Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 32875-32890 [2017-14743]
Download as PDF
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
DEPARTMENT OF LABOR
Veterans’ Employment and Training
Service
Proposed Information Collection
Request; Federal Contractor Veterans’
Employment Report VETS–4212
Veterans’ Employment and
Training Service (VETS), Labor.
ACTION: Notice.
AGENCY:
The Veterans’ Employment
and Training Service (VETS) is
announcing an opportunity for public
comment on a proposed collection of
information by the agency. Under the
Paperwork Reduction Act (PRA) of
1995, Federal agencies are required to
publish notice in the Federal Register
concerning each proposed collection of
information and to allow 60 days for
public comment in response to the
notice. In this notice, VETS is soliciting
comments concerning the proposed
information collection request for the
VETS Federal Contractor Veterans’
Employment Report VETS–4212.
DATES: Comments must be submitted by
September 18, 2017.
ADDRESSES: Follow the instructions for
submitting comments.
D Email: 4212-FRN-2017-VETS@
dol.gov. Include ‘‘VETS–4212 Form’’ in
the subject line of the message.
D Fax: (202) 693–4755. Please send
comments by fax only if they are 10
pages or less.
D Mail: Kenan Torrans, Deputy
Director, Compliance and
Investigations, VETS, U.S. Department
of Labor, Room S–1212, 200
Constitution Avenue NW., Washington,
DC 20210.
D Receipt of submissions, whether by
U.S. Mail, email, or FAX transmittal,
will not be acknowledged; however, the
sender may request confirmation that a
submission has been received by
telephoning VETS at (202) 693–4731
(VOICE) (this is not a toll-free number)
or (202) 693–4760 (TTY/TDD).
All comments received, including any
personal information provided, will be
available for public inspection during
normal business hours at the above
address. People needing assistance to
review comments will be provided with
appropriate aids such as readers or print
magnifiers.
FOR FURTHER INFORMATION CONTACT:
Kenan Torrans, Deputy Director,
Compliance and Investigations, VETS,
U.S. Department of Labor, Room S–
1212, 200 Constitution Avenue NW.,
Washington, DC 20210, or by email at:
4212-FRN-2017-VETS@dol.gov.
SUPPLEMENTARY INFORMATION:
sradovich on DSK3GMQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
I. Background: The Vietnam Era
Veterans’ Readjustment Assistance Act
of 1974 (‘‘VEVRAA’’), 38 U.S.C. 4212(d),
requires Federal contractors and
subcontractors subject to the Act’s
affirmative action provisions in 38
U.S.C. 4212(a) to track and report
annually to the Secretary of Labor the
number of employees in their
workforces, by job category and hiring
location, who belong to the specified
categories of protected veterans. VETS
maintains regulations to implement the
reporting requirements under VEVRAA
and uses the VETS–4212 form for
providing the required information on
the employment of covered veterans.
The regulations in 41 CFR part 61–
300 require contractors and
subcontractors with a covered Federal
contract entered into or modified in the
amount of $150,000 or more to use the
Federal Contractor Veterans’
Employment Report VETS–4212 form
for reporting information on their
employment of covered veterans under
VEVRAA.
The VETS–4212 Report is currently
approved under OMB No. 1293–0005.
II. Desired Focus of Comments: VETS
is soliciting comments concerning a
request to extend the currently
approved information collection
request. The Department of Labor is
particularly interested in comments
which:
D Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility;
D Evaluate the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
D Enhance the quality, utility and
clarity of the information to be
collected; and
D Minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology
e.g., permitting electronic submissions
of responses.
III. Current Actions: This notice
requests an extension of the current
Office of Management and Budget
approval of the paperwork requirements
for the VETS–4212 Form.
Type of Review: Extension with
change due to a reduction in burden
hours.
Agency: Veterans’ Employment and
Training Service.
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
32875
Title: Federal Contractor Veterans’
Employment Report VETS–4212.
OMB Number: 1293–0005.
Affected Public: Private Sector—
businesses or other for profits and notfor-profit institutions.
Total Respondents: 21,000.
Average responses per respondent: 18.
Total Annual Responses: 378,000.
Average Time per Response:
D Electronic Submission—20 minutes.
D Paper Submission—40 minutes.
Total Burden Hours: 129,200.
Frequency: Annually.
Total Burden Cost (capital/startup):
$0.
Total Burden Cost (operating/
maintaining): $0.
Comments submitted in response to
this notice will be summarized and
included in the request for Office of
Management and Budget approval of the
information collection request; they will
also become a matter of public record.
Signed in Washington, DC, this 6th day of
July 2017.
J.S. Shellenberger,
Deputy Assistant Secretary of Labor for
Veterans’ Employment and Training Service.
[FR Doc. 2017–15036 Filed 7–17–17; 8:45 am]
BILLING CODE 4510–79–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2017–0158]
Biweekly Notice; Applications and
Amendments to Facility Operating
Licenses and Combined Licenses
Involving No Significant Hazards
Considerations
Nuclear Regulatory
Commission.
ACTION: Biweekly notice.
AGENCY:
Pursuant to Section 189a.(2)
of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear
Regulatory Commission (NRC) is
publishing this regular biweekly notice.
The Act requires the Commission to
publish notice of any amendments
issued, or proposed to be issued, and
grants the Commission the authority to
issue and make immediately effective
any amendment to an operating license
or combined license, as applicable,
upon a determination by the
Commission that such amendment
involves no significant hazards
consideration, notwithstanding the
pendency before the Commission of a
request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued, from June 20,
SUMMARY:
E:\FR\FM\18JYN1.SGM
18JYN1
32876
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
2017 to July 3, 2017. The last biweekly
notice was published on July 5, 2017.
DATES: Comments must be filed by
August 17, 2017. A request for a hearing
must be filed by September 18, 2017.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0158. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
TWFN–8–D36M, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
1927, email: lynn.ronewicz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
sradovich on DSK3GMQ082PROD with NOTICES
A. Obtaining Information
Please refer to Docket ID NRC–2017–
0158, facility name, unit number(s),
plant docket number, application date,
and subject, when contacting the NRC
about the availability of information for
this action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0158.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2017–
0158, facility name, unit number(s),
plant docket number, application date,
and subject, in your comment
submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses and
Proposed No Significant Hazards
Consideration Determination
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92 of title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated, or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period if circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility. If
the Commission takes action prior to the
expiration of either the comment period
or the notice period, it will publish in
the Federal Register a notice of
issuance. If the Commission makes a
final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s Web site at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
E:\FR\FM\18JYN1.SGM
18JYN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or federally
recognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
32877
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562, August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the
NRC’s Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public Web site at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
E:\FR\FM\18JYN1.SGM
18JYN1
sradovich on DSK3GMQ082PROD with NOTICES
32878
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to
these license amendment applications,
see the application for amendment
which is available for public inspection
in ADAMS and at the NRC’s PDR. For
additional direction on accessing
information related to this document,
see the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Arizona Public Service Company, et al.,
Docket Nos. STN 50–528, STN 50–529,
and STN 50–530, Palo Verde Nuclear
Generating Station, Units 1, 2, and 3
(PVNGS), Maricopa County, Arizona
Date of amendment request: June 14,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17165A555.
Description of amendment request:
The amendments would modify the
completion date for implementation of
Milestone 8 of the Cyber Security Plan
(CSP). The proposed amendments
would extend the CSP Milestone 8
completion date from September 30,
2017, to December 31, 2017.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change to the PVNGS Cyber
Security Plan implementation schedule is
administrative in nature. This proposed
change does not alter accident analysis
assumptions, add any initiators, or affect the
function of plant systems or the manner in
which systems are operated, maintained,
modified, tested, or inspected. The proposed
change does not require any plant
modifications which affect the performance
capability of the structures, systems, and
components (SSCs) relied upon to mitigate
the consequences of postulated accidents,
and has no impact on the probability or
consequences of an accident previously
evaluated.
Therefore, the proposed change will not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change to the PVNGS Cyber
Security Plan implementation schedule is
administrative in nature. This proposed
change does not alter accident analysis
assumptions, add any initiators, or affect the
function of plant systems or the manner in
which systems are operated, maintained,
modified, tested, or inspected. The proposed
change does not require any plant
modifications which affect the performance
capability of the SSCs relied upon to mitigate
the consequences of postulated accidents,
and does not create the possibility of a new
or different kind of accident from any
accident previously evaluated.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
Plant safety margins are established
through limiting conditions for operation,
limiting safety systems settings, and safety
limits specified in the [T]echnical
[S]pecifications [TSs]. The proposed change
to the PVNGS Cyber Security Plan
implementation schedule is administrative in
nature. Since the proposed change is
administrative in nature, there are no
changes to these established safety margins.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety as defined in the basis for any TS.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
E:\FR\FM\18JYN1.SGM
18JYN1
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
proposes to determine that the request
for amendments involves no significant
hazards consideration.
Attorney for licensee: Michael G.
Green, Senior Regulatory Counsel,
Pinnacle West Capital Corporation, P.O.
Box 52034, Mail Station 8695, Phoenix,
AZ 85072–2034.
NRC Branch Chief: Robert J.
Pascarelli.
sradovich on DSK3GMQ082PROD with NOTICES
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station, Units 1, 2, and
3, Oconee County, South Carolina
Date of amendment request: March
30, 2017, as supplemented by letter
dated May 11, 2017. Publicly-available
versions are in ADAMS under
Accession Nos. ML17095A530 and
ML17139D352, respectively.
Description of amendment request:
The amendments would revise the
Technical Specifications (TSs) in
accordance with the NRC-approved
Technical Specifications Task Force
(TSTF) Standard Technical
Specification Change Traveler TSTF–
448, Revision 3, ‘‘Control Room
Habitability,’’ with variations from the
TSTF to account for plant-specific
configuration and licensing basis
differences. The amendments would
modify the TSs for the control room
ventilation system (CRVS) booster fans
and would establish a control room
envelop (CRE) habitability program in
TS 5.5, ‘‘Programs and Manuals.’’ The
NRC staff issued ‘‘Notice of Availability
of Technical Specification Improvement
to Modify Requirements Regarding
Control Room Envelope Habitability
Using the Consolidated Line Item
Improvement Process,’’ associated with
TSTF–448, Revision 3, in the Federal
Register on January 17, 2007 (72 FR
2022). The notice included a model
safety evaluation, a model no significant
hazards consideration determination,
and a model license amendment
request. In its application dated March
30, 2017, as supplemented by letter
dated May 11, 2017, the licensee
affirmed the applicability of the model
no significant hazards consideration
determination, which is presented in
the following section.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee affirmed the applicability of the
model no significant hazards
consideration, which is presented
below:
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
Criterion 1—The Proposed Change Does Not
Involve a Significant Increase in the
Probability or Consequences of an Accident
Previously Evaluated
The proposed change does not adversely
affect accident initiators or precursors nor
alter the design assumptions, conditions, or
configuration of the facility. The proposed
change does not alter or prevent the ability
of structures, systems, and components
(SSCs) to perform their intended function to
mitigate the consequences of an initiating
event within the assumed acceptance limits.
The proposed change revises the TS for the
[CRVS], which is a mitigation system
designed to minimize unfiltered air leakage
into the CRE and to filter the CRE atmosphere
to protect the CRE occupants in the event of
accidents previously analyzed. An important
part of the [CRVS] is the CRE boundary. The
[CRVS] is not an initiator or precursor to any
accident previously evaluated. Therefore, the
probability of any accident previously
evaluated is not increased. Performing tests
to verify the operability of the CRE boundary
and implementing a program to assess and
maintain CRE habitability ensure that the
[CRVS] is capable of adequately mitigating
radiological consequences to CRE occupants
during accident conditions, and that the
[CRVS] will perform as assumed in the
consequence analyses of design basis
accidents. Thus, the consequences of any
accident previously evaluated are not
increased.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
Criterion 2—The Proposed Change Does Not
Create the Possibility of a New or Different
Kind of Accident From Any Accident
Previously Evaluated
The proposed change does not impact the
accident analysis. The proposed change does
not alter the required mitigation capability of
the [CRVS], or its functioning during
accident conditions as assumed in the
licensing basis analyses of design basis
accident radiological consequences to CRE
occupants. No new or different accidents
result from performing the new surveillance
or following the new program. The proposed
change does not involve a physical alteration
of the plant (i.e., no new or different type of
equipment will be installed) or a significant
change in the methods governing normal
plant operation. The proposed change does
not alter any safety analysis assumptions and
is consistent with current plant operating
practice.
Therefore, this change does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated.
Criterion 3—The Proposed Change Does Not
Involve a Significant Reduction in the Margin
of Safety
The proposed change does not alter the
manner in which safety limits, limiting safety
system settings or limiting conditions for
operation are determined. The proposed
change does not affect safety analysis
acceptance criteria. The proposed change
will not result in plant operation in a
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
32879
configuration outside the design basis for an
unacceptable period of time without
compensatory measures. The proposed
change does not adversely affect systems that
respond to safely shut down the plant and to
maintain the plant in a safe shutdown
condition.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Vice President Nuclear & EHS Legal
Support, Duke Energy Corporation, 526
South Church Street—EC07H, Charlotte,
NC 28202–1802.
NRC Branch Chief: Michael T.
Markley.
Entergy Nuclear Operations, Inc. (ENO),
Docket No. 50–271, Vermont Yankee
Nuclear Power Station, Vernon,
Vermont
Date of amendment request: May 15,
2017. A publicly-available version is in
ADAMS under Package Accession No.
ML17139D261.
Description of amendment request:
The proposed amendment would
replace the Permanently Defueled
Emergency Plan and its associated
Permanently Defueled Emergency
Action Level (EAL) Technical Bases
Document with the Independent Spent
Fuel Storage Installation (ISFSI)
Emergency Plan and its associated ISFSI
EAL Technical Bases Document, for the
Vermont Yankee Nuclear Power Station
(VY). The proposed changes would
reflect the complete removal of all fuel
from the spent fuel pool (SFP) and
permit specific reductions in the size
and makeup of the Emergency Response
Organization due to the elimination of
the design-basis accident related to the
spent fuel (fuel handling accident). As
described in the Post Shutdown
Decommissioning Activities Report,
spent fuel will remain in the SFP until
it meets the criteria for transfer, the
existing ISFSI is expanded, and the
spent fuel can be safely transferred in an
efficient manner to the expanded ISFSI,
an activity that is currently scheduled
for completion in late 2018.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
E:\FR\FM\18JYN1.SGM
18JYN1
sradovich on DSK3GMQ082PROD with NOTICES
32880
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment would modify
the VY facility operating license by revising
the emergency plan and EAL scheme. VY has
permanently ceased power operations and is
permanently defueled. The proposed
amendment is conditioned on all spent
nuclear fuel being removed from wet storage
in the SFP and placed in dry storage within
the ISFSI. Occurrence of postulated accidents
associated with spent fuel stored in a SFP is
no longer credible in a SFP devoid of fuel.
The proposed amendment has no effect on
plant structures, systems, or components
(SSC) and therefore can neither affect the
capability of any plant SSC to perform its
design function nor increase the likelihood of
the malfunction of any plant SSC. The
proposed amendment would have no effect
on any of the previously evaluated accidents
in the VY Defueled Safety Analysis Report or
the Holtec HI–STORM 100 Final Safety
Analysis Report.
Because VY has permanently ceased power
operations, the generation of fission products
has largely ceased and the remaining source
term continues to decay. This source term
decay continues to significantly reduce the
consequences of previously evaluated
postulated accidents. Furthermore,
previously generated source term materials
such as reactor water cleanup resins have
been removed from the site in accordance
with applicable regulations and permitting
requirements.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendment constitutes a
revision of the emergency planning function
commensurate with the ongoing and
anticipated reduction in radiological source
term at VY.
The proposed amendment does not involve
a physical alteration of the plant. No new or
different types of equipment will be installed
and there are no physical modifications to
existing equipment as a result of the
proposed amendment. Similarly, the
proposed amendment would not physically
change any SSC involved in the mitigation of
any postulated accidents. Thus, no new
initiators or precursors of a new or different
kind of accident are created. Furthermore,
the proposed amendment does not create the
possibility of a new failure mode associated
with any equipment or personnel failures.
The credible events for the ISFSI remain
unchanged.
