Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process: Walden Hydro, LLC, 32357 [2017-14656]
Download as PDF
Federal Register / Vol. 82, No. 133 / Thursday, July 13, 2017 / Notices
Comments Due: 5 p.m. ET 7/17/17.
DEPARTMENT OF ENERGY
Docket Number: PR17–51–000.
Applicants: Acacia Natural Gas, L.L.C.
Description: Tariff filing per
284.123(b),(e)/: Acacia Revisions to
Update Corporate Address to be
effective 6/28/2017.
Filed Date: 6/28/17.
Accession Number: 201706285175.
Comments/Protests Due: 5 p.m. ET
7/19/17.
Federal Energy Regulatory
Commission
Docket Number: PR17–52–000.
Applicants: Bridgeline Holdings, L.P.
Description: Tariff filing per
284.123(b),(e)/: Bridgeline Revisions to
Update Corporate Address to be
effective 6/28/2017.
Filed Date: 6/28/17.
Accession Number: 201706285176.
Comments/Protests Due: 5 p.m. ET
7/19/17.
sradovich on DSK3GMQ082PROD with NOTICES
Docket Number: PR17–53–000.
Applicants: Black Hills Gas
Distribution LLC.
Description: Tariff filing per
284.123(b),(e)+(g): Revised Statement of
Operating Conditions to be effective
6/1/2017.
Filed Date: 6/29/17.
Accession Number: 201706295176.
Comments Due: 5 p.m. ET 7/20/17.
284.123(g) Protests Due: 5 p.m. ET
8/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–14675 Filed 7–12–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:41 Jul 12, 2017
Jkt 241001
[Project No. 4428–010]
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process: Walden
Hydro, LLC
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 4428–010.
c. Date Filed: May 31, 2017.
d. Submitted By: Walden Hydro, LLC.
e. Name of Project: Walden
Hydroelectric Project.
f. Location: On the Wallkill River, in
Orange County, New York. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Kevin
Webb, Enel Green Power North
America, Inc., 100 Brickstone Square,
Suite 300, Andover, MA 01810; (978)
935–6039; email—Kevin.Webb@
enel.com.
i. FERC Contact: Jody Callihan at
(202) 502–8278; or email at
jody.callihan@ferc.gov.
j. Walden Hydro, LLC filed its request
to use the Traditional Licensing Process
on May 31, 2017, and provided public
notice of its request on June 6, 2017. In
a letter dated July 6, 2017, the Director
of the Division of Hydropower
Licensing approved Walden Hydro,
LLC’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Walden Hydro, LLC as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
32357
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Walden Hydro, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 4428.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by May 31, 2020.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: July 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–14656 Filed 7–12–17; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9964–85–Region 1]
Notice of EPA’s Action To Postpone
the Effective Date of the EPA Region
1 Clean Water Act National Pollutant
Discharge Elimination System General
Permits for Stormwater Discharges
From Small Municipal Separate Storm
Sewer Systems in Massachusetts
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is providing notice that it
took action to postpone the effective
SUMMARY:
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
[Federal Register Volume 82, Number 133 (Thursday, July 13, 2017)]
[Notices]
[Page 32357]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14656]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4428-010]
Notice of Intent To File License Application, Filing of Pre-
Application Document, Approving Use of the Traditional Licensing
Process: Walden Hydro, LLC
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 4428-010.
c. Date Filed: May 31, 2017.
d. Submitted By: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in Orange County, New York. No
federal lands are occupied by the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Kevin Webb, Enel Green Power North
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810;
(978) 935-6039; email_Kevin.Webb@enel.com.
i. FERC Contact: Jody Callihan at (202) 502-8278; or email at
jody.callihan@ferc.gov.
j. Walden Hydro, LLC filed its request to use the Traditional
Licensing Process on May 31, 2017, and provided public notice of its
request on June 6, 2017. In a letter dated July 6, 2017, the Director
of the Division of Hydropower Licensing approved Walden Hydro, LLC's
request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New York State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Walden Hydro, LLC as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. Walden Hydro, LLC filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 4428. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by May 31,
2020.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: July 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-14656 Filed 7-12-17; 8:45 am]
BILLING CODE 6717-01-P