; ER10-
2543-004; ER10-2606-012.
Applicants: Verso Energy Services LLC, Verso Luke LLC, Verso
Escanaba LLC, Verso Androscoggin LLC, Consolidated Water Power Company.
Description: Notice of Change in Status of the Verso MBR Sellers.
Filed Date: 7/20/17.
Accession Number: 20170720-5077.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17-1778-001.
Applicants: HD Project One LLC.
Description: Tariff Amendment: MBRA Application Amendment to be
effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720-5040.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17-2044-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 3215R2 People's Electric Cooperative
NITSA NOA to be effective 6/1/2017.
Filed Date: 7/20/17.
Accession Number: 20170720-5062.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17-2114-000.
Applicants: The Dayton Power and Light Company, Ohio Power Company,
PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Interconnection Agreement SA
No. 1461 between Dayton and Ohio Power to be effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720-5059.
Comments Due: 5 p.m. ET 8/10/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/
[[Page 34655]]
docs-filing/efiling/filing-req.pdf. For other information, call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-15645 Filed 7-25-17; 8:45 am]
BILLING CODE 6717-01-P