Therefore, the proposed amendments do
not create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
Because the 10 CFR part 50 license for VY
no longer authorizes operation of the reactor
or emplacement or retention of fuel into the
reactor vessel, as specified in 10 CFR
50.82(a)(2), the postulated accidents
associated with reactor operation are no
longer credible. In addition, with all spent
nuclear fuel transferred out of wet storage
from the SFP and placed in dry storage
within the ISFSI, a fuel handling accident is
no longer credible during dry storage of spent
nuclear fuel. Therefore, there are no credible
events that would result in radiological
releases beyond the site boundary exceeding
the exposure levels in U.S. EPA’s ‘‘Protective
Action Guide and Planning Guidance for
Radiological Incidents,’’ dated January 2017.
The proposed amendment does not involve
a change in the plant’s design, configuration,
or operation. The proposed amendment does
not affect either the way in which the plant
SSCs perform their safety function or their
design margins. Because there is no change
to the physical design of the facility, there is
no change to these margins.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Susan
Raimo, Senior Counsel, Entergy
Services, Inc., 101 Constitution Ave.
NW., Suite 200 East, Washington, DC
20001.
NRC Branch Chief: Bruce Watson.
Entergy Nuclear Operations, Inc.,
Docket Nos. 50–003, 50–247, and 50–
286, Indian Point Nuclear Generating
Unit Nos. 1, 2, and 3, Westchester
County, New York
Date of amendment request: April 28,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17129A612.
Description of amendment request:
The amendments would modify the
completion date for implementation of
Milestone 8 of the Cyber Security Plan
(CSP). The proposed amendments
would extend the CSP Milestone 8 full
implementation date from December 31,
2017, to December 31, 2022.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
Response: No.
The proposed change to the CSP
Implementation Schedule does not alter
accident analysis assumptions, add any
initiators, or affect the function of plant
systems or the manner in which systems are
operated, maintained, modified, tested, or
inspected. The proposed change does not
require any plant modifications which affect
the performance capability of the structures,
systems, and components relied upon to
mitigate the consequences of postulated
accidents and has no impact on the
probability or consequences of an accident
previously evaluated.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change to the CSP
Implementation Schedule does not alter
accident analysis assumptions, add any
initiators, or affect the function of plant
systems or the manner in which systems are
operated, maintained, modified, tested, or
inspected. The proposed change does not
require any plant modifications which affect
the performance capability of the structures,
systems, and components relied upon to
mitigate the consequences of postulated
accidents and does not create the possibility
of a new or different kind of accident from
any accident previously evaluated.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
Plant safety margins are established
through limiting conditions for operation,
limiting safety system settings, and safety
limits specified in the technical
specifications. The proposed change to the
CSP Implementation Schedule does not
involve these items. In addition, the
milestone date delay for full implementation
of the CSP has no substantive impact because
other measures have been taken which
provide adequate protection during this
period of time. Because there is no change to
established safety margins as a result of this
change, the proposed change does not
involve a significant reduction in a margin of
safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jeanne Cho,
Assistant General Counsel, Entergy
E:\FR\FM\18JYN1.SGM
18JYN1
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
Nuclear Operations, Inc., 440 Hamilton
Avenue, White Plains, NY 10601.
NRC Branch Chief: James G. Danna.
sradovich on DSK3GMQ082PROD with NOTICES
Entergy Nuclear Operations, Inc.,
Docket No. 50–247, Indian Point
Nuclear Generating Unit No. 2,
Westchester County, New York
Date of amendment request: April 7,
2017. A publicly-available version is in
ADAMS under Package Accession No.
ML17104A039.
Description of amendment request:
The amendment would revise Technical
Specification 3.5.4, ‘‘Refueling Water
Storage Tank (RWST),’’ such that the
non-seismically qualified piping of the
Boric Acid Recovery System be
connected to the RWST seismic piping.
This change will only be applicable
until the end of the Indian Point
Nuclear Generating Unit No. 2 Refueling
Outage 2R23.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The use of the non-seismic Boric Acid
Recovery System (BARS) to recirculate and
filter the RWST water does not involve any
changes or create any new interfaces with the
reactor coolant system or main steam system
piping. Therefore, the connection of the
BARS Purification Loop to the RWST would
not affect the probability of these accidents
occurring. The BARS is not credited for safe
shutdown of the plant or accident mitigation.
Administrative controls ensure that the
BARS can be isolated as necessary and in
sufficient time to assure that the RWST
volume will be adequate to perform the
safety function as designed. Since the RWST
will continue to perform its safety function
and overall system performance is not
affected, the consequences of the accident are
not increased.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The design of the RWST and the SFP
[Spent Fuel Pool] Purification Loop has been
revised to allow recirculation and
purification using the BARS for a short
period of time (not to exceed 30 days per fuel
cycle) for the next fuel cycle. The BARS takes
RWST water in and processes it out without
additional connections that could affect other
systems and without an impact from its
installation. Procedures for the operation of
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
the plant, including the BARS, will not create
the possibility of a new or different type of
accident. Contingent upon manual operator
action, a BARS line break will not result in
a loss of the RWST safety function. Similarly,
an active or passive failure in the BARS will
not affect safety related structures, systems or
components.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The SFP Purification Loop and
recirculation and purification of the RWST
water using the BARS is not credited for safe
shutdown of the plant or accident mitigation.
RWST volume will be maximized prior to
purification and timely operator action can
be taken to isolate the non-seismic system
from the RWST to assure it can perform its
function. This will result in no significant
reduction in the margin of safety.
Therefore the proposed change does not
significantly reduce the margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jeanne Cho,
Assistant General Counsel, Entergy
Nuclear Operations, Inc., 440 Hamilton
Avenue, White Plains, NY 10601.
NRC Branch Chief: James G. Danna.
FirstEnergy Nuclear Operating
Company, et al., Docket Nos. 50–334
and 50–412, Beaver Valley Power
Station (BVPS), Unit Nos. 1 and 2,
Beaver County, Pennsylvania
Date of amendment request: April 9,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17100A269.
Description of amendment request:
The amendments would revise
Technical Specification (TS) Section
4.2.1, ‘‘Fuel Assemblies,’’ and Section
5.6.3, ‘‘Core Operating Limits Report
(COLR),’’ to allow the use of Optimized
ZIRLOTM as an approved fuel rod
cladding material. In the letter dated
April 9, 2017, the licensee also
requested an exemption from certain
requirements of 10 CFR 50.46 and 10
CFR part 50, appendix K, in accordance
with 10 CFR 50.12, to support the
license amendments.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
PO 00000
Frm 00097
Fmt 4703
Sfmt 4703
32881
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment would allow the
use of Optimized ZIRLOTM clad nuclear fuel
at BVPS. The NRC approved topical report
WCAP–12610–P–A & CENPD–404–P–A,
Addendum 1–A, ‘‘Optimized ZIRLOTM,’’
prepared by Westinghouse Electric Company
LLC (Westinghouse), which addresses
Optimized ZIRLOTM fuel rod cladding and
demonstrates that Optimized ZIRLOTM fuel
rod cladding has essentially the same
properties as currently licensed ZIRLO® fuel
rod cladding. The use of Optimized ZIRLOTM
fuel rod cladding material will not result in
adverse changes to the operation or
configuration of the facility. The fuel
cladding itself is not an accident initiator and
does not affect accident probability. The
correction of a typographical error, the
addition of a word for clarification of the TS,
and the addition of a registered trademark
designator are administration changes and do
not affect the fuel cladding design. Use of
Optimized ZIRLOTM meets the fuel design
acceptance criteria and hence does not
significantly affect the consequences of an
accident.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The use of Optimized ZIRLOTM fuel rod
cladding material will not result in adverse
changes to the operation or configuration of
the facility. The correction of a typographical
error, the addition of a word for clarification
of the TS, and the addition of a registered
trademark designator are administration
changes and do not affect the fuel cladding
design. Topical Report WCAP–12610–P–A &
CENPD–404–P–A, Addendum 1–A
demonstrated that the material properties of
Optimized ZIRLOTM fuel rod cladding are
similar to those of ZIRLO® fuel rod cladding.
Therefore, Optimized ZIRLOTM fuel rod
cladding will perform similarly to ZIRLO®
fuel rod cladding, thus precluding the
possibility of the fuel rod cladding becoming
an accident initiator and causing a new or
different kind of accident.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed amendment will not involve
a significant reduction in the margin of
safety. NRC-approved Topical Report WCAP–
12610–P–A & CENPD–404–P–A, Addendum
1–A, demonstrated that the material
properties of the Optimized ZIRLOTM fuel
rod cladding are similar to those of ZIRLO®
fuel rod cladding. Optimized ZIRLOTM fuel
rod cladding is expected to perform similarly
to ZIRLO® fuel rod cladding for normal
E:\FR\FM\18JYN1.SGM
18JYN1
32882
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
South Carolina Electric & Gas Company,
Docket Nos. 52–027 and 52–028, Virgil
C. Summer Nuclear Station, Units 2 and
3, Fairfield County, South Carolina
Date of amendment request: June 12,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17164A191.
Description of amendment request:
The requested amendments propose
changes to the Updated Final Safety
Analysis Report in the form of
departures from the plant-specific
Design Control Document (DCD) Tier 2
information, and involve changes to
related plant-specific DCD Tier 1
information, with corresponding
changes to the associated combined
license (COL) Appendix C information.
In addition, revisions are proposed to
COL Appendix A, Technical
Specifications. The proposed changes
revise the COLs concerning
standardizing the Protection and Safety
Monitoring System (PMS) setpoint
nomenclature. No changes are proposed
to setpoint values or PMS alarms and
actuations. Pursuant to the provisions of
10 CFR 52.63(b)(1), an exemption from
elements of the design as certified in the
10 CFR part 52, appendix D, Design
Certification Rule, is also requested for
the plant-specific Tier 1 departures.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
consequences of an accident previously
evaluated?
Response: No.
No setpoint values or PMS actuations are
proposed to be changed by this activity. Nor
are any values assumed in the safety analysis
changed. This is an administrative change to
standardize the PMS setpoint designators.
The proposed amendment does not affect the
prevention and mitigation of abnormal
events, e.g., accidents, anticipated operation
occurrences, earthquakes, floods, turbine
missiles, and fires or their safety or design
analyses. This change does not involve
containment of radioactive isotopes or any
adverse effect on a fission product barrier.
There is no impact on previously evaluated
accidents.
These proposed changes have no adverse
impact on the support, design, or operation
of mechanical and fluid systems. The
response of systems to postulated accident
conditions is not adversely affected and
remains within response time assumed in the
accident analysis. There is no change to the
predicted radioactive releases due to normal
operation or postulated accident conditions.
Consequently, the plant response to
previously evaluated accidents or external
events is not adversely affected, nor does the
proposed change create any new accident
precursors.
Therefore, the requested amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes do not involve a
new failure mechanism or malfunction,
which affects [a structure, system,
component (SSC)] accident initiator, or
interface with any SSC accident initiator or
initiating sequence of events considered in
the design and licensing bases. There is no
adverse effect on radioisotope barriers or the
release of radioactive materials. The
proposed amendment does not adversely
affect any accident, including the possibility
of creating a new or different kind of accident
from any accident previously evaluated.
Therefore, the proposed changes do not
create the possibility of a new or different
type of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
No setpoint values or PMS actuations are
proposed to be changed by this activity. This
is an administrative change to standardize
the PMS setpoint designators. The proposed
changes would not affect any safety-related
design code, function, design analysis, safety
analysis input or result, or existing design/
safety margin. No safety analysis or design
basis acceptance limit/criterion is challenged
or exceeded by the requested changes.
Therefore the proposed amendment does
not involve a significant reduction in a
margin of safety.
1. Does the proposed amendment involve
a significant increase in the probability or
The NRC staff has reviewed the
licensee’s analysis and, based on this
operating and accident scenarios, including
both loss-of-coolant accident (LOCA) and
non-LOCA scenarios. The use of Optimized
ZIRLOTM fuel rod cladding will not result in
adverse changes to the operation or
configuration of the facility. The correction of
a typographical error, the addition of a word
for clarification of the TS, and the addition
of a registered trademark designator are
administration changes that do not affect the
fuel cladding design.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
sradovich on DSK3GMQ082PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: David W.
Jenkins, FirstEnergy Nuclear Operating
Company, FirstEnergy Corporation, 76
South Main Street, Akron, OH 44308.
NRC Branch Chief: James G. Danna.
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius LLC,
1111 Pennsylvania Avenue NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Jennifer DixonHerrity.
South Carolina Electric & Gas Company,
Docket Nos. 52–027 and 52–028, Virgil
C. Summer Nuclear Station, Units 2 and
3, Fairfield County, Georgia
Date of amendment request: June 9,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17163A174.
Description of amendment request:
The requested amendments propose
changes to combined license (COL)
Appendix C (and plant-specific Tier 1)
Table 2.7.2–2 to revise the minimum
chilled water flow rates to the supply air
handling units serving the Main Control
Room and the Class 1E electrical rooms,
and the unit coolers serving the normal
residual heat removal system and
chemical and volume control system
pump rooms. The proposed COL
Appendix C (and plant-specific Design
Control Document (DCD) Tier 1)
changes require additional changes to
corresponding Tier 2 component data
information in Updated Final Safety
Analysis Report Chapters 6 and 9.
Because this proposed change requires a
departure from Tier 1 information in the
Westinghouse Electric Company’s
AP1000 DCD, the licensee also
requested an exemption from the
requirements of the Generic DCD Tier 1
in accordance with 10 CFR 52.63(b)(1).
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes to COL Appendix C
(and plant-specific Tier 1) Table 2.7.2–2,
Updated Final Safety Analysis Report
(UFSAR) Table 9.2.7–1, and associated
UFSAR design information to identify the
revised equipment parameters for the nuclear
island nonradioactive ventilation system
(VBS) air handling units (AHUs) and
radiologically controlled area (RCA)
ventilation system (VAS) unit coolers and
reduced chilled water system (VWS) cooling
coil flow rates does not adversely impact the
E:\FR\FM\18JYN1.SGM
18JYN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
plant response to any accidents which are
previously evaluated. The function of the
cooling coils to provide chilled water to the
VBS AHUs and VAS unit coolers is not
credited in the safety analysis.
No safety-related structure, system,
component (SSC) or function is adversely
affected by this change. The change does not
involve an interface with any SSC accident
initiator or initiating sequence of events, and
thus, the probabilities of the accidents
evaluated in the plant-specific UFSAR are
not affected. The proposed changes do not
involve a change to the predicted radiological
releases due to postulated accident
conditions, thus, the consequences of the
accidents evaluated in the UFSAR are not
affected. The proposed changes do not
increase the probability or consequences of
an accident previously evaluated as the VWS,
VBS and VAS do not provide safety-related
functions and the functions of each system to
support required room environments are not
changed.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes to COL Appendix C
(and plant-specific Tier 1) Table 2.7.2–2,
UFSAR Table 9.2.7–1, and associated UFSAR
design information to identify the revised
equipment parameters for VBS AHUs and
VAS unit coolers and reduced VWS cooling
coil flow rates do not affect any safety-related
equipment, and do not add any new
interfaces to safety-related SSCs. The VWS
function to provide chilled water is not
adversely impacted. The function of the VAS
to provide ventilation and cooling to
maintain the environment of the serviced
areas within the design temperature range is
not adversely impacted by this change. No
system or design function or equipment
qualification is affected by these changes as
the change does not modify the operation of
any SSCs. The changes do not introduce a
new failure mode, malfunction or sequence
of events that could affect safety or safetyrelated equipment. Revised equipment
parameters, including the reduced cooling
coil flow rates, do not adversely impact the
function of associated components.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The changes to COL Appendix C (and
plant-specific Tier 1) Table 2.7.2–2, UFSAR
Table 9.2.7–1, and associated UFSAR design
information do not affect any other safetyrelated equipment or fission product barriers.
The requested changes will not adversely
affect compliance with any design code,
function, design analysis, safety analysis
input or result, or design/safety margin. No
safety analysis or design basis acceptance
limit/criterion is challenged or exceeded by
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
the requested changes as previously
evaluated accidents are not impacted.
Therefore, the proposed amendment does
not involve a significant reduction in the
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius, LLC,
1111 Pennsylvania NW., Washington,
DC 20004–2514.
NRC Branch Chief: Jennifer DixonHerrity.
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–424 and 50–425,
Vogtle Electric Generating Plant, Units 1
and 2, Burke County, Georgia
Date of amendment request: May 24,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17144A408.
