FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Units 1 and 2, 32017-32021 [2017-14517]

Download as PDF Federal Register / Vol. 82, No. 131 / Tuesday, July 11, 2017 / Notices 301–415–2084; email: INFOCOLLECTS .Resource@nrc.gov. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2016– 0129 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2016–0129. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The supporting statement and burden spreadsheet are available in ADAMS under Accession Nos. ML17171A173 and ML17171A188. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting the NRC’s Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2084; email: INFOCOLLECTS .Resource@NRC.GOV. mstockstill on DSK30JT082PROD with NOTICES B. Submitting Comments The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at https:// www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the OMB, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment VerDate Sep<11>2014 18:01 Jul 10, 2017 Jkt 241001 submission. Your request should state that comment submissions are not routinely edited to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Background Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the NRC recently submitted a request for renewal of an existing collection of information to OMB for review titled ‘‘10 CFR part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants.’’ The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on April 4, 2017 (82 FR 16435). 1. The title of the information collection: 10 CFR part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants. 2. OMB approval number: 3150–0151. 3. Type of submission: Extension. 4. The form number if applicable: Not applicable. 5. How often the collection is required or requested: On occasion. Applications are submitted only when licensing action is sought. 6. Who will be required or asked to respond: Applicants for early site permits (ESPs), standard design approvals (SDAs) and certifications, manufacturing licenses (MLs), and licenses which combine construction permits (CPs) and conditional operating licenses (OLs), e.g., COLs, for commercial nuclear power reactors. 7. The estimated number of annual responses: 1,175 (1,150 reporting responses plus 25 recordkeepers). 8. The estimated number of annual respondents: 25. 9. An estimate of the total number of hours needed annually to comply with the information collection requirement or request: 243,854 hours (220,414 hours reporting plus 23,440 hours recordkeeping). 10. Abstract: The licensing processes in part 52 of title 10 of the Code of Federal Regulations (10 CFR) provide for issuance of ESPs, SDAs, MLs, CPs, and COLs for commercial nuclear power reactors. The applicants submit updated reports, applications for renewals, exemption requests and maintain records of changes to the facility and records of detailed design related information. These licensing procedures PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 32017 are options to the two-step licensing process in 10 CFR part 50, which provides for a CP and an OL. The part 52 licensing process places procedural requirements in part 52 and technical requirements in part 50. Part 52 reduces the overall paperwork burden borne by applicants for CPs and OLs because part 52 only requires a single application and provides options for referencing standardized designs. The information in 10 CFR part 52 is needed by the agency to assess the adequacy and suitability of an applicant’s site, plant design, construction, training and experience, plans and procedures for the protection of public health and safety. Dated at Rockville, Maryland, this 6th day of July 2017. For the Nuclear Regulatory Commission. David Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2017–14491 Filed 7–10–17; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–334 and 50–412; NRC– 2017–0157] FirstEnergy Nuclear Operating Company; Beaver Valley Power Station, Units 1 and 2 Nuclear Regulatory Commission. ACTION: License amendment application; opportunity to comment, request a hearing, and petition for leave to intervene. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Facility Operating License Nos. 50–334 and 50– 412, issued to FirstEnergy Nuclear Operating Company, for operation of the Beaver Valley Power Station (Beaver Valley), Units 1 and 2. The proposed amendments would modify requirements on control and shutdown rods, and rod and bank position indication for Beaver Valley, Unit 2, and make additional, supporting changes to Beaver Valley, Units 1 and 2, Technical Specifications. DATES: Submit comments by August 10, 2017. A request for a hearing or petition for leave to intervene must be filed by September 11, 2017. ADDRESSES: Please refer to Docket ID NRC–2017–0157 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available SUMMARY: E:\FR\FM\11JYN1.SGM 11JYN1 32018 Federal Register / Vol. 82, No. 131 / Tuesday, July 11, 2017 / Notices information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2017–0157. Address questions about NRC dockets to Carol Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Booma Venkataraman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2934, email: Booma.Venktaraman@ nrc.gov. SUPPLEMENTARY INFORMATION: mstockstill on DSK30JT082PROD with NOTICES I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2017– 0157 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2017–0157. