Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process: Walden Hydro, LLC, 32357 [2017-14656]

Download as PDF Federal Register / Vol. 82, No. 133 / Thursday, July 13, 2017 / Notices Comments Due: 5 p.m. ET 7/17/17. DEPARTMENT OF ENERGY Docket Number: PR17–51–000. Applicants: Acacia Natural Gas, L.L.C. Description: Tariff filing per 284.123(b),(e)/: Acacia Revisions to Update Corporate Address to be effective 6/28/2017. Filed Date: 6/28/17. Accession Number: 201706285175. Comments/Protests Due: 5 p.m. ET 7/19/17. Federal Energy Regulatory Commission Docket Number: PR17–52–000. Applicants: Bridgeline Holdings, L.P. Description: Tariff filing per 284.123(b),(e)/: Bridgeline Revisions to Update Corporate Address to be effective 6/28/2017. Filed Date: 6/28/17. Accession Number: 201706285176. Comments/Protests Due: 5 p.m. ET 7/19/17. sradovich on DSK3GMQ082PROD with NOTICES Docket Number: PR17–53–000. Applicants: Black Hills Gas Distribution LLC. Description: Tariff filing per 284.123(b),(e)+(g): Revised Statement of Operating Conditions to be effective 6/1/2017. Filed Date: 6/29/17. Accession Number: 201706295176. Comments Due: 5 p.m. ET 7/20/17. 284.123(g) Protests Due: 5 p.m. ET 8/28/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 5, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–14675 Filed 7–12–17; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:41 Jul 12, 2017 Jkt 241001 [Project No. 4428–010] Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process: Walden Hydro, LLC a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 4428–010. c. Date Filed: May 31, 2017. d. Submitted By: Walden Hydro, LLC. e. Name of Project: Walden Hydroelectric Project. f. Location: On the Wallkill River, in Orange County, New York. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Kevin Webb, Enel Green Power North America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810; (978) 935–6039; email—Kevin.Webb@ enel.com. i. FERC Contact: Jody Callihan at (202) 502–8278; or email at jody.callihan@ferc.gov. j. Walden Hydro, LLC filed its request to use the Traditional Licensing Process on May 31, 2017, and provided public notice of its request on June 6, 2017. In a letter dated July 6, 2017, the Director of the Division of Hydropower Licensing approved Walden Hydro, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Walden Hydro, LLC as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 32357 Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Walden Hydro, LLC filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 4428. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 31, 2020. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: July 6, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–14656 Filed 7–12–17; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9964–85–Region 1] Notice of EPA’s Action To Postpone the Effective Date of the EPA Region 1 Clean Water Act National Pollutant Discharge Elimination System General Permits for Stormwater Discharges From Small Municipal Separate Storm Sewer Systems in Massachusetts Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) is providing notice that it took action to postpone the effective SUMMARY: E:\FR\FM\13JYN1.SGM 13JYN1

Agencies

[Federal Register Volume 82, Number 133 (Thursday, July 13, 2017)]
[Notices]
[Page 32357]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14656]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4428-010]


Notice of Intent To File License Application, Filing of Pre-
Application Document, Approving Use of the Traditional Licensing 
Process: Walden Hydro, LLC

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 4428-010.
    c. Date Filed: May 31, 2017.
    d. Submitted By: Walden Hydro, LLC.
    e. Name of Project: Walden Hydroelectric Project.
    f. Location: On the Wallkill River, in Orange County, New York. No 
federal lands are occupied by the project works or located within the 
project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Kevin Webb, Enel Green Power North 
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810; 
(978) 935-6039; email_Kevin.Webb@enel.com.
    i. FERC Contact: Jody Callihan at (202) 502-8278; or email at 
jody.callihan@ferc.gov.
    j. Walden Hydro, LLC filed its request to use the Traditional 
Licensing Process on May 31, 2017, and provided public notice of its 
request on June 6, 2017. In a letter dated July 6, 2017, the Director 
of the Division of Hydropower Licensing approved Walden Hydro, LLC's 
request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 
of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the New York State Historic Preservation Officer, as 
required by section 106, National Historic Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Walden Hydro, LLC as the 
Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act and 
section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    m. Walden Hydro, LLC filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 4428. Pursuant to 18 CFR 
16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by May 31, 
2020.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: July 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-14656 Filed 7-12-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.