Description of amendment request:
The amendments would revise
Surveillance Requirement 3.3.1.3 to
change the thermal power at which the
surveillance may be performed.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment to the TS
[Technical Specification] does not affect the
initiators of any analyzed accident. In
addition, operation in accordance with the
proposed amendment to the TS ensures that
the previously evaluated accidents will
continue to be mitigated as analyzed. The
proposed amendment does not adversely
affect the design function or operation of any
structures, systems, and components
important to safety.
The probability or consequences of
accidents previously evaluated in the UFSAR
[Updated Final Safety Analysis Report] are
unaffected by this proposed amendment
because there is no change to any equipment
response or accident mitigation scenario.
There are no new or additional challenges to
fission product barrier integrity.
Therefore, it is concluded that the
proposed amendment does not involve a
significant increase in the probability or
consequences of an accident previously
evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
32883
accident from any accident previously
evaluated?
The proposed amendment does not involve
a physical alteration of the plant (no new or
different type of equipment will be installed).
The proposed amendment does not create
any new failure modes for existing
equipment or any new limiting single
failures. The proposed amendment does not
involve a change in the methods governing
normal plant operation and all safety
functions will continue to perform as
previously assumed in accident analyses.
Thus, the proposed amendment does not
adversely affect the design function or
operation of any structures, systems, and
components important to safety.
No new accident scenarios, failure
mechanisms, or limiting single failures are
introduced due to the proposed amendment.
The proposed amendment does not challenge
the performance or integrity of any safetyrelated system.
Therefore, it is concluded that the
proposed amendment does not create the
possibility of a new or different kind of
accident from any previously evaluated.
3. Does the proposed changes involve a
significant reduction in a margin of safety?
The margin of safety associated with the
acceptance criteria of any accident is
unchanged. The proposed amendment will
have no affect on the availability, operability,
or performance of the safety-related systems
and components. No change is being made to
the requirement to perform the surveillance.
The NOTE in the surveillance is being
changed to clarify when the initial
surveillance after refueling is to be
performed. The Technical Specification
Limiting Condition for Operation (LCO)
limits are not being changed.
The proposed amendment will not
adversely affect the operation of plant
equipment or the function of equipment
assumed in the accident analysis.
Therefore, it is concluded that the
proposed amendment does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jennifer M.
Buettner, Associate General Counsel,
Southern Nuclear Operating Company,
40 Iverness Center Parkway,
Birmingham, AL 35242.
NRC Branch Chief: Michael T.
Markley.
Southern Nuclear Operating Company,
Docket Nos. 52–025 and 52–026, Vogtle
Electric Generating Plant, Units 3 and 4,
Burke County, Georgia
Date of amendment request: May 5,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17128A120.
E:\FR\FM\18JYN1.SGM
18JYN1
32884
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
Description of amendment request:
The requested amendments propose
changes to more clearly define the
boundaries and seismic requirements
for the portion of the fire protection
system (FPS) piping that is required to
remain functional following a safe
shutdown earthquake (SSE) (i.e., the
‘‘seismic standpipe system’’). The
proposed changes also include the
removal of SSE requirements from pipe
lines that do not need to remain
functional following an SSE
(specifically, the FPS piping that is part
of the non-seismic FPS containment
spray system and the FPS open tray
system).
Pursuant to the provisions of 10 CFR
52.63(b)(1), an exemption from elements
of the design as certified in the 10 CFR
part 52, appendix D, design certification
rule is also requested for the plantspecific Design Control Document Tier
1 material departures.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed modification changes would
clarify the boundaries for the portion of the
nonsafety-related FPS required to remain
functional following a SSE for manual
firefighting in areas with SSE equipment, and
the addition of two new open-nozzle
suppression systems with associated system
isolation valves to provide adequate spray
coverage to accommodate the final cable tray
location, configuration and quantity. These
changes do not affect any accident initiating
event or component failure, thus the
probabilities of the accidents previously
evaluated are not adversely affected. No
function used to mitigate a radioactive
material release and no radioactive material
release source term is involved, thus the
radiological releases in the accident analyses
are not adversely affected. Therefore, the
proposed amendment does not involve an
increase in the probability or consequences
of an accident previously evaluated.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed clarification of the
boundaries for the portion of the nonsafetyrelated FPS required to remain functional
following a SSE for manual firefighting in
areas with equipment required for safe
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
shutdown following an SSE does not affect
the operation of any systems or equipment
that may initiate a new or different kind of
accident, or alter any SSC such that a new
accident initiator or initiating sequence of
events is created. The proposed changes
affect the physical design and operation of
the FPS, including as-installed inspections,
testing, and maintenance requirements, as
described in the Updated Final Safety
Analysis Report (UFSAR) due to the addition
of two open-nozzle suppression systems with
associated system isolation valves. However,
the additional open-nozzle suppression
systems with associated system isolation
valves are similar in design and function as
the existing cable tray suppression systems
and raceway covers. Therefore, the operation
of the FPS is not affected. These proposed
changes do not adversely affect any other
SSC design functions or methods of
operation in a manner that results in a new
failure mode, malfunction, or sequence of
events that affect safety-related or nonsafetyrelated equipment. Therefore, this activity
does not allow for a new fission product
release path, result in a new fission product
barrier failure mode, or create a new
sequence of events that results in significant
fuel cladding failures.
Therefore, the requested amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed clarification of the
boundaries for the portion of the FPS
required to remain functional following a
SSE, and the addition of two new opennozzle suppression systems with associated
system isolation valves do not affect any
safety or accident analysis as the FPS is a
nonsafety-related system. The only function
of the FPS following a design basis
earthquake is to provide water for hose
valves for manual firefighting in safe
shutdown equipment areas. The proposed
changes continue to meet the existing design
basis, design function, regulatory criterion, or
analyses. Therefore, the proposed changes
satisfy the same design functions in
accordance with the codes and standards
currently stated in the UFSAR. These
changes do not adversely affect any design
code, function, design analysis, safety
analysis input or result, or design/safety
margin. No safety analysis or design basis
acceptance limit/criterion is challenged or
exceeded by the proposed changes, and no
margin of safety is reduced.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Balch & Bingham LLP, 1710
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
Sixth Avenue, North, Birmingham, AL
35203–2015.
NRC Branch Chief: Jennifer DixonHerrity.
Southern Nuclear Operating Company,
Docket Nos. 52–025 and 52–026, Vogtle
Electric Generating Plant, Units 3 and 4,
Burke County, Georgia
Date of amendment request: May 9,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17129A608.
Description of amendment request:
The requested amendments propose to
depart from approved AP1000 Design
Control Document (DCD) Tier 2
information (text, tables, and figures) as
incorporated into the Updated Final
Safety Analysis Report (UFSAR) as
plant-specific DCD information, and
also propose to depart from involved
plant-specific Tier 1 information (and
associated combined license (COL)
Appendix C information) and from
involved plant-specific Technical
Specifications as incorporated in
Appendix A of the COL. Specifically,
the proposed amendments would revise
the licensing basis information to reflect
design changes to the main control room
emergency habitability system (VES) to
address the main control room envelope
temperature response.
Pursuant to the provisions of 10 CFR
52.63(b)(1), an exemption from elements
of the design as certified in the 10 CFR
part 52, appendix D, design certification
rule is also requested for the plantspecific DCD Tier 1 material departures.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes do not affect the
operation of any systems or equipment that
initiate an analyzed accident or alter any
structures, systems, and components (SSCs)
accident initiator or initiating sequence of
events. The VES design changes involve: (1)
Addition of an automatic and manual, Class
1E, electrical load shed of nonessential
nonsafety-related equipment within the main
control room envelope (MCRE); and (2)
adding a description of the requirements for
maintaining habitability of the MCRE beyond
72 hours following a Design Basis Accident
to the design and licensing basis. Neither
planned or inadvertent operation nor failure
of the VES is an accident initiator or part of
an initiating sequence of events for an
accident previously evaluated. For example,
if VES actuation occurs from a loss of power
E:\FR\FM\18JYN1.SGM
18JYN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
to the plant in a station blackout condition,
the additional added features including Wall
Panel Information System displays would not
be available regardless of the load shed
feature. This condition was originally
evaluated as part of the AP1000 design
certification and no changes are proposed to
the plant station blackout response. No
additional re-evaluation of other probability
or consequences from failures are required to
support this change. Therefore, the
probabilities of the accidents evaluated in the
UFSAR are not affected.
The proposed changes do not have an
adverse impact on the ability of the VES to
perform its design functions. The design of
the VES continues to meet the same
regulatory acceptance criteria, codes, and
standards as required by the UFSAR. In
addition, the changes maintain the capability
of the VES to mitigate the consequences of
an accident in conformance with the
applicable regulatory acceptance criteria, and
there is no adverse effect on any safetyrelated SSC or function used to mitigate an
accident. The changes do not affect the
prevention and mitigation of other abnormal
events, e.g., anticipated operational
occurrences, earthquakes, floods and turbine
missiles, or their safety or design analyses.
Therefore, the consequences of the accidents
evaluated in the UFSAR are not affected.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes do not affect the
operation of any systems or equipment that
may initiate a new or different kind of
accident, or alter any SSC such that a new
accident initiator or initiating sequence of
events is created. The VES design changes
involve: (1) Addition of an automatic and
manual, Class 1E, electrical load shed of
nonessential nonsafety-related equipment
within the MCRE; and (2) adding a
description of the requirements for
maintaining habitability of the MCRE beyond
72 hours following a DBA to the design and
licensing basis. Although a new failure mode
of the VES is created by the addition of the
MCR Load Shed Panels, neither planned nor
inadvertent operation nor failure of the VES
is an accident initiator or part of an initiating
sequence of events for a new or different kind
of accident. In addition, these proposed
changes do not adversely affect any other
VES or SSC design functions or methods of
operation in a manner that results in a new
failure mode, malfunction, or sequence of
events that affect safety-related or nonsafetyrelated equipment. Therefore, this activity
does not allow for a new fission product
release path, result in a new fission product
barrier failure mode, or create a new
sequence of events that result in significant
fuel cladding failures.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The changes to the VES description and
associated COL Appendix A Technical
Specification changes provide continued
verification that; the VES design functions to
maintain heat loads inside the MCRE within
design-basis assumptions to limit the heat up
of the room, a 72-hour supply of breathablequality air for the occupants of the MCRE is
readily available, and the MCRE pressure
boundary is maintained at a positive pressure
with respect to the surrounding areas. The
changes support the system’s intended
design functions and continue to meet the
regulatory requirements for protecting public
health and safety.
The proposed changes also maintain
existing safety margins. The proposed
changes do not adversely affect VES design
requirements and design functions. The
proposed changes maintain existing safety
margin through continued application of the
existing requirements of the UFSAR, while
adding additional design features and
controls that maintain VES design functions
required to meet the existing safety margins.
Therefore, the proposed changes satisfy the
same design functions in accordance with the
same codes and standards as stated in the
UFSAR. These changes do not adversely
affect any design code, function, design
analysis, safety analysis input or result, or
design/safety margin.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Balch & Bingham LLP, 1710
Sixth Avenue, North, Birmingham, AL
35203–2015.
NRC Branch Chief: Jennifer DixonHerrity.
Union Electric Company, Docket No.
50–483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: April 6,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17097A425.
Description of amendment request:
The amendment would revise the Final
Safety Analysis Report (FSAR) to allow
bypassing of thermal overload
protection during motor-operated valve
surveillance testing.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
32885
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
Keeping the thermal overload protection
(TOP) devices bypassed during surveillance
testing does not introduce the possibility of
a change in the frequency of an accident
because failure of a single safety-related
motor-operated valve (MOV) is not, by itself,
an initiator of any previously evaluated
design basis accident. Valves are active
components that either position to ‘‘open’’ or
‘‘close’’ as required to fulfill safety functions.
As such, safety-related MOVs are subject to
single active failures, but such failures are
not accident initiators. (For safety-related
systems, redundancy in the design ensures
that failure of a valve to open or to close on
demand, as applicable, will not prevent
fulfillment of the safety function(s). However,
the associated safety functions are for
accident mitigation/response, and while an
MOV failure can affect such functions
(without loss of the overall function), a single
MOV failure cannot by itself initiate any
accident previously evaluated in the FSAR.)
Furthermore, the change does not result in
an increase in the consequences of an
accident previously evaluated in the FSAR.
The proposed change would permit MOV
TOP devices to remain bypassed during
surveillance stroke testing but not during
valve maintenance. In regard to the bypassing
of TOP devices during testing, the potential
for valve damage is of greater concern during
valve maintenance activities (when work has
been done on the affected valve(s)) than it is
for surveillance stroke tests. It may be
assumed that the low probability of valve
damage resulting from—or occurring
during—surveillance valve stroke tests (with
the TOP devices bypassed) does not change
the single-failure assumptions already
considered in the plant’s design and accident
analyses. As previously noted, redundancy in
the design of safety-related systems ensures
that failure of a valve to open or close on
demand, as applicable, will not prevent
fulfillment of the safety function(s).
Accordingly, it may be concluded that the
provisions for bypassing TOP devices during
MOV surveillance testing does not require
any changes to assumptions regarding MOV
availability, single-failure protection, or the
associated systems’ capabilities for
performing accident mitigation functions.
With no changes to such assumptions, the
proposed change does not result in more than
a minimal increase in the consequences of an
accident previously evaluated in the FSAR.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
NRC [RG] 1.106, Revision 1 [‘‘Thermal
Overload Protection for Electric Motors on
Motor-Operated Valves’’], requires the
removal of MOV thermal overload relay
bypass jumpers during both maintenance and
E:\FR\FM\18JYN1.SGM
18JYN1
32886
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
periodic tests. The regulatory guide’s
position is that having the thermal overload
protection enabled during periodic tests of an
MOV is desired to prevent valve motor
damage. The concern is that the motor may
be damaged if the thermal overload
protection is not in force.
Keeping the [TOP] devices bypassed
during surveillance testing does not
introduce the possibility of an accident of a
different type than any previously evaluated
in the FSAR. Although there could be a slight
increase in the probability of valve damage
due to the proposed change, any such failure
would not be of a different kind or nature
than what may already be experienced by an
MOV. Thus, no new failure modes or
initiators of a different type of accident are
introduced. The single active failure of a[n]
[MOV] is already considered in the accident
analysis assumptions described in the FSAR,
and the failure of a single MOV is not by
itself an accident initiator.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
No, this change does not affect design basis
limits for a fission product barrier. No
changes to the accident analyses, including
any associated assumptions, are required or
being made for the proposed change. Because
of redundancy incorporated into the plant
design (for single-failure protection), the
failure of a single [MOV] will not result in
the loss of any overall safety function.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
sradovich on DSK3GMQ082PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: John O’Neill,
Esq., Pillsbury Winthrop Shaw Pittman
LLP, 2300 N Street NW., Washington,
DC 20037.
NRC Branch Chief: Robert J.
Pascarelli.
III. Notice of Issuance of Amendments
to Facility Operating Licenses and
Combined Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation, and/or Environmental
Assessment, as indicated. All of these
items can be accessed as described in
the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Duke Energy Florida, Inc., et al., Docket
No. 50–302, Crystal River Unit 3 Nuclear
Generating Plant, Citrus County, Florida
Date of amendment request:
December 9, 2016.
Brief description of amendment: The
amendment approved the removal of the
existing cyber security license condition
from the facility operating license.
Date of issuance: June 22, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment No.: 254. A publiclyavailable version is in ADAMS under
Package Accession No. ML17096A279;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Operating License No. DPR–
72: The amendment revised the license.
Date of initial notice in Federal
Register: January 31, 2017 (82 FR
8868).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 22, 2017.
No significant hazards consideration
comments received: No.
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
Duke Energy Florida, Inc., et al., Docket
No. 50–302, Crystal River Unit 3 (CR–3)
Nuclear Generating Plant, Citrus
County, Florida
Date of amendment request: August
31, 2016.
Brief description of amendment: The
amendment approved an amendment to
the CR–3 Facility Operating License and
the Permanently Defueled Technical
Specifications to reflect removal of all
CR–3 spent nuclear fuel from the spent
fuel pools and its transfer to dry cask
storage within the independent spent
fuel storage installation (ISFSI).
Date of issuance: June 27, 2017.
Effective date: The date Duke Energy
Florida, LLC submits written
notification that all spent fuel has been
transferred from the spent fuel pool to
the ISFSI and shall be implemented
within 60 days.
Amendment No.: 255.
Facility Operating License No. DPR–
72: The amendment revised the license.
Date of initial notice in Federal
Register: October 25, 2016 (81 FR
73432).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 27, 2017.
No significant hazards consideration
comments received: No.
Energy Northwest, Docket No. 50–397,
Columbia Generating Station, Benton
County, Washington
Date of amendment request: July 12,
2016, as supplemented by letter dated
November 17, 2016.
Brief description of amendment: The
amendment reduced the minimum
reactor dome pressure associated with
the critical power correlation from 785
pounds per square inch gauge (psig) to
686 psig in Technical Specification
2.1.1, ‘‘Reactor Core SLs [Safety
Limits],’’ and associated bases.
Date of issuance: June 27, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 242. A publiclyavailable version is in ADAMS under
Accession No. ML17131A071;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. NPF–21: The amendment revised
the Renewed Facility Operating License
and Technical Specifications.
Date of initial notice in Federal
Register: The license amendment
request was originally noticed in the
Federal Register on October 25, 2016
(81 FR 73433). Subsequently, by letter
dated November 17, 2016, the licensee
E:\FR\FM\18JYN1.SGM
18JYN1
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
provided additional information that
expanded the scope of the amendment
request as originally noticed in the
Federal Register. Accordingly, the NRC
published a second proposed no
significant hazards consideration
determination in the Federal Register
on April 25, 2017 (82 FR 19102), which
superseded the original notice in its
entirety.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 27, 2017.
No significant hazards consideration
comments received: No.
Exelon Generation Company, LLC,
Docket No. 50–333, James A. FitzPatrick
Nuclear Power Plant, Oswego County,
New York
Date of amendment request: May 19,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17139C739.
Brief description of amendment: The
amendment revised the Emergency
Action Level HU1.5 for James A.
FitzPatrick Nuclear Power Plant by
replacing the phrase ‘‘Lake water level
>249.2 ft’’ with the phrase ‘‘A hazardous
event that results in on-site conditions
sufficient to prohibit the plant staff from
accessing the site via personal
vehicles.’’
Date of issuance: June 30, 2017.
Effective date: As of the date of
issuance, and shall be implemented
within 30 days of issuance.
Amendment No.: 315. A publiclyavailable version is in ADAMS under
Accession No. ML17153A018;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–59: The amendment revised
the Renewed Facility Operating License.
Date of initial notice in Federal
Register: May 30, 2017 (82 FR 24742).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 30, 2017.
No significant hazards consideration
comments received: No.
sradovich on DSK3GMQ082PROD with NOTICES
Exelon Generation Company, LLC,
Docket Nos. 50–220 and 50–410, Nine
Mile Point Nuclear Station, Units 1 and
2, Oswego County, New York
Date of amendment request: May 19,
2017. A publicly-available version is in
ADAMS under Accession No.
ML17139C739.
Brief description of amendments: The
amendments revised the Emergency
Action Level HU1.5 for Nine Mile Point
Nuclear Station, Units 1 and 2, by
replacing the phrase ‘‘Lake water level
>249.3 ft’’ with the phrase ‘‘A hazardous
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
event that results in on-site conditions
sufficient to prohibit the plant staff from
accessing the site via personal
vehicles.’’
Date of issuance: June 30, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 228 (Unit 1) and
162 (Unit 2). A publicly-available
version is in ADAMS under Accession
No. ML17152A320; documents related
to these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Renewed Facility Operating License
Nos. DPR–63 and NPF–69: Amendments
revised the Renewed Facility Operating
Licenses.
Date of initial notice in Federal
Register: May 30, 2017 (82 FR 24746).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 30, 2017.
No significant hazards consideration
comments received: Yes. The comment
is addressed in the Safety Evaluation
referenced above.
Exelon Generation Company, LLC,
Docket No. 50–219, Oyster Creek
Nuclear Generating Station (Oyster
Creek), Ocean County, New Jersey
Date amendment request: February
20, 2017.
Brief description of amendment: The
amendment deleted from the Oyster
Creek facility operating license certain
license conditions that impose specific
requirements on the decommissioning
trust fund agreement. The provisions of
10 CFR 50.75(h) that specify the
regulatory requirements for
decommissioning trust funds will apply
to Oyster Creek.
Date of issuance: June 23, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment No.: 291. A publiclyavailable version is in ADAMS under
Accession No. ML17067A042;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–16: Amendment revised the
Facility Operating License.
Date of initial notice in Federal
Register: March 28, 2017 (82 FR
15381).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 23, 2017.
No significant hazards consideration
comments received: No.
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
32887
Exelon Generation Company, LLC,
Docket No. 50–244, R.E. Ginna Nuclear
Power Plant, Wayne County, New York
Date of amendment request: August
22, 2016.
Brief description of amendment: The
amendment revised Technical
Specification 4.2.1, ‘‘Reactor Core, Fuel
Assemblies,’’ and Technical
Specification 5.6.5, ‘‘Reporting
Requirements, Core Operating Limits
Report (COLR),’’ paragraph b, to allow
the use of Optimized ZIRLOTM fuel
cladding material. The amendment is
also supported by an exemption from
certain requirements of 10 CFR 50.46
and 10 CFR part 50, appendix K,
Date of issuance: June 21, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 125. A publiclyavailable version is in ADAMS under
Accession No. ML17131A066;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–18: Amendment revised the
Renewed Facility Operating License and
Technical Specifications.
Date of initial notice in Federal
Register: November 8, 2016 (81 FR
78648).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 21, 2017.
No significant hazards consideration
comments received: No.
Exelon Generation Company, LLC,
Docket Nos. 50–289 and 50–320, Three
Mile Island Nuclear Station, Units 1 and
2, Dauphin County, Pennsylvania
Date of amendment request: July 15,
2016, as supplemented by letter dated
February 13, 2017.
Brief description of amendment: The
amendment approved changes to the
emergency plan that involve on-shift
emergency response staffing
modifications.
Date of issuance: June 23, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 90 days.
Amendment No.: 291. A publiclyavailable version is in ADAMS under
Accession No. ML17137A393;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–50: Amendment revised the
emergency plan.
Date of initial notice in Federal
Register: The license amendment
request was originally noticed in the
E:\FR\FM\18JYN1.SGM
18JYN1
32888
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
Federal Register on October 25, 2016
(81 FR 73435). The supplement dated
February 13, 2017, expanded the scope
of the application as originally noticed;
therefore, the NRC staff renoticed the
application in the Federal Register on
April 11, 2017 (82 FR 17458).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 23, 2017
No significant hazards consideration
comments received: No.
FirstEnergy Nuclear Operating
Company, Docket No. 50–440, Perry
Nuclear Power Plant, Unit No. 1, Lake
County, Ohio
Date of amendment request: October
27, 2016.
Brief description of amendment: The
amendment revised Technical
Specification (TS) 3.8.3, ‘‘Diesel Fuel
Oil, Lube Oil, and Starting Air,’’ by
removing the current stored diesel fuel
oil and lube oil numerical volume
requirements from the TS and replacing
them with diesel operating time
requirements consistent with NRCapproved Revision 1 to Technical
Specifications Task Force (TSTF)
Improved Standard Technical
Specifications Change Traveler TSTF–
501, ‘‘Relocate Stored Fuel Oil and Lube
Oil Volume Values to Licensee
Control.’’
Date of issuance: June 29, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 177. A publiclyavailable version is in ADAMS under
Accession No. ML17163A354;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Operating License No. NPF–
58: Amendment revised the Facility
Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: December 20, 2016 (81 FR
92869).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 29, 2017
No significant hazards consideration
comments received: No.
sradovich on DSK3GMQ082PROD with NOTICES
Nebraska Public Power District, Docket
No. 50–298, Cooper Nuclear Station
(CNS), Nemaha County, Nebraska
Date of amendment request: August
26, 2016.
Brief description of amendment: The
amendment revised the CNS Technical
Specifications (TSs) to eliminate TS
5.5.6, ‘‘Inservice Testing Program,’’ to
remove requirements duplicated in the
American Society of Mechanical
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
Engineers Code for Operations and
Maintenance of Nuclear Power Plants
Case OMN–20, ‘‘Inservice Test
Frequency.’’ A new defined term,
‘‘Inservice Testing Program,’’ was added
to TS Section 1.1, ‘‘Definitions.’’ The
licensee stated that the change to the
TSs is consistent with Technical
Specifications Task Force (TSTF)
Traveler TSTF–545, Revision 3, ‘‘TS
Inservice Testing Program Removal &
Clarify SR [Surveillance Requirement]
Usage Rule Application to Section 5.5
Testing,’’ which was made available to
the TSTF via NRC letter dated December
11, 2015 (ADAMS Accession No.
ML15317A071), with no proposed
technical variations or deviations.
However, in some cases, the CNS TSs
use different section titles or numbering
for SRs than the Standard Technical
Specifications on which TSTF–545 was
based. The licensee changed the TSTF–
545 numbering to be consistent with the
CNS TS numbering.
Date of issuance: June 20, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 259. A publiclyavailable version is in ADAMS under
Accession No. ML17144A082;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–46: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: November 8, 2016 (81 FR
78649).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 20, 2017.
No significant hazards consideration
comments received: No.
Northern States Power Company—
Minnesota, Docket Nos. 50–282 and 50–
306, Prairie Island Nuclear Generating
Plant, Units 1 and 2, Goodhue County,
Minnesota
Date of amendment request: August
31, 2016, as supplemented by letter
dated February 16, 2017.
Brief description of amendments: The
amendments revised Technical
Specification (TS) 3.8.7 by removing the
site-specific Required Actions and
associated Completion Times, thus
reverting to the standard TS language
contained in NUREG–1431, ‘‘Standard
Technical Specifications: Westinghouse
Plants.’’
Date of issuance: June 20, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
Amendment Nos.: 219 (Unit 1) and
206 (Unit 2). A publicly-available
version is in ADAMS under Accession
No. ML17130A716; documents related
to these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Renewed Facility Operating License
Nos. DPR–42 and DPR–60: The
amendments revised the Renewed
Facility Operating Licenses and TSs.
Date of initial notice in Federal
Register: October 25, 2016 (81 FR
73436). The supplemental letter dated
February 16, 2017, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 20, 2017.
No significant hazards consideration
comments received: No.
PSEG Nuclear LLC and Exelon
Generation Company, LLC, Docket Nos.
50–272 and 50–311, Salem Nuclear
Generating Station, Unit Nos. 1 and 2
(Salem Units 1 and 2), Salem County,
New Jersey
Date of amendment request: August
30, 2016.
Brief description of amendments: The
amendments approved adoption of
NRC-approved Technical Specifications
Task Force (TSTF) Improved Standard
Technical Specifications Change
Traveler TSTF–545, Revision 3, ‘‘TS
Inservice Testing Program Removal &
Clarify SR [Surveillance Requirement]
Usage Rule Application to Section 5.5
Testing,’’ dated October 21, 2015.
Specifically, the amendments deleted
the Salem Units 1 and 2 Technical
Specification (TS) Section 6.8.4.j,
‘‘Inservice Testing Program,’’ and added
a new defined term, ‘‘INSERVICE
TESTING PROGRAM,’’ to the TSs. All
existing references to the ‘‘Inservice
Testing Program’’ in the Salem Units 1
and 2 TS SRs are replaced with
‘‘INSERVICE TESTING PROGRAM’’ so
that the SRs refer to the new definition
in lieu of the deleted program.
Date of issuance: June 28, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 319 (Unit No. 1)
and 300 (Unit No. 2). A publiclyavailable version is in ADAMS under
Accession No. ML17165A214;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
E:\FR\FM\18JYN1.SGM
18JYN1
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
Renewed Facility Operating License
Nos. DPR–70 and DPR–75: The
amendments revised the Renewed
Facility Operating Licenses and TSs.
Date of initial notice in Federal
Register: November 8, 2016 (81 FR
78651).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 28, 2017.
No significant hazards consideration
comments received: No.
sradovich on DSK3GMQ082PROD with NOTICES
PSEG Nuclear LLC, Docket No. 50–354,
Hope Creek Generating Station (Hope
Creek), Salem County, New Jersey
Date of amendment request: July 20,
2016.
Brief description of amendment: The
amendment approved adoption of NRCapproved Technical Specifications Task
Force (TSTF) Improved Standard
Technical Specifications Change
Traveler TSTF–545, Revision 3, ‘‘TS
Inservice Testing Program Removal &
Clarify SR [Surveillance Requirement]
Usage Rule Application to Section 5.5
Testing,’’ dated October 21, 2015.
Specifically, the amendment deleted the
Hope Creek Technical Specification
(TS) Section 6.8.4.i, ‘‘Inservice Testing
Program,’’ and added a new defined
term, ‘‘INSERVICE TESTING
PROGRAM,’’ to the TSs. All existing
references to the ‘‘Inservice Testing
Program’’ in the Hope Creek TS SRs are
replaced with ‘‘INSERVICE TESTING
PROGRAM’’ so that the SRs refer to the
new definition in lieu of the deleted
program.
Date of issuance: June 28, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 205. A publiclyavailable version is in ADAMS under
Accession No. ML17164A355;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. NPF–57: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: October 25, 2016 (81 FR
73437).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 28, 2017.
No significant hazards consideration
comments received: No.
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
32889
Southern Nuclear Operating Company,
Alabama Power Company, Docket Nos.
50–348 and 50–364, Joseph M. Farley
Nuclear Plant (Farley), Units 1 and 2,
Houston County, Alabama
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–348 and 50–364,
Joseph M. Farley Nuclear Plant (Farley),
Units 1 and 2, Houston County,
Alabama
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50–
424 and 50–425, Vogtle Electric
Generating Plant (Vogtle), Units 1 and 2,
Burke County, Georgia
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–424 and 50–425,
Vogtle Electric Generating Plant
(Vogtle), Units 1 and 2, Burke County,
Georgia
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50–
321 and 50–366, Edwin I. Hatch Nuclear
Plant (Hatch), Unit Nos. 1 and 2,
Appling County, Georgia
Date of amendment request:
December 1, 2016.
Brief description of amendments: The
amendments modified the Technical
Specification (TS) requirements in
Section 1.3 and Section 3.0 regarding
Limiting Conditions for Operation
(LCO) and Surveillance Requirement
(SR) usage. The changes are consistent
with NRC-approved Technical
Specifications Task Force (TSTF)
Traveler TSTF–529, Revision 4, ‘‘Clarify
Use and Application Rules.’’
Date of issuance: June 27, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Farley—211 (Unit
1) and 208 (Unit 2); Vogtle—187 (Unit
1) and 168 (Unit 2); and Hatch—285
(Unit No. 1) and 230 (Unit No. 2). A
publicly-available version is in ADAMS
under Accession No. ML17137A041;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. NPF–2, NPF–8, NPF–68, NPF–81,
DPR–57, and NPF–5: Amendments
revised the Renewed Facility Operating
Licenses and TSs.
Date of initial notice in Federal
Register: February 28, 2017 (82 FR
12135).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 27, 2017.
No significant hazards consideration
comments received: No.
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50–
321 and 50–366, Edwin I. Hatch Nuclear
Plant (Hatch), Unit Nos. 1 and 2,
Appling County, Georgia
Date of amendment request: July 28,
2016.
Brief description of amendments: The
amendments modified the technical
specifications (TSs) to eliminate Section
5.5.8, ‘‘Inservice Testing Program,’’ for
Farley and Vogtle, and eliminate
Section 5.5.6, ‘‘Inservice Testing
Program,’’ for Hatch. A new defined
term, ‘‘Inservice Testing Program,’’ is
added to the TS Definitions section.
This request is consistent with
Technical Specifications Task Force
(TSTF) Traveler TSTF–545, Revision 3,
‘‘TS Inservice Testing Program Removal
& Clarify SR [Surveillance Requirement]
Usage Rule Application to Section 5.5
Testing’’.
Date of issuance: June 30, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 120 days of issuance.
Amendment Nos.: Farley—212 (Unit
1) and 209 (Unit 2); Vogtle—187 (Unit
1) and 170 (Unit 2); and Hatch—286
(Unit No. 1) and 231 (Unit No. 2). A
publicly-available version is in ADAMS
under Accession No. ML17152A218;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. NPF–2, NPF–8, NPF–68, NPF–81,
DPR–57, and NPF–5: Amendments
revised the Renewed Facility Operating
Licenses and TSs.
Date of initial notice in Federal
Register: September 27, 2016 (81 FR
66309).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 30, 2017.
No significant hazards consideration
comments received: No.
E:\FR\FM\18JYN1.SGM
18JYN1
32890
Federal Register / Vol. 82, No. 136 / Tuesday, July 18, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
Southern Nuclear Operating Company,
Inc., Docket Nos. 52–025 and 50–026,
Vogtle Electric Generating Plant, Units 3
and 4, Burke County, Georgia
Date of amendment request: August
29, 2016, as supplemented by letter
dated February 13, 2017.
Brief description of amendments: The
amendments changed Combined
License Nos. NPF–91 and NPF–92 for
the Vogtle Electric Generating Plant,
Units 3 and 4. The amendments
changed the Updated Final Safety
Analysis Report (UFSAR) in the form of
departures from the incorporated plantspecific Design Control Document
(DCD) Tier 2* information. Specifically,
the amendment proposed changes to
demonstrate the quality and strength of
a specific population of welds between
stainless steel mechanical couplers
(couplers) and embedment plates that
did not receive the nondestructive
examinations required by the American
Institute of Steel Construction N690–
1994, ‘‘Specification for the Design,
Fabrication, and Erection of Steel
Safety-Related Structures for Nuclear
Facilities.’’ Since some of these coupler
welds are already installed and
embedded in concrete, the licensee
proposed to demonstrate the adequacy
of these inaccessible coupler welds
through previously-performed visual
testing examinations of the couplers and
static tension testing of a representative
sample of accessible, uninstalled
couplers produced concurrently with
those already installed.
Date of issuance: June 27, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 80 (Unit 3) and 79
(Unit 4). A publicly-available version is
in ADAMS under Package Accession
No. ML17107A275; documents related
to these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Facility Operating License No. NPF–
91 and NPF–92: Amendments revised
the UFSAR in the form of departures
from the incorporated plant-specific
DCD Tier 2* information.
Date of initial notice in Federal
Register: November 8, 2017 (81 FR
78666). The supplement, dated February
13, 2017, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the NRC staff’s
original proposed no significant hazards
consideration determination.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 27, 2017.
VerDate Sep<11>2014
17:47 Jul 17, 2017
Jkt 241001
No significant hazards consideration
comments received: No.
Tennessee Valley Authority, Docket
Nos. 50–390 and 50–391, Watts Bar
Nuclear Plant, Units 1 and 2, Rhea
County, Tennessee
Date of amendment request: October
17, 2016, as supplemented by letter
dated March 6, 2017.
Brief description of amendments: The
amendments revised selected Technical
Specification (TS) Surveillance
Requirements (SRs) for alternating
current electrical sources because of
delays in the startup of Watts Bar
Nuclear Plant, Unit 2. Specifically, the
amendments revised the TSs to permit
a one-time extension of the specified 18month interval for performing the
required SRs.
Date of issuance: June 28, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 114 (Unit 1) and 12
(Unit 2). A publicly-available version is
in ADAMS under Accession No.
ML17138A100; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Facility Operating License Nos. NPF–
90 and NPF–96: Amendments revised
the Facility Operating Licenses and TSs.
Date of initial notice in the Federal
Register: February 28, 2017 (82 FR
12138). The supplemental letter dated
March 6, 2017, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 28, 2017.
No significant hazards consideration
comments received: No.
TEX Operations Company LLC, Docket
Nos. 50–445 and 50–446, Comanche
Peak Nuclear Power Plant (CPNPP),
Unit Nos. 1 and 2, Somervell County,
Texas
Date of amendment request:
December 14, 2016.
Brief description of amendments: The
amendments revised the licensee name
from ‘‘TEX Operations Company LLC’’
to ‘‘Vistra Operations Company LLC’’ in
the CPNPP, Unit No. 1, Facility
Operating License (FOL) NPF–87;
CPNPP, Unit No. 2, FOL (NPF–89); and
the title page of the Environmental
Protection Plan.
Date of issuance: June 29, 2017.
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
Effective date: As of the date of
issuance and shall be implemented
within 30 days from the date of
issuance.
Amendment Nos.: 169 (Unit 1) and
169 (Unit 2). A publicly-available
version is in ADAMS under Accession
No. ML17129A024; documents related
to these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Facility Operating License Nos. NPF–
87 and NPF–89: The amendments
revised the Facility Operating Licenses.
Date of initial notice in Federal
Register: February 28, 2017 (82 FR
12139).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 29, 2017.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 6th day
of July 2017.
For the Nuclear Regulatory Commission.
Eric J. Benner,
Deputy Director, Division of Operating
Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2017–14743 Filed 7–17–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–285; NRC–2017–0160]
Omaha Public Power District; Fort
Calhoun Station, Unit No. 1
Nuclear Regulatory
Commission.
ACTION: Exemption; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an
exemption in response to a October 7,
2016, request from Omaha Public Power
District (OPPD or the licensee), from
certain regulatory requirements. The
exemption would permit a certified fuel
handler (CFH), in addition to a licensed
senior operator, to approve the
emergency suspension of security
measures for Fort Calhoun Station, Unit
No. 1 (FCS) during certain emergency
conditions or during severe weather.
DATES: The exemption was issued on
July 7, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2017–0160 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
SUMMARY:
E:\FR\FM\18JYN1.SGM
18JYN1
Agencies
[Federal Register Volume 82, Number 136 (Tuesday, July 18, 2017)]
[Notices]
[Pages 32875-32890]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14743]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2017-0158]
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954,
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is
publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued, and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued, from June 20,
[[Page 32876]]
2017 to July 3, 2017. The last biweekly notice was published on July 5,
2017.
DATES: Comments must be filed by August 17, 2017. A request for a
hearing must be filed by September 18, 2017.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0158. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: TWFN-8-D36M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-1927, email: lynn.ronewicz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2017-0158, facility name, unit
number(s), plant docket number, application date, and subject, when
contacting the NRC about the availability of information for this
action. You may obtain publicly available information related to this
action by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0158.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2017-0158, facility name, unit
number(s), plant docket number, application date, and subject, in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92 of title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated, or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish in the Federal Register a notice of
issuance. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the
[[Page 32877]]
proceeding; (3) the nature and extent of the petitioner's property,
financial, or other interest in the proceeding; and (4) the possible
effect of any decision or order which may be entered in the proceeding
on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or federally recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally-recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC's Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public Web site at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time
[[Page 32878]]
the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to these license amendment
applications, see the application for amendment which is available for
public inspection in ADAMS and at the NRC's PDR. For additional
direction on accessing information related to this document, see the
``Obtaining Information and Submitting Comments'' section of this
document.
Arizona Public Service Company, et al., Docket Nos. STN 50-528, STN 50-
529, and STN 50-530, Palo Verde Nuclear Generating Station, Units 1, 2,
and 3 (PVNGS), Maricopa County, Arizona
Date of amendment request: June 14, 2017. A publicly-available
version is in ADAMS under Accession No. ML17165A555.
Description of amendment request: The amendments would modify the
completion date for implementation of Milestone 8 of the Cyber Security
Plan (CSP). The proposed amendments would extend the CSP Milestone 8
completion date from September 30, 2017, to December 31, 2017.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the PVNGS Cyber Security Plan
implementation schedule is administrative in nature. This proposed
change does not alter accident analysis assumptions, add any
initiators, or affect the function of plant systems or the manner in
which systems are operated, maintained, modified, tested, or
inspected. The proposed change does not require any plant
modifications which affect the performance capability of the
structures, systems, and components (SSCs) relied upon to mitigate
the consequences of postulated accidents, and has no impact on the
probability or consequences of an accident previously evaluated.
Therefore, the proposed change will not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change to the PVNGS Cyber Security Plan
implementation schedule is administrative in nature. This proposed
change does not alter accident analysis assumptions, add any
initiators, or affect the function of plant systems or the manner in
which systems are operated, maintained, modified, tested, or
inspected. The proposed change does not require any plant
modifications which affect the performance capability of the SSCs
relied upon to mitigate the consequences of postulated accidents,
and does not create the possibility of a new or different kind of
accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Plant safety margins are established through limiting conditions
for operation, limiting safety systems settings, and safety limits
specified in the [T]echnical [S]pecifications [TSs]. The proposed
change to the PVNGS Cyber Security Plan implementation schedule is
administrative in nature. Since the proposed change is
administrative in nature, there are no changes to these established
safety margins.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety as defined in the basis for any TS.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
[[Page 32879]]
proposes to determine that the request for amendments involves no
significant hazards consideration.
Attorney for licensee: Michael G. Green, Senior Regulatory Counsel,
Pinnacle West Capital Corporation, P.O. Box 52034, Mail Station 8695,
Phoenix, AZ 85072-2034.
NRC Branch Chief: Robert J. Pascarelli.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South
Carolina
Date of amendment request: March 30, 2017, as supplemented by
letter dated May 11, 2017. Publicly-available versions are in ADAMS
under Accession Nos. ML17095A530 and ML17139D352, respectively.
Description of amendment request: The amendments would revise the
Technical Specifications (TSs) in accordance with the NRC-approved
Technical Specifications Task Force (TSTF) Standard Technical
Specification Change Traveler TSTF-448, Revision 3, ``Control Room
Habitability,'' with variations from the TSTF to account for plant-
specific configuration and licensing basis differences. The amendments
would modify the TSs for the control room ventilation system (CRVS)
booster fans and would establish a control room envelop (CRE)
habitability program in TS 5.5, ``Programs and Manuals.'' The NRC staff
issued ``Notice of Availability of Technical Specification Improvement
to Modify Requirements Regarding Control Room Envelope Habitability
Using the Consolidated Line Item Improvement Process,'' associated with
TSTF-448, Revision 3, in the Federal Register on January 17, 2007 (72
FR 2022). The notice included a model safety evaluation, a model no
significant hazards consideration determination, and a model license
amendment request. In its application dated March 30, 2017, as
supplemented by letter dated May 11, 2017, the licensee affirmed the
applicability of the model no significant hazards consideration
determination, which is presented in the following section.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee affirmed
the applicability of the model no significant hazards consideration,
which is presented below:
Criterion 1--The Proposed Change Does Not Involve a Significant
Increase in the Probability or Consequences of an Accident Previously
Evaluated
The proposed change does not adversely affect accident
initiators or precursors nor alter the design assumptions,
conditions, or configuration of the facility. The proposed change
does not alter or prevent the ability of structures, systems, and
components (SSCs) to perform their intended function to mitigate the
consequences of an initiating event within the assumed acceptance
limits. The proposed change revises the TS for the [CRVS], which is
a mitigation system designed to minimize unfiltered air leakage into
the CRE and to filter the CRE atmosphere to protect the CRE
occupants in the event of accidents previously analyzed. An
important part of the [CRVS] is the CRE boundary. The [CRVS] is not
an initiator or precursor to any accident previously evaluated.
Therefore, the probability of any accident previously evaluated is
not increased. Performing tests to verify the operability of the CRE
boundary and implementing a program to assess and maintain CRE
habitability ensure that the [CRVS] is capable of adequately
mitigating radiological consequences to CRE occupants during
accident conditions, and that the [CRVS] will perform as assumed in
the consequence analyses of design basis accidents. Thus, the
consequences of any accident previously evaluated are not increased.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
Criterion 2--The Proposed Change Does Not Create the Possibility of a
New or Different Kind of Accident From Any Accident Previously
Evaluated
The proposed change does not impact the accident analysis. The
proposed change does not alter the required mitigation capability of
the [CRVS], or its functioning during accident conditions as assumed
in the licensing basis analyses of design basis accident
radiological consequences to CRE occupants. No new or different
accidents result from performing the new surveillance or following
the new program. The proposed change does not involve a physical
alteration of the plant (i.e., no new or different type of equipment
will be installed) or a significant change in the methods governing
normal plant operation. The proposed change does not alter any
safety analysis assumptions and is consistent with current plant
operating practice.
Therefore, this change does not create the possibility of a new
or different kind of accident from any accident previously
evaluated.
Criterion 3--The Proposed Change Does Not Involve a Significant
Reduction in the Margin of Safety
The proposed change does not alter the manner in which safety
limits, limiting safety system settings or limiting conditions for
operation are determined. The proposed change does not affect safety
analysis acceptance criteria. The proposed change will not result in
plant operation in a configuration outside the design basis for an
unacceptable period of time without compensatory measures. The
proposed change does not adversely affect systems that respond to
safely shut down the plant and to maintain the plant in a safe
shutdown condition.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Vice President Nuclear &
EHS Legal Support, Duke Energy Corporation, 526 South Church Street--
EC07H, Charlotte, NC 28202-1802.
NRC Branch Chief: Michael T. Markley.
Entergy Nuclear Operations, Inc. (ENO), Docket No. 50-271, Vermont
Yankee Nuclear Power Station, Vernon, Vermont
Date of amendment request: May 15, 2017. A publicly-available
version is in ADAMS under Package Accession No. ML17139D261.
Description of amendment request: The proposed amendment would
replace the Permanently Defueled Emergency Plan and its associated
Permanently Defueled Emergency Action Level (EAL) Technical Bases
Document with the Independent Spent Fuel Storage Installation (ISFSI)
Emergency Plan and its associated ISFSI EAL Technical Bases Document,
for the Vermont Yankee Nuclear Power Station (VY). The proposed changes
would reflect the complete removal of all fuel from the spent fuel pool
(SFP) and permit specific reductions in the size and makeup of the
Emergency Response Organization due to the elimination of the design-
basis accident related to the spent fuel (fuel handling accident). As
described in the Post Shutdown Decommissioning Activities Report, spent
fuel will remain in the SFP until it meets the criteria for transfer,
the existing ISFSI is expanded, and the spent fuel can be safely
transferred in an efficient manner to the expanded ISFSI, an activity
that is currently scheduled for completion in late 2018.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
[[Page 32880]]
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment would modify the VY facility operating
license by revising the emergency plan and EAL scheme. VY has
permanently ceased power operations and is permanently defueled. The
proposed amendment is conditioned on all spent nuclear fuel being
removed from wet storage in the SFP and placed in dry storage within
the ISFSI. Occurrence of postulated accidents associated with spent
fuel stored in a SFP is no longer credible in a SFP devoid of fuel.
The proposed amendment has no effect on plant structures, systems,
or components (SSC) and therefore can neither affect the capability
of any plant SSC to perform its design function nor increase the
likelihood of the malfunction of any plant SSC. The proposed
amendment would have no effect on any of the previously evaluated
accidents in the VY Defueled Safety Analysis Report or the Holtec
HI-STORM 100 Final Safety Analysis Report.
Because VY has permanently ceased power operations, the
generation of fission products has largely ceased and the remaining
source term continues to decay. This source term decay continues to
significantly reduce the consequences of previously evaluated
postulated accidents. Furthermore, previously generated source term
materials such as reactor water cleanup resins have been removed
from the site in accordance with applicable regulations and
permitting requirements.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendment constitutes a revision of the emergency
planning function commensurate with the ongoing and anticipated
reduction in radiological source term at VY.
The proposed amendment does not involve a physical alteration of
the plant. No new or different types of equipment will be installed
and there are no physical modifications to existing equipment as a
result of the proposed amendment. Similarly, the proposed amendment
would not physically change any SSC involved in the mitigation of
any postulated accidents. Thus, no new initiators or precursors of a
new or different kind of accident are created. Furthermore, the
proposed amendment does not create the possibility of a new failure
mode associated with any equipment or personnel failures. The
credible events for the ISFSI remain unchanged.
Therefore, the proposed amendments do not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Because the 10 CFR part 50 license for VY no longer authorizes
operation of the reactor or emplacement or retention of fuel into
the reactor vessel, as specified in 10 CFR 50.82(a)(2), the
postulated accidents associated with reactor operation are no longer
credible. In addition, with all spent nuclear fuel transferred out
of wet storage from the SFP and placed in dry storage within the
ISFSI, a fuel handling accident is no longer credible during dry
storage of spent nuclear fuel. Therefore, there are no credible
events that would result in radiological releases beyond the site
boundary exceeding the exposure levels in U.S. EPA's ``Protective
Action Guide and Planning Guidance for Radiological Incidents,''
dated January 2017.
The proposed amendment does not involve a change in the plant's
design, configuration, or operation. The proposed amendment does not
affect either the way in which the plant SSCs perform their safety
function or their design margins. Because there is no change to the
physical design of the facility, there is no change to these
margins.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Susan Raimo, Senior Counsel, Entergy
Services, Inc., 101 Constitution Ave. NW., Suite 200 East, Washington,
DC 20001.
NRC Branch Chief: Bruce Watson.
Entergy Nuclear Operations, Inc., Docket Nos. 50-003, 50-247, and 50-
286, Indian Point Nuclear Generating Unit Nos. 1, 2, and 3, Westchester
County, New York
Date of amendment request: April 28, 2017. A publicly-available
version is in ADAMS under Accession No. ML17129A612.
Description of amendment request: The amendments would modify the
completion date for implementation of Milestone 8 of the Cyber Security
Plan (CSP). The proposed amendments would extend the CSP Milestone 8
full implementation date from December 31, 2017, to December 31, 2022.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the CSP Implementation Schedule does not
alter accident analysis assumptions, add any initiators, or affect
the function of plant systems or the manner in which systems are
operated, maintained, modified, tested, or inspected. The proposed
change does not require any plant modifications which affect the
performance capability of the structures, systems, and components
relied upon to mitigate the consequences of postulated accidents and
has no impact on the probability or consequences of an accident
previously evaluated.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to the CSP Implementation Schedule does not
alter accident analysis assumptions, add any initiators, or affect
the function of plant systems or the manner in which systems are
operated, maintained, modified, tested, or inspected. The proposed
change does not require any plant modifications which affect the
performance capability of the structures, systems, and components
relied upon to mitigate the consequences of postulated accidents and
does not create the possibility of a new or different kind of
accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
Plant safety margins are established through limiting conditions
for operation, limiting safety system settings, and safety limits
specified in the technical specifications. The proposed change to
the CSP Implementation Schedule does not involve these items. In
addition, the milestone date delay for full implementation of the
CSP has no substantive impact because other measures have been taken
which provide adequate protection during this period of time.
Because there is no change to established safety margins as a result
of this change, the proposed change does not involve a significant
reduction in a margin of safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Jeanne Cho, Assistant General Counsel,
Entergy
[[Page 32881]]
Nuclear Operations, Inc., 440 Hamilton Avenue, White Plains, NY 10601.
NRC Branch Chief: James G. Danna.
Entergy Nuclear Operations, Inc., Docket No. 50-247, Indian Point
Nuclear Generating Unit No. 2, Westchester County, New York
Date of amendment request: April 7, 2017. A publicly-available
version is in ADAMS under Package Accession No. ML17104A039.
Description of amendment request: The amendment would revise
Technical Specification 3.5.4, ``Refueling Water Storage Tank (RWST),''
such that the non-seismically qualified piping of the Boric Acid
Recovery System be connected to the RWST seismic piping. This change
will only be applicable until the end of the Indian Point Nuclear
Generating Unit No. 2 Refueling Outage 2R23.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The use of the non-seismic Boric Acid Recovery System (BARS) to
recirculate and filter the RWST water does not involve any changes
or create any new interfaces with the reactor coolant system or main
steam system piping. Therefore, the connection of the BARS
Purification Loop to the RWST would not affect the probability of
these accidents occurring. The BARS is not credited for safe
shutdown of the plant or accident mitigation. Administrative
controls ensure that the BARS can be isolated as necessary and in
sufficient time to assure that the RWST volume will be adequate to
perform the safety function as designed. Since the RWST will
continue to perform its safety function and overall system
performance is not affected, the consequences of the accident are
not increased.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The design of the RWST and the SFP [Spent Fuel Pool]
Purification Loop has been revised to allow recirculation and
purification using the BARS for a short period of time (not to
exceed 30 days per fuel cycle) for the next fuel cycle. The BARS
takes RWST water in and processes it out without additional
connections that could affect other systems and without an impact
from its installation. Procedures for the operation of the plant,
including the BARS, will not create the possibility of a new or
different type of accident. Contingent upon manual operator action,
a BARS line break will not result in a loss of the RWST safety
function. Similarly, an active or passive failure in the BARS will
not affect safety related structures, systems or components.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The SFP Purification Loop and recirculation and purification of
the RWST water using the BARS is not credited for safe shutdown of
the plant or accident mitigation. RWST volume will be maximized
prior to purification and timely operator action can be taken to
isolate the non-seismic system from the RWST to assure it can
perform its function. This will result in no significant reduction
in the margin of safety.
Therefore the proposed change does not significantly reduce the
margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Jeanne Cho, Assistant General Counsel,
Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, White Plains, NY
10601.
NRC Branch Chief: James G. Danna.
FirstEnergy Nuclear Operating Company, et al., Docket Nos. 50-334 and
50-412, Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, Beaver
County, Pennsylvania
Date of amendment request: April 9, 2017. A publicly-available
version is in ADAMS under Accession No. ML17100A269.
Description of amendment request: The amendments would revise
Technical Specification (TS) Section 4.2.1, ``Fuel Assemblies,'' and
Section 5.6.3, ``Core Operating Limits Report (COLR),'' to allow the
use of Optimized ZIRLO\TM\ as an approved fuel rod cladding material.
In the letter dated April 9, 2017, the licensee also requested an
exemption from certain requirements of 10 CFR 50.46 and 10 CFR part 50,
appendix K, in accordance with 10 CFR 50.12, to support the license
amendments.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment would allow the use of Optimized
ZIRLOTM clad nuclear fuel at BVPS. The NRC approved
topical report WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A,
``Optimized ZIRLO\TM\,'' prepared by Westinghouse Electric Company
LLC (Westinghouse), which addresses Optimized ZIRLOTM
fuel rod cladding and demonstrates that Optimized ZIRLOTM
fuel rod cladding has essentially the same properties as currently
licensed ZIRLO[supreg] fuel rod cladding. The use of Optimized
ZIRLOTM fuel rod cladding material will not result in
adverse changes to the operation or configuration of the facility.
The fuel cladding itself is not an accident initiator and does not
affect accident probability. The correction of a typographical
error, the addition of a word for clarification of the TS, and the
addition of a registered trademark designator are administration
changes and do not affect the fuel cladding design. Use of Optimized
ZIRLOTM meets the fuel design acceptance criteria and
hence does not significantly affect the consequences of an accident.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The use of Optimized ZIRLOTM fuel rod cladding
material will not result in adverse changes to the operation or
configuration of the facility. The correction of a typographical
error, the addition of a word for clarification of the TS, and the
addition of a registered trademark designator are administration
changes and do not affect the fuel cladding design. Topical Report
WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A demonstrated that the
material properties of Optimized ZIRLOTM fuel rod
cladding are similar to those of ZIRLO[supreg] fuel rod cladding.
Therefore, Optimized ZIRLOTM fuel rod cladding will
perform similarly to ZIRLO[supreg] fuel rod cladding, thus
precluding the possibility of the fuel rod cladding becoming an
accident initiator and causing a new or different kind of accident.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed amendment will not involve a significant reduction
in the margin of safety. NRC-approved Topical Report WCAP-12610-P-A
& CENPD-404-P-A, Addendum 1-A, demonstrated that the material
properties of the Optimized ZIRLOTM fuel rod cladding are
similar to those of ZIRLO[supreg] fuel rod cladding. Optimized
ZIRLOTM fuel rod cladding is expected to perform
similarly to ZIRLO[supreg] fuel rod cladding for normal
[[Page 32882]]
operating and accident scenarios, including both loss-of-coolant
accident (LOCA) and non-LOCA scenarios. The use of Optimized
ZIRLOTM fuel rod cladding will not result in adverse
changes to the operation or configuration of the facility. The
correction of a typographical error, the addition of a word for
clarification of the TS, and the addition of a registered trademark
designator are administration changes that do not affect the fuel
cladding design.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: David W. Jenkins, FirstEnergy Nuclear
Operating Company, FirstEnergy Corporation, 76 South Main Street,
Akron, OH 44308.
NRC Branch Chief: James G. Danna.
South Carolina Electric & Gas Company, Docket Nos. 52-027 and 52-028,
Virgil C. Summer Nuclear Station, Units 2 and 3, Fairfield County,
South Carolina
Date of amendment request: June 12, 2017. A publicly-available
version is in ADAMS under Accession No. ML17164A191.
Description of amendment request: The requested amendments propose
changes to the Updated Final Safety Analysis Report in the form of
departures from the plant-specific Design Control Document (DCD) Tier 2
information, and involve changes to related plant-specific DCD Tier 1
information, with corresponding changes to the associated combined
license (COL) Appendix C information. In addition, revisions are
proposed to COL Appendix A, Technical Specifications. The proposed
changes revise the COLs concerning standardizing the Protection and
Safety Monitoring System (PMS) setpoint nomenclature. No changes are
proposed to setpoint values or PMS alarms and actuations. Pursuant to
the provisions of 10 CFR 52.63(b)(1), an exemption from elements of the
design as certified in the 10 CFR part 52, appendix D, Design
Certification Rule, is also requested for the plant-specific Tier 1
departures.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
No setpoint values or PMS actuations are proposed to be changed
by this activity. Nor are any values assumed in the safety analysis
changed. This is an administrative change to standardize the PMS
setpoint designators. The proposed amendment does not affect the
prevention and mitigation of abnormal events, e.g., accidents,
anticipated operation occurrences, earthquakes, floods, turbine
missiles, and fires or their safety or design analyses. This change
does not involve containment of radioactive isotopes or any adverse
effect on a fission product barrier. There is no impact on
previously evaluated accidents.
These proposed changes have no adverse impact on the support,
design, or operation of mechanical and fluid systems. The response
of systems to postulated accident conditions is not adversely
affected and remains within response time assumed in the accident
analysis. There is no change to the predicted radioactive releases
due to normal operation or postulated accident conditions.
Consequently, the plant response to previously evaluated accidents
or external events is not adversely affected, nor does the proposed
change create any new accident precursors.
Therefore, the requested amendment does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes do not involve a new failure mechanism or
malfunction, which affects [a structure, system, component (SSC)]
accident initiator, or interface with any SSC accident initiator or
initiating sequence of events considered in the design and licensing
bases. There is no adverse effect on radioisotope barriers or the
release of radioactive materials. The proposed amendment does not
adversely affect any accident, including the possibility of creating
a new or different kind of accident from any accident previously
evaluated.
Therefore, the proposed changes do not create the possibility of
a new or different type of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
No setpoint values or PMS actuations are proposed to be changed
by this activity. This is an administrative change to standardize
the PMS setpoint designators. The proposed changes would not affect
any safety-related design code, function, design analysis, safety
analysis input or result, or existing design/safety margin. No
safety analysis or design basis acceptance limit/criterion is
challenged or exceeded by the requested changes.
Therefore the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
NRC Branch Chief: Jennifer Dixon-Herrity.
South Carolina Electric & Gas Company, Docket Nos. 52-027 and 52-028,
Virgil C. Summer Nuclear Station, Units 2 and 3, Fairfield County,
Georgia
Date of amendment request: June 9, 2017. A publicly-available
version is in ADAMS under Accession No. ML17163A174.
Description of amendment request: The requested amendments propose
changes to combined license (COL) Appendix C (and plant-specific Tier
1) Table 2.7.2-2 to revise the minimum chilled water flow rates to the
supply air handling units serving the Main Control Room and the Class
1E electrical rooms, and the unit coolers serving the normal residual
heat removal system and chemical and volume control system pump rooms.
The proposed COL Appendix C (and plant-specific Design Control Document
(DCD) Tier 1) changes require additional changes to corresponding Tier
2 component data information in Updated Final Safety Analysis Report
Chapters 6 and 9. Because this proposed change requires a departure
from Tier 1 information in the Westinghouse Electric Company's AP1000
DCD, the licensee also requested an exemption from the requirements of
the Generic DCD Tier 1 in accordance with 10 CFR 52.63(b)(1).
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes to COL Appendix C (and plant-specific Tier
1) Table 2.7.2-2, Updated Final Safety Analysis Report (UFSAR) Table
9.2.7-1, and associated UFSAR design information to identify the
revised equipment parameters for the nuclear island nonradioactive
ventilation system (VBS) air handling units (AHUs) and
radiologically controlled area (RCA) ventilation system (VAS) unit
coolers and reduced chilled water system (VWS) cooling coil flow
rates does not adversely impact the
[[Page 32883]]
plant response to any accidents which are previously evaluated. The
function of the cooling coils to provide chilled water to the VBS
AHUs and VAS unit coolers is not credited in the safety analysis.
No safety-related structure, system, component (SSC) or function
is adversely affected by this change. The change does not involve an
interface with any SSC accident initiator or initiating sequence of
events, and thus, the probabilities of the accidents evaluated in
the plant-specific UFSAR are not affected. The proposed changes do
not involve a change to the predicted radiological releases due to
postulated accident conditions, thus, the consequences of the
accidents evaluated in the UFSAR are not affected. The proposed
changes do not increase the probability or consequences of an
accident previously evaluated as the VWS, VBS and VAS do not provide
safety-related functions and the functions of each system to support
required room environments are not changed.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes to COL Appendix C (and plant-specific Tier
1) Table 2.7.2-2, UFSAR Table 9.2.7-1, and associated UFSAR design
information to identify the revised equipment parameters for VBS
AHUs and VAS unit coolers and reduced VWS cooling coil flow rates do
not affect any safety-related equipment, and do not add any new
interfaces to safety-related SSCs. The VWS function to provide
chilled water is not adversely impacted. The function of the VAS to
provide ventilation and cooling to maintain the environment of the
serviced areas within the design temperature range is not adversely
impacted by this change. No system or design function or equipment
qualification is affected by these changes as the change does not
modify the operation of any SSCs. The changes do not introduce a new
failure mode, malfunction or sequence of events that could affect
safety or safety-related equipment. Revised equipment parameters,
including the reduced cooling coil flow rates, do not adversely
impact the function of associated components.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The changes to COL Appendix C (and plant-specific Tier 1) Table
2.7.2-2, UFSAR Table 9.2.7-1, and associated UFSAR design
information do not affect any other safety-related equipment or
fission product barriers. The requested changes will not adversely
affect compliance with any design code, function, design analysis,
safety analysis input or result, or design/safety margin. No safety
analysis or design basis acceptance limit/criterion is challenged or
exceeded by the requested changes as previously evaluated accidents
are not impacted.
Therefore, the proposed amendment does not involve a significant
reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius, LLC, 1111 Pennsylvania NW., Washington, DC 20004-2514.
NRC Branch Chief: Jennifer Dixon-Herrity.
Southern Nuclear Operating Company, Inc., Docket Nos. 50-424 and 50-
425, Vogtle Electric Generating Plant, Units 1 and 2, Burke County,
Georgia
Date of amendment request: May 24, 2017. A publicly-available
version is in ADAMS under Accession No. ML17144A408.
Description of amendment request: The amendments would revise
Surveillance Requirement 3.3.1.3 to change the thermal power at which
the surveillance may be performed.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment to the TS [Technical Specification] does
not affect the initiators of any analyzed accident. In addition,
operation in accordance with the proposed amendment to the TS
ensures that the previously evaluated accidents will continue to be
mitigated as analyzed. The proposed amendment does not adversely
affect the design function or operation of any structures, systems,
and components important to safety.
The probability or consequences of accidents previously
evaluated in the UFSAR [Updated Final Safety Analysis Report] are
unaffected by this proposed amendment because there is no change to
any equipment response or accident mitigation scenario. There are no
new or additional challenges to fission product barrier integrity.
Therefore, it is concluded that the proposed amendment does not
involve a significant increase in the probability or consequences of
an accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
The proposed amendment does not involve a physical alteration of
the plant (no new or different type of equipment will be installed).
The proposed amendment does not create any new failure modes for
existing equipment or any new limiting single failures. The proposed
amendment does not involve a change in the methods governing normal
plant operation and all safety functions will continue to perform as
previously assumed in accident analyses. Thus, the proposed
amendment does not adversely affect the design function or operation
of any structures, systems, and components important to safety.
No new accident scenarios, failure mechanisms, or limiting
single failures are introduced due to the proposed amendment. The
proposed amendment does not challenge the performance or integrity
of any safety-related system.
Therefore, it is concluded that the proposed amendment does not
create the possibility of a new or different kind of accident from
any previously evaluated.
3. Does the proposed changes involve a significant reduction in
a margin of safety?
The margin of safety associated with the acceptance criteria of
any accident is unchanged. The proposed amendment will have no
affect on the availability, operability, or performance of the
safety-related systems and components. No change is being made to
the requirement to perform the surveillance. The NOTE in the
surveillance is being changed to clarify when the initial
surveillance after refueling is to be performed. The Technical
Specification Limiting Condition for Operation (LCO) limits are not
being changed.
The proposed amendment will not adversely affect the operation
of plant equipment or the function of equipment assumed in the
accident analysis.
Therefore, it is concluded that the proposed amendment does not
involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Jennifer M. Buettner, Associate General
Counsel, Southern Nuclear Operating Company, 40 Iverness Center
Parkway, Birmingham, AL 35242.
NRC Branch Chief: Michael T. Markley.
Southern Nuclear Operating Company, Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia
Date of amendment request: May 5, 2017. A publicly-available
version is in ADAMS under Accession No. ML17128A120.
[[Page 32884]]
Description of amendment request: The requested amendments propose
changes to more clearly define the boundaries and seismic requirements
for the portion of the fire protection system (FPS) piping that is
required to remain functional following a safe shutdown earthquake
(SSE) (i.e., the ``seismic standpipe system''). The proposed changes
also include the removal of SSE requirements from pipe lines that do
not need to remain functional following an SSE (specifically, the FPS
piping that is part of the non-seismic FPS containment spray system and
the FPS open tray system).
Pursuant to the provisions of 10 CFR 52.63(b)(1), an exemption from
elements of the design as certified in the 10 CFR part 52, appendix D,
design certification rule is also requested for the plant-specific
Design Control Document Tier 1 material departures.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed modification changes would clarify the boundaries
for the portion of the nonsafety-related FPS required to remain
functional following a SSE for manual firefighting in areas with SSE
equipment, and the addition of two new open-nozzle suppression
systems with associated system isolation valves to provide adequate
spray coverage to accommodate the final cable tray location,
configuration and quantity. These changes do not affect any accident
initiating event or component failure, thus the probabilities of the
accidents previously evaluated are not adversely affected. No
function used to mitigate a radioactive material release and no
radioactive material release source term is involved, thus the
radiological releases in the accident analyses are not adversely
affected. Therefore, the proposed amendment does not involve an
increase in the probability or consequences of an accident
previously evaluated.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed clarification of the boundaries for the portion of
the nonsafety-related FPS required to remain functional following a
SSE for manual firefighting in areas with equipment required for
safe shutdown following an SSE does not affect the operation of any
systems or equipment that may initiate a new or different kind of
accident, or alter any SSC such that a new accident initiator or
initiating sequence of events is created. The proposed changes
affect the physical design and operation of the FPS, including as-
installed inspections, testing, and maintenance requirements, as
described in the Updated Final Safety Analysis Report (UFSAR) due to
the addition of two open-nozzle suppression systems with associated
system isolation valves. However, the additional open-nozzle
suppression systems with associated system isolation valves are
similar in design and function as the existing cable tray
suppression systems and raceway covers. Therefore, the operation of
the FPS is not affected. These proposed changes do not adversely
affect any other SSC design functions or methods of operation in a
manner that results in a new failure mode, malfunction, or sequence
of events that affect safety-related or nonsafety-related equipment.
Therefore, this activity does not allow for a new fission product
release path, result in a new fission product barrier failure mode,
or create a new sequence of events that results in significant fuel
cladding failures.
Therefore, the requested amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed clarification of the boundaries for the portion of
the FPS required to remain functional following a SSE, and the
addition of two new open-nozzle suppression systems with associated
system isolation valves do not affect any safety or accident
analysis as the FPS is a nonsafety-related system. The only function
of the FPS following a design basis earthquake is to provide water
for hose valves for manual firefighting in safe shutdown equipment
areas. The proposed changes continue to meet the existing design
basis, design function, regulatory criterion, or analyses.
Therefore, the proposed changes satisfy the same design functions in
accordance with the codes and standards currently stated in the
UFSAR. These changes do not adversely affect any design code,
function, design analysis, safety analysis input or result, or
design/safety margin. No safety analysis or design basis acceptance
limit/criterion is challenged or exceeded by the proposed changes,
and no margin of safety is reduced.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP,
1710 Sixth Avenue, North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer Dixon-Herrity.
Southern Nuclear Operating Company, Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia
Date of amendment request: May 9, 2017. A publicly-available
version is in ADAMS under Accession No. ML17129A608.
Description of amendment request: The requested amendments propose
to depart from approved AP1000 Design Control Document (DCD) Tier 2
information (text, tables, and figures) as incorporated into the
Updated Final Safety Analysis Report (UFSAR) as plant-specific DCD
information, and also propose to depart from involved plant-specific
Tier 1 information (and associated combined license (COL) Appendix C
information) and from involved plant-specific Technical Specifications
as incorporated in Appendix A of the COL. Specifically, the proposed
amendments would revise the licensing basis information to reflect
design changes to the main control room emergency habitability system
(VES) to address the main control room envelope temperature response.
Pursuant to the provisions of 10 CFR 52.63(b)(1), an exemption from
elements of the design as certified in the 10 CFR part 52, appendix D,
design certification rule is also requested for the plant-specific DCD
Tier 1 material departures.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes do not affect the operation of any systems
or equipment that initiate an analyzed accident or alter any
structures, systems, and components (SSCs) accident initiator or
initiating sequence of events. The VES design changes involve: (1)
Addition of an automatic and manual, Class 1E, electrical load shed
of nonessential nonsafety-related equipment within the main control
room envelope (MCRE); and (2) adding a description of the
requirements for maintaining habitability of the MCRE beyond 72
hours following a Design Basis Accident to the design and licensing
basis. Neither planned or inadvertent operation nor failure of the
VES is an accident initiator or part of an initiating sequence of
events for an accident previously evaluated. For example, if VES
actuation occurs from a loss of power
[[Page 32885]]
to the plant in a station blackout condition, the additional added
features including Wall Panel Information System displays would not
be available regardless of the load shed feature. This condition was
originally evaluated as part of the AP1000 design certification and
no changes are proposed to the plant station blackout response. No
additional re-evaluation of other probability or consequences from
failures are required to support this change. Therefore, the
probabilities of the accidents evaluated in the UFSAR are not
affected.
The proposed changes do not have an adverse impact on the
ability of the VES to perform its design functions. The design of
the VES continues to meet the same regulatory acceptance criteria,
codes, and standards as required by the UFSAR. In addition, the
changes maintain the capability of the VES to mitigate the
consequences of an accident in conformance with the applicable
regulatory acceptance criteria, and there is no adverse effect on
any safety-related SSC or function used to mitigate an accident. The
changes do not affect the prevention and mitigation of other
abnormal events, e.g., anticipated operational occurrences,
earthquakes, floods and turbine missiles, or their safety or design
analyses. Therefore, the consequences of the accidents evaluated in
the UFSAR are not affected.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes do not affect the operation of any systems
or equipment that may initiate a new or different kind of accident,
or alter any SSC such that a new accident initiator or initiating
sequence of events is created. The VES design changes involve: (1)
Addition of an automatic and manual, Class 1E, electrical load shed
of nonessential nonsafety-related equipment within the MCRE; and (2)
adding a description of the requirements for maintaining
habitability of the MCRE beyond 72 hours following a DBA to the
design and licensing basis. Although a new failure mode of the VES
is created by the addition of the MCR Load Shed Panels, neither
planned nor inadvertent operation nor failure of the VES is an
accident initiator or part of an initiating sequence of events for a
new or different kind of accident. In addition, these proposed
changes do not adversely affect any other VES or SSC design
functions or methods of operation in a manner that results in a new
failure mode, malfunction, or sequence of events that affect safety-
related or nonsafety-related equipment. Therefore, this activity
does not allow for a new fission product release path, result in a
new fission product barrier failure mode, or create a new sequence
of events that result in significant fuel cladding failures.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The changes to the VES description and associated COL Appendix A
Technical Specification changes provide continued verification that;
the VES design functions to maintain heat loads inside the MCRE
within design-basis assumptions to limit the heat up of the room, a
72-hour supply of breathable-quality air for the occupants of the
MCRE is readily available, and the MCRE pressure boundary is
maintained at a positive pressure with respect to the surrounding
areas. The changes support the system's intended design functions
and continue to meet the regulatory requirements for protecting
public health and safety.
The proposed changes also maintain existing safety margins. The
proposed changes do not adversely affect VES design requirements and
design functions. The proposed changes maintain existing safety
margin through continued application of the existing requirements of
the UFSAR, while adding additional design features and controls that
maintain VES design functions required to meet the existing safety
margins. Therefore, the proposed changes satisfy the same design
functions in accordance with the same codes and standards as stated
in the UFSAR. These changes do not adversely affect any design code,
function, design analysis, safety analysis input or result, or
design/safety margin.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP,
1710 Sixth Avenue, North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer Dixon-Herrity.
Union Electric Company, Docket No. 50-483, Callaway Plant, Unit 1,
Callaway County, Missouri
Date of amendment request: April 6, 2017. A publicly-available
version is in ADAMS under Accession No. ML17097A425.
Description of amendment request: The amendment would revise the
Final Safety Analysis Report (FSAR) to allow bypassing of thermal
overload protection during motor-operated valve surveillance testing.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
Keeping the thermal overload protection (TOP) devices bypassed
during surveillance testing does not introduce the possibility of a
change in the frequency of an accident because failure of a single
safety-related motor-operated valve (MOV) is not, by itself, an
initiator of any previously evaluated design basis accident. Valves
are active components that either position to ``open'' or ``close''
as required to fulfill safety functions. As such, safety-related
MOVs are subject to single active failures, but such failures are
not accident initiators. (For safety-related systems, redundancy in
the design ensures that failure of a valve to open or to close on
demand, as applicable, will not prevent fulfillment of the safety
function(s). However, the associated safety functions are for
accident mitigation/response, and while an MOV failure can affect
such functions (without loss of the overall function), a single MOV
failure cannot by itself initiate any accident previously evaluated
in the FSAR.)
Furthermore, the change does not result in an increase in the
consequences of an accident previously evaluated in the FSAR. The
proposed change would permit MOV TOP devices to remain bypassed
during surveillance stroke testing but not during valve maintenance.
In regard to the bypassing of TOP devices during testing, the
potential for valve damage is of greater concern during valve
maintenance activities (when work has been done on the affected
valve(s)) than it is for surveillance stroke tests. It may be
assumed that the low probability of valve damage resulting from--or
occurring during--surveillance valve stroke tests (with the TOP
devices bypassed) does not change the single-failure assumptions
already considered in the plant's design and accident analyses. As
previously noted, redundancy in the design of safety-related systems
ensures that failure of a valve to open or close on demand, as
applicable, will not prevent fulfillment of the safety function(s).
Accordingly, it may be concluded that the provisions for bypassing
TOP devices during MOV surveillance testing does not require any
changes to assumptions regarding MOV availability, single-failure
protection, or the associated systems' capabilities for performing
accident mitigation functions. With no changes to such assumptions,
the proposed change does not result in more than a minimal increase
in the consequences of an accident previously evaluated in the FSAR.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
NRC [RG] 1.106, Revision 1 [``Thermal Overload Protection for
Electric Motors on Motor-Operated Valves''], requires the removal of
MOV thermal overload relay bypass jumpers during both maintenance
and
[[Page 32886]]
periodic tests. The regulatory guide's position is that having the
thermal overload protection enabled during periodic tests of an MOV
is desired to prevent valve motor damage. The concern is that the
motor may be damaged if the thermal overload protection is not in
force.
Keeping the [TOP] devices bypassed during surveillance testing
does not introduce the possibility of an accident of a different
type than any previously evaluated in the FSAR. Although there could
be a slight increase in the probability of valve damage due to the
proposed change, any such failure would not be of a different kind
or nature than what may already be experienced by an MOV. Thus, no
new failure modes or initiators of a different type of accident are
introduced. The single active failure of a[n] [MOV] is already
considered in the accident analysis assumptions described in the
FSAR, and the failure of a single MOV is not by itself an accident
initiator.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
No, this change does not affect design basis limits for a
fission product barrier. No changes to the accident analyses,
including any associated assumptions, are required or being made for
the proposed change. Because of redundancy incorporated into the
plant design (for single-failure protection), the failure of a
single [MOV] will not result in the loss of any overall safety
function.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: John O'Neill, Esq., Pillsbury Winthrop Shaw
Pittman LLP, 2300 N Street NW., Washington, DC 20037.
NRC Branch Chief: Robert J. Pascarelli.
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant hazards consideration determination, and opportunity for a
hearing in connection with these actions, was published in the Federal
Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation, and/or Environmental Assessment, as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
Duke Energy Florida, Inc., et al., Docket No. 50-302, Crystal River
Unit 3 Nuclear Generating Plant, Citrus County, Florida
Date of amendment request: December 9, 2016.
Brief description of amendment: The amendment approved the removal
of the existing cyber security license condition from the facility
operating license.
Date of issuance: June 22, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment No.: 254. A publicly-available version is in ADAMS under
Package Accession No. ML17096A279; documents related to this amendment
are listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. DPR-72: The amendment revised the
license.
Date of initial notice in Federal Register: January 31, 2017 (82 FR
8868).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 22, 2017.
No significant hazards consideration comments received: No.
Duke Energy Florida, Inc., et al., Docket No. 50-302, Crystal River
Unit 3 (CR-3) Nuclear Generating Plant, Citrus County, Florida
Date of amendment request: August 31, 2016.
Brief description of amendment: The amendment approved an amendment
to the CR-3 Facility Operating License and the Permanently Defueled
Technical Specifications to reflect removal of all CR-3 spent nuclear
fuel from the spent fuel pools and its transfer to dry cask storage
within the independent spent fuel storage installation (ISFSI).
Date of issuance: June 27, 2017.
Effective date: The date Duke Energy Florida, LLC submits written
notification that all spent fuel has been transferred from the spent
fuel pool to the ISFSI and shall be implemented within 60 days.
Amendment No.: 255.
Facility Operating License No. DPR-72: The amendment revised the
license.
Date of initial notice in Federal Register: October 25, 2016 (81 FR
73432).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 27, 2017.
No significant hazards consideration comments received: No.
Energy Northwest, Docket No. 50-397, Columbia Generating Station,
Benton County, Washington
Date of amendment request: July 12, 2016, as supplemented by letter
dated November 17, 2016.
Brief description of amendment: The amendment reduced the minimum
reactor dome pressure associated with the critical power correlation
from 785 pounds per square inch gauge (psig) to 686 psig in Technical
Specification 2.1.1, ``Reactor Core SLs [Safety Limits],'' and
associated bases.
Date of issuance: June 27, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 242. A publicly-available version is in ADAMS under
Accession No. ML17131A071; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-21: The amendment
revised the Renewed Facility Operating License and Technical
Specifications.
Date of initial notice in Federal Register: The license amendment
request was originally noticed in the Federal Register on October 25,
2016 (81 FR 73433). Subsequently, by letter dated November 17, 2016,
the licensee
[[Page 32887]]
provided additional information that expanded the scope of the
amendment request as originally noticed in the Federal Register.
Accordingly, the NRC published a second proposed no significant hazards
consideration determination in the Federal Register on April 25, 2017
(82 FR 19102), which superseded the original notice in its entirety.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 27, 2017.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket No. 50-333, James A. FitzPatrick
Nuclear Power Plant, Oswego County, New York
Date of amendment request: May 19, 2017. A publicly-available
version is in ADAMS under Accession No. ML17139C739.
Brief description of amendment: The amendment revised the Emergency
Action Level HU1.5 for James A. FitzPatrick Nuclear Power Plant by
replacing the phrase ``Lake water level >249.2 ft'' with the phrase ``A
hazardous event that results in on-site conditions sufficient to
prohibit the plant staff from accessing the site via personal
vehicles.''
Date of issuance: June 30, 2017.
Effective date: As of the date of issuance, and shall be
implemented within 30 days of issuance.
Amendment No.: 315. A publicly-available version is in ADAMS under
Accession No. ML17153A018; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-59: The amendment
revised the Renewed Facility Operating License.
Date of initial notice in Federal Register: May 30, 2017 (82 FR
24742).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 30, 2017.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. 50-220 and 50-410, Nine
Mile Point Nuclear Station, Units 1 and 2, Oswego County, New York
Date of amendment request: May 19, 2017. A publicly-available
version is in ADAMS under Accession No. ML17139C739.
Brief description of amendments: The amendments revised the
Emergency Action Level HU1.5 for Nine Mile Point Nuclear Station, Units
1 and 2, by replacing the phrase ``Lake water level >249.3 ft'' with
the phrase ``A hazardous event that results in on-site conditions
sufficient to prohibit the plant staff from accessing the site via
personal vehicles.''
Date of issuance: June 30, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 228 (Unit 1) and 162 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML17152A320; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Renewed Facility Operating License Nos. DPR-63 and NPF-69:
Amendments revised the Renewed Facility Operating Licenses.
Date of initial notice in Federal Register: May 30, 2017 (82 FR
24746).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 30, 2017.
No significant hazards consideration comments received: Yes. The
comment is addressed in the Safety Evaluation referenced above.
Exelon Generation Company, LLC, Docket No. 50-219, Oyster Creek Nuclear
Generating Station (Oyster Creek), Ocean County, New Jersey
Date amendment request: February 20, 2017.
Brief description of amendment: The amendment deleted from the
Oyster Creek facility operating license certain license conditions that
impose specific requirements on the decommissioning trust fund
agreement. The provisions of 10 CFR 50.75(h) that specify the
regulatory requirements for decommissioning trust funds will apply to
Oyster Creek.
Date of issuance: June 23, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment No.: 291. A publicly-available version is in ADAMS under
Accession No. ML17067A042; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-16: Amendment revised
the Facility Operating License.
Date of initial notice in Federal Register: March 28, 2017 (82 FR
15381).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 23, 2017.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket No. 50-244, R.E. Ginna Nuclear
Power Plant, Wayne County, New York
Date of amendment request: August 22, 2016.
Brief description of amendment: The amendment revised Technical
Specification 4.2.1, ``Reactor Core, Fuel Assemblies,'' and Technical
Specification 5.6.5, ``Reporting Requirements, Core Operating Limits
Report (COLR),'' paragraph b, to allow the use of Optimized
ZIRLOTM fuel cladding material. The amendment is also
supported by an exemption from certain requirements of 10 CFR 50.46 and
10 CFR part 50, appendix K,
Date of issuance: June 21, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 125. A publicly-available version is in ADAMS under
Accession No. ML17131A066; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-18: Amendment revised
the Renewed Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: November 8, 2016 (81 FR
78648).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 21, 2017.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. 50-289 and 50-320, Three
Mile Island Nuclear Station, Units 1 and 2, Dauphin County,
Pennsylvania
Date of amendment request: July 15, 2016, as supplemented by letter
dated February 13, 2017.
Brief description of amendment: The amendment approved changes to
the emergency plan that involve on-shift emergency response staffing
modifications.
Date of issuance: June 23, 2017.
Effective date: As of the date of issuance and shall be implemented
within 90 days.
Amendment No.: 291. A publicly-available version is in ADAMS under
Accession No. ML17137A393; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-50: Amendment revised
the emergency plan.
Date of initial notice in Federal Register: The license amendment
request was originally noticed in the
[[Page 32888]]
Federal Register on October 25, 2016 (81 FR 73435). The supplement
dated February 13, 2017, expanded the scope of the application as
originally noticed; therefore, the NRC staff renoticed the application
in the Federal Register on April 11, 2017 (82 FR 17458).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 23, 2017
No significant hazards consideration comments received: No.
FirstEnergy Nuclear Operating Company, Docket No. 50-440, Perry Nuclear
Power Plant, Unit No. 1, Lake County, Ohio
Date of amendment request: October 27, 2016.
Brief description of amendment: The amendment revised Technical
Specification (TS) 3.8.3, ``Diesel Fuel Oil, Lube Oil, and Starting
Air,'' by removing the current stored diesel fuel oil and lube oil
numerical volume requirements from the TS and replacing them with
diesel operating time requirements consistent with NRC-approved
Revision 1 to Technical Specifications Task Force (TSTF) Improved
Standard Technical Specifications Change Traveler TSTF-501, ``Relocate
Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.''
Date of issuance: June 29, 2017.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 177. A publicly-available version is in ADAMS under
Accession No. ML17163A354; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-58: Amendment revised the
Facility Operating License and Technical Specifications.
Date of initial notice in Federal Register: December 20, 2016 (81
FR 92869).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 29, 2017
No significant hazards consideration comments received: No.
Nebraska Public Power District, Docket No. 50-298, Cooper Nuclear
Station (CNS), Nemaha County, Nebraska
Date of amendment request: August 26, 2016.
Brief description of amendment: The amendment revised the CNS
Technical Specifications (TSs) to eliminate TS 5.5.6, ``Inservice
Testing Program,'' to remove requirements duplicated in the American
Society of Mechanical Engineers Code for Operations and Maintenance of
Nuclear Power Plants Case OMN-20, ``Inservice Test Frequency.'' A new
defined term, ``Inservice Testing Program,'' was added to TS Section
1.1, ``Definitions.'' The licensee stated that the change to the TSs is
consistent with Technical Specifications Task Force (TSTF) Traveler
TSTF-545, Revision 3, ``TS Inservice Testing Program Removal & Clarify
SR [Surveillance Requirement] Usage Rule Application to Section 5.5
Testing,'' which was made available to the TSTF via NRC letter dated
December 11, 2015 (ADAMS Accession No. ML15317A071), with no proposed
technical variations or deviations. However, in some cases, the CNS TSs
use different section titles or numbering for SRs than the Standard
Technical Specifications on which TSTF-545 was based. The licensee
changed the TSTF-545 numbering to be consistent with the CNS TS
numbering.
Date of issuance: June 20, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 259. A publicly-available version is in ADAMS under
Accession No. ML17144A082; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-46: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: November 8, 2016 (81 FR
78649).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 20, 2017.
No significant hazards consideration comments received: No.
Northern States Power Company--Minnesota, Docket Nos. 50-282 and 50-
306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue
County, Minnesota
Date of amendment request: August 31, 2016, as supplemented by
letter dated February 16, 2017.
Brief description of amendments: The amendments revised Technical
Specification (TS) 3.8.7 by removing the site-specific Required Actions
and associated Completion Times, thus reverting to the standard TS
language contained in NUREG-1431, ``Standard Technical Specifications:
Westinghouse Plants.''
Date of issuance: June 20, 2017.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: 219 (Unit 1) and 206 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML17130A716; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Renewed Facility Operating License Nos. DPR-42 and DPR-60: The
amendments revised the Renewed Facility Operating Licenses and TSs.
Date of initial notice in Federal Register: October 25, 2016 (81 FR
73436). The supplemental letter dated February 16, 2017, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 20, 2017.
No significant hazards consideration comments received: No.
PSEG Nuclear LLC and Exelon Generation Company, LLC, Docket Nos. 50-272
and 50-311, Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem
Units 1 and 2), Salem County, New Jersey
Date of amendment request: August 30, 2016.
Brief description of amendments: The amendments approved adoption
of NRC-approved Technical Specifications Task Force (TSTF) Improved
Standard Technical Specifications Change Traveler TSTF-545, Revision 3,
``TS Inservice Testing Program Removal & Clarify SR [Surveillance
Requirement] Usage Rule Application to Section 5.5 Testing,'' dated
October 21, 2015. Specifically, the amendments deleted the Salem Units
1 and 2 Technical Specification (TS) Section 6.8.4.j, ``Inservice
Testing Program,'' and added a new defined term, ``INSERVICE TESTING
PROGRAM,'' to the TSs. All existing references to the ``Inservice
Testing Program'' in the Salem Units 1 and 2 TS SRs are replaced with
``INSERVICE TESTING PROGRAM'' so that the SRs refer to the new
definition in lieu of the deleted program.
Date of issuance: June 28, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 319 (Unit No. 1) and 300 (Unit No. 2). A publicly-
available version is in ADAMS under Accession No. ML17165A214;
documents related to these amendments are listed in the Safety
Evaluation enclosed with the amendments.
[[Page 32889]]
Renewed Facility Operating License Nos. DPR-70 and DPR-75: The
amendments revised the Renewed Facility Operating Licenses and TSs.
Date of initial notice in Federal Register: November 8, 2016 (81 FR
78651).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 28, 2017.
No significant hazards consideration comments received: No.
PSEG Nuclear LLC, Docket No. 50-354, Hope Creek Generating Station
(Hope Creek), Salem County, New Jersey
Date of amendment request: July 20, 2016.
Brief description of amendment: The amendment approved adoption of
NRC-approved Technical Specifications Task Force (TSTF) Improved
Standard Technical Specifications Change Traveler TSTF-545, Revision 3,
``TS Inservice Testing Program Removal & Clarify SR [Surveillance
Requirement] Usage Rule Application to Section 5.5 Testing,'' dated
October 21, 2015. Specifically, the amendment deleted the Hope Creek
Technical Specification (TS) Section 6.8.4.i, ``Inservice Testing
Program,'' and added a new defined term, ``INSERVICE TESTING PROGRAM,''
to the TSs. All existing references to the ``Inservice Testing
Program'' in the Hope Creek TS SRs are replaced with ``INSERVICE
TESTING PROGRAM'' so that the SRs refer to the new definition in lieu
of the deleted program.
Date of issuance: June 28, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 205. A publicly-available version is in ADAMS under
Accession No. ML17164A355; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-57: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: October 25, 2016 (81 FR
73437).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 28, 2017.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Alabama Power Company, Docket Nos.
50-348 and 50-364, Joseph M. Farley Nuclear Plant (Farley), Units 1 and
2, Houston County, Alabama
Southern Nuclear Operating Company, Inc., Georgia Power Company,
Oglethorpe Power Corporation, Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50-424 and 50-425, Vogtle Electric
Generating Plant (Vogtle), Units 1 and 2, Burke County, Georgia
Southern Nuclear Operating Company, Inc., Georgia Power Company,
Oglethorpe Power Corporation, Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50-321 and 50-366, Edwin I. Hatch
Nuclear Plant (Hatch), Unit Nos. 1 and 2, Appling County, Georgia
Date of amendment request: December 1, 2016.
Brief description of amendments: The amendments modified the
Technical Specification (TS) requirements in Section 1.3 and Section
3.0 regarding Limiting Conditions for Operation (LCO) and Surveillance
Requirement (SR) usage. The changes are consistent with NRC-approved
Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision
4, ``Clarify Use and Application Rules.''
Date of issuance: June 27, 2017.
Effective date: As of the date of issuance and shall be implemented
within 90 days of issuance.
Amendment Nos.: Farley--211 (Unit 1) and 208 (Unit 2); Vogtle--187
(Unit 1) and 168 (Unit 2); and Hatch--285 (Unit No. 1) and 230 (Unit
No. 2). A publicly-available version is in ADAMS under Accession No.
ML17137A041; documents related to these amendments are listed in the
Safety Evaluation enclosed with the amendments.
Renewed Facility Operating License Nos. NPF-2, NPF-8, NPF-68, NPF-
81, DPR-57, and NPF-5: Amendments revised the Renewed Facility
Operating Licenses and TSs.
Date of initial notice in Federal Register: February 28, 2017 (82
FR 12135).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 27, 2017.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Inc., Docket Nos. 50-348 and 50-
364, Joseph M. Farley Nuclear Plant (Farley), Units 1 and 2, Houston
County, Alabama
Southern Nuclear Operating Company, Inc., Docket Nos. 50-424 and 50-
425, Vogtle Electric Generating Plant (Vogtle), Units 1 and 2, Burke
County, Georgia
Southern Nuclear Operating Company, Inc., Georgia Power Company,
Oglethorpe Power Corporation, Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50-321 and 50-366, Edwin I. Hatch
Nuclear Plant (Hatch), Unit Nos. 1 and 2, Appling County, Georgia
Date of amendment request: July 28, 2016.
Brief description of amendments: The amendments modified the
technical specifications (TSs) to eliminate Section 5.5.8, ``Inservice
Testing Program,'' for Farley and Vogtle, and eliminate Section 5.5.6,
``Inservice Testing Program,'' for Hatch. A new defined term,
``Inservice Testing Program,'' is added to the TS Definitions section.
This request is consistent with Technical Specifications Task Force
(TSTF) Traveler TSTF-545, Revision 3, ``TS Inservice Testing Program
Removal & Clarify SR [Surveillance Requirement] Usage Rule Application
to Section 5.5 Testing''.
Date of issuance: June 30, 2017.
Effective date: As of the date of issuance and shall be implemented
within 120 days of issuance.
Amendment Nos.: Farley--212 (Unit 1) and 209 (Unit 2); Vogtle--187
(Unit 1) and 170 (Unit 2); and Hatch--286 (Unit No. 1) and 231 (Unit
No. 2). A publicly-available version is in ADAMS under Accession No.
ML17152A218; documents related to these amendments are listed in the
Safety Evaluation enclosed with the amendments.
Renewed Facility Operating License Nos. NPF-2, NPF-8, NPF-68, NPF-
81, DPR-57, and NPF-5: Amendments revised the Renewed Facility
Operating Licenses and TSs.
Date of initial notice in Federal Register: September 27, 2016 (81
FR 66309).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 30, 2017.
No significant hazards consideration comments received: No.
[[Page 32890]]
Southern Nuclear Operating Company, Inc., Docket Nos. 52-025 and 50-
026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County,
Georgia
Date of amendment request: August 29, 2016, as supplemented by
letter dated February 13, 2017.
Brief description of amendments: The amendments changed Combined
License Nos. NPF-91 and NPF-92 for the Vogtle Electric Generating
Plant, Units 3 and 4. The amendments changed the Updated Final Safety
Analysis Report (UFSAR) in the form of departures from the incorporated
plant-specific Design Control Document (DCD) Tier 2* information.
Specifically, the amendment proposed changes to demonstrate the quality
and strength of a specific population of welds between stainless steel
mechanical couplers (couplers) and embedment plates that did not
receive the nondestructive examinations required by the American
Institute of Steel Construction N690-1994, ``Specification for the
Design, Fabrication, and Erection of Steel Safety-Related Structures
for Nuclear Facilities.'' Since some of these coupler welds are already
installed and embedded in concrete, the licensee proposed to
demonstrate the adequacy of these inaccessible coupler welds through
previously-performed visual testing examinations of the couplers and
static tension testing of a representative sample of accessible,
uninstalled couplers produced concurrently with those already
installed.
Date of issuance: June 27, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 80 (Unit 3) and 79 (Unit 4). A publicly-available
version is in ADAMS under Package Accession No. ML17107A275; documents
related to these amendments are listed in the Safety Evaluation
enclosed with the amendments.
Facility Operating License No. NPF-91 and NPF-92: Amendments
revised the UFSAR in the form of departures from the incorporated
plant-specific DCD Tier 2* information.
Date of initial notice in Federal Register: November 8, 2017 (81 FR
78666). The supplement, dated February 13, 2017, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed, and did not change the NRC
staff's original proposed no significant hazards consideration
determination.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 27, 2017.
No significant hazards consideration comments received: No.
Tennessee Valley Authority, Docket Nos. 50-390 and 50-391, Watts Bar
Nuclear Plant, Units 1 and 2, Rhea County, Tennessee
Date of amendment request: October 17, 2016, as supplemented by
letter dated March 6, 2017.
Brief description of amendments: The amendments revised selected
Technical Specification (TS) Surveillance Requirements (SRs) for
alternating current electrical sources because of delays in the startup
of Watts Bar Nuclear Plant, Unit 2. Specifically, the amendments
revised the TSs to permit a one-time extension of the specified 18-
month interval for performing the required SRs.
Date of issuance: June 28, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment Nos.: 114 (Unit 1) and 12 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML17138A100; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Facility Operating License Nos. NPF-90 and NPF-96: Amendments
revised the Facility Operating Licenses and TSs.
Date of initial notice in the Federal Register: February 28, 2017
(82 FR 12138). The supplemental letter dated March 6, 2017, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 28, 2017.
No significant hazards consideration comments received: No.
TEX Operations Company LLC, Docket Nos. 50-445 and 50-446, Comanche
Peak Nuclear Power Plant (CPNPP), Unit Nos. 1 and 2, Somervell County,
Texas
Date of amendment request: December 14, 2016.
Brief description of amendments: The amendments revised the
licensee name from ``TEX Operations Company LLC'' to ``Vistra
Operations Company LLC'' in the CPNPP, Unit No. 1, Facility Operating
License (FOL) NPF-87; CPNPP, Unit No. 2, FOL (NPF-89); and the title
page of the Environmental Protection Plan.
Date of issuance: June 29, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days from the date of issuance.
Amendment Nos.: 169 (Unit 1) and 169 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML17129A024; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Facility Operating License Nos. NPF-87 and NPF-89: The amendments
revised the Facility Operating Licenses.
Date of initial notice in Federal Register: February 28, 2017 (82
FR 12139).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 29, 2017.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 6th day of July 2017.
For the Nuclear Regulatory Commission.
Eric J. Benner,
Deputy Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2017-14743 Filed 7-17-17; 8:45 am]
BILLING CODE 7590-01-P