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public VerDate Sep<11>2014 18:01 Jul 10, 2017 Jkt 241001 Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. The application for amendments, dated June 30, 2017, is available in ADAMS under Accession No. ML17181A464. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. B. Submitting Comments Please include Docket ID NRC–2017– 0157 in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https:// www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Introduction The NRC is considering issuance of amendments to Facility Operating License Nos. 50–334 and 50–412, issued to FirstEnergy Nuclear Operating Company, for operation of Beaver Valley, Units 1 and 2, located in Beaver County, Pennsylvania. The proposed amendments would modify requirements on control and shutdown rods, and rod and bank position indication for Beaver Valley, Unit 2. The proposed changes are consistent with the NRC-approved Technical Specifications Task Force (TSTF) Traveler TSTF–547–A, Revision 1, ‘‘Clarification of Rod Positon Requirements’’ (ADAMS Package Accession No. ML16012A126). The licensee also proposed additional supporting changes to Beaver Valley, Units 1 and 2, Technical Specifications. Before any issuance of the proposed license amendments, the NRC will need to make the findings required by the PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 Atomic Energy Act of 1954, as amended (the Act), and the NRC’s regulations. The NRC has made a proposed determination that the license amendment request involves no significant hazards consideration. Under the NRC’s regulations in § 50.92 of title 10 of the Code of Federal Regulations (10 CFR), this means that operation of the facilities in accordance with the proposed amendments would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. Control and shutdown rods are assumed to insert into the core to shut down the reactor in evaluated accidents. Rod insertion limits ensure that adequate negative reactivity is available to provide the assumed shutdown margin (SDM). Rod alignment and overlap limits maintain an appropriate power distribution and reactivity insertion profile. Control and shutdown rods are initiators to several accidents previously evaluated, such as rod ejection. The proposed change does not change the limiting conditions for operation for the rods or make any technical changes to the Surveillance Requirements (SRs) governing the rods. Therefore, the proposed change has no significant effect on the probability of any accident previously evaluated. Revising the TS [Technical Specification] Actions to provide a limited time to repair rod movement control has no effect on the SDM assumed in the accident analysis as the proposed Actions require verification that SDM is maintained. The effects on power distribution will not cause a significant increase in the consequences of any accident previously evaluated as all TS requirements on power distribution continue to be applicable. Revising the TS Actions to provide an alternative to frequent use of the moveable incore detector system to verify the position of rods with inoperable rod position indicator does not change the requirement for the rods to be aligned and within the insertion limits. Therefore, the assumptions used in any accidents previously evaluated are unchanged and there is no significant increase in the consequences. The proposed change to resolve the conflicts in the TS ensure that the intended Actions are followed when equipment is inoperable. Actions taken with inoperable equipment are not assumptions in the E:\FR\FM\11JYN1.SGM 11JYN1 mstockstill on DSK30JT082PROD with NOTICES Federal Register / Vol. 82, No. 131 / Tuesday, July 11, 2017 / Notices accidents previously evaluated and have no significant effect on the consequences. The proposed change to eliminate an unnecessary action has no effect on the consequences of accidents previously evaluated as the analysis of those accidents did not consider the use of the action. The proposed change to increase consistency within the TS has no effect on the consequences of accidents previously evaluated as the proposed change clarifies the application of the existing requirements and does not change the intent. The proposed change to renumber the TS and make other supporting changes has no effect on the probability or consequences of previously evaluated accidents. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any previously evaluated? Response: No. The proposed change does not involve a physical alteration of the plant (that is, no new or different type of equipment will be installed). The change does not alter assumptions made in the safety analyses. The proposed change does not alter the limiting conditions for operation for the rods or make any technical changes to the SRs governing the rods. The proposed change to actions maintains or improves safety when equipment is inoperable and does not introduce new failure modes. The proposed change to renumber the TS and make other supporting changes will not create the possibility of a new or different kind of accident from those previously evaluated. Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed change to allow an alternative method of verifying rod position has no effect on the safety margin as actual rod position is not affected. The proposed change to provide time to repair rods that are Operable but immovable does not result in a significant reduction in the margin of safety because all rods must be verified to be Operable, and all other banks must be within the insertion limits. The remaining proposed changes to make the requirements internally consistent and to eliminate unnecessary actions do not affect the margin of safety as the changes do not affect the ability of the rods to perform their specified safety function. The proposed change to renumber the TS and make other supporting changes has no effect on a margin of safety. Therefore, the proposed amendment does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three VerDate Sep<11>2014 18:01 Jul 10, 2017 Jkt 241001 standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the license amendment request involves a no significant hazards consideration. The NRC is seeking public comments on this proposed determination that the license amendment request involves no significant hazards consideration. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendments until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendments before expiration of the 60day notice period if the Commission concludes the amendments involve no significant hazards consideration. In addition, the Commission may issue the amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. If the Commission makes a final no significant hazards consideration determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. III. Opportunity To Request a Hearing and Petition for Leave To Intervene Within 60 days after the date of publication of this notice, any persons (petitioner) whose interest may be affected by this action may file a request for a hearing and petition for leave to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commission’s ‘‘Agency Rules of Practice and Procedure’’ in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309. The NRC’s regulations are accessible electronically from the NRC Library on the NRC’s Web site at https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of the regulations is available at the NRC’s Public Document Room, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued. PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 32019 As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) The name, address, and telephone number of the petitioner; (2) the nature of the petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioner’s interest. In accordance with 10 CFR 2.309(f), the petition must also set forth the specific contentions which the petitioner seeks to have litigated in the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner must provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to the specific sources and documents on which the petitioner intends to rely to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. Contentions must be limited to matters within the scope of the proceeding. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene. Parties have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that party’s admitted contentions, including the opportunity to present evidence, consistent with the NRC’s regulations, policies, and procedures. Petitions must be filed no later than 60 days from the date of publication of this notice. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). The petition must be filed in accordance with the filing instructions in the ‘‘Electronic E:\FR\FM\11JYN1.SGM 11JYN1 mstockstill on DSK30JT082PROD with NOTICES 32020 Federal Register / Vol. 82, No. 131 / Tuesday, July 11, 2017 / Notices Submissions (E-Filing)’’ section of this document. If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to establish when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendments and make them immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendments. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendments unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioner’s interest in the proceeding. The petition should be submitted to the Commission by September 11, 2017. The petition must be filed in accordance with the filing instructions in the ‘‘Electronic Submissions (E-Filing)’’ section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or federally recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries. Alternatively, a State, local governmental body, Federallyrecognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c). If a hearing is granted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of his or her position on the issues but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the VerDate Sep<11>2014 18:01 Jul 10, 2017 Jkt 241001 limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled. IV. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing and petition for leave to intervene (petition), any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities that request to participate under 10 CFR 2.315(c), must be filed in accordance with the NRC’s E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562, August 3, 2012). The EFiling process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Detailed guidance on making electronic submissions may be found in the Guidance for Electronic Submissions to the NRC and on the NRC Web site at https://www.nrc.gov/sitehelp/e-submittals.html. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by telephone at 301–415–1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public Web site at https:// www.nrc.gov/site-help/e-submittals/ getting-started.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit adjudicatory documents. Submissions PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 must be in Portable Document Format (PDF). Additional guidance on PDF submissions is available on the NRC’s public Web site at https://www.nrc.gov/ site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the EFiling system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC’s Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed so that they can obtain access to the documents via the E-Filing system. A person filing electronically using the NRC’s adjudicatory E-Filing system may seek assistance by contacting the NRC’s Electronic Filing Help Desk through the ‘‘Contact Us’’ link located on the NRC’s public Web site at https:// www.nrc.gov/site-help/esubmittals.html, by email to MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., Eastern Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing adjudicatory documents in this manner are responsible for serving the document on all other participants. Filing is E:\FR\FM\11JYN1.SGM 11JYN1 Federal Register / Vol. 82, No. 131 / Tuesday, July 11, 2017 / Notices mstockstill on DSK30JT082PROD with NOTICES considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https:// adams.nrc.gov/ehd, unless excluded pursuant to an order of the Commission or the presiding officer. If you do not have an NRC-issued digital ID certificate as described above, click cancel when the link requests certificates and you will be automatically directed to the NRC’s electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or personal phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. For example, in some instances, individuals provide home addresses in order to demonstrate proximity to a facility or site. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. For further details with respect to this action, see the application for license amendments dated June 30, 2017. Attorney for licensee: David W. Jenkins, FirstEnergy Nuclear Operating Company, FirstEnergy Corporation, 76 South Main Street, Akron, OH 44308. NRC Branch Chief: James G. Danna. Dated at Rockville, Maryland, this 6th day of July 2017. For the Nuclear Regulatory Commission. Booma Venkataraman, Project Manager, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2017–14517 Filed 7–10–17; 8:45 am] BILLING CODE 7590–01–P VerDate Sep<11>2014 18:01 Jul 10, 2017 Jkt 241001 PENSION BENEFIT GUARANTY CORPORATION Submission of Information Collection for OMB Review; Comment Request; Mergers and Transfers Between Multiemployer Plans Pension Benefit Guaranty Corporation. ACTION: Notice of request for extension of OMB approval. AGENCY: The Pension Benefit Guaranty Corporation (PBGC) is requesting that the Office of Management and Budget (OMB) extend approval, under the Paperwork Reduction Act, of a collection of information contained in its regulation on Mergers and Transfers Between Multiemployer Plans. This notice informs the public of PBGC’s request and solicits public comment on the collection of information. DATES: Comments must be submitted on or before August 10, 2017. ADDRESSES: Comments should be sent to the Office of Information and Regulatory Affairs, Office of Management and Budget, Attention: Desk Officer for Pension Benefit Guaranty Corporation, via electronic mail at OIRA_DOCKET@ omb.eop.gov or by fax to 202–395–6974. A copy of PBGC’s request may be obtained without charge by writing to the Disclosure Division of the Office of the General Counsel, Pension Benefit Guaranty Corporation, 1200 K Street NW., Washington, DC 20005–4026, or by calling 202–326–4040 during normal business hours. (TTY and TDD users may call the Federal relay service tollfree at 1–800–877–8339 and ask to be connected to 202–326–4040.) The request is also available at https:// www.reginfo.gov. FOR FURTHER INFORMATION CONTACT: Hilary Duke (duke.hilary@pbgc.gov), Attorney, Regulatory Affairs Group, Office of the General Counsel, Pension Benefit Guaranty Corporation, 1200 K Street NW., Washington DC 20005– 4026; 202–326–4400, extension 3839. TTY and TDD users may call the Federal relay service toll-free at 800– 877–8339 and ask to be connected to 202–326–4400, extension 3839. SUPPLEMENTARY INFORMATION: Section 4231(a) and (b) of the Employee Retirement Income Security Act of 1974 (ERISA) requires plans that are involved in a merger or transfer to give PBGC notice at least 120 days before the transaction and provides that if PBGC determines that specified requirements are satisfied, the transaction will be deemed not to be in violation of ERISA section 406(a) or (b)(2) (dealing with prohibited transactions). SUMMARY: PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 32021 PBGC’s regulation on Mergers and Transfers Between Multiemployer Plans (29 CFR part 4231) sets forth the procedures for giving notice of a merger or transfer under section 4231 and for requesting a determination that a transaction complies with section 4231. PBGC uses information submitted by plan sponsors under the regulation to determine whether mergers and transfers conform to the requirements of ERISA section 4231 and the regulation. The collection of information under the regulation has been approved by OMB under control number 1212–0022 through July 31, 2017. PBGC is requesting that OMB extend its approval for another three years. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. PBGC estimates that there are 14 transactions each year for which plan sponsors submit notices and approval requests under this regulation. The estimated annual burden of the collection of information is 9.50 hours and $42,800. Issued in Washington, DC. Deborah Chase Murphy, Assistant General Counsel for Regulatory Affairs, Pension Benefit Guaranty Corporation. [FR Doc. 2017–14438 Filed 7–10–17; 8:45 am] BILLING CODE P POSTAL SERVICE Product Change—Priority Mail and First-Class Package Service Negotiated Service Agreement Postal ServiceTM. ACTION: Notice. AGENCY: The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a domestic shipping services contract to the list of Negotiated Service Agreements in the Mail Classification Schedule’s Competitive Products List. DATES: Effective date: July 11, 2017. FOR FURTHER INFORMATION CONTACT: Elizabeth A. Reed, 202–268–3179. SUPPLEMENTARY INFORMATION: The United States Postal Service® hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3), on July 3, 2017, it filed with the Postal Regulatory Commission a Request of the United States Postal Service to Add Priority Mail & First-Class Package Service Contract 47 to Competitive Product List. Documents are available at SUMMARY: E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 82, Number 131 (Tuesday, July 11, 2017)]
[Notices]
[Pages 32017-32021]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14517]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-334 and 50-412; NRC-2017-0157]


FirstEnergy Nuclear Operating Company; Beaver Valley Power 
Station, Units 1 and 2

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of amendments to Facility Operating License Nos. 50-334 and 
50-412, issued to FirstEnergy Nuclear Operating Company, for operation 
of the Beaver Valley Power Station (Beaver Valley), Units 1 and 2. The 
proposed amendments would modify requirements on control and shutdown 
rods, and rod and bank position indication for Beaver Valley, Unit 2, 
and make additional, supporting changes to Beaver Valley, Units 1 and 
2, Technical Specifications.

DATES: Submit comments by August 10, 2017. A request for a hearing or 
petition for leave to intervene must be filed by September 11, 2017.

ADDRESSES: Please refer to Docket ID NRC-2017-0157 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available

[[Page 32018]]

information related to this document using any of the following 
methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0157. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Booma Venkataraman, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2934, email: Booma.Venktaraman@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0157 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0157.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The application for amendments, dated June 30, 2017, is 
available in ADAMS under Accession No. ML17181A464.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0157 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of amendments to Facility Operating 
License Nos. 50-334 and 50-412, issued to FirstEnergy Nuclear Operating 
Company, for operation of Beaver Valley, Units 1 and 2, located in 
Beaver County, Pennsylvania.
    The proposed amendments would modify requirements on control and 
shutdown rods, and rod and bank position indication for Beaver Valley, 
Unit 2. The proposed changes are consistent with the NRC-approved 
Technical Specifications Task Force (TSTF) Traveler TSTF-547-A, 
Revision 1, ``Clarification of Rod Positon Requirements'' (ADAMS 
Package Accession No. ML16012A126). The licensee also proposed 
additional supporting changes to Beaver Valley, Units 1 and 2, 
Technical Specifications.
    Before any issuance of the proposed license amendments, the NRC 
will need to make the findings required by the Atomic Energy Act of 
1954, as amended (the Act), and the NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in Sec.  50.92 of title 10 of the Code of Federal 
Regulations (10 CFR), this means that operation of the facilities in 
accordance with the proposed amendments would not (1) involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    Control and shutdown rods are assumed to insert into the core to 
shut down the reactor in evaluated accidents. Rod insertion limits 
ensure that adequate negative reactivity is available to provide the 
assumed shutdown margin (SDM). Rod alignment and overlap limits 
maintain an appropriate power distribution and reactivity insertion 
profile.
    Control and shutdown rods are initiators to several accidents 
previously evaluated, such as rod ejection. The proposed change does 
not change the limiting conditions for operation for the rods or 
make any technical changes to the Surveillance Requirements (SRs) 
governing the rods. Therefore, the proposed change has no 
significant effect on the probability of any accident previously 
evaluated.
    Revising the TS [Technical Specification] Actions to provide a 
limited time to repair rod movement control has no effect on the SDM 
assumed in the accident analysis as the proposed Actions require 
verification that SDM is maintained. The effects on power 
distribution will not cause a significant increase in the 
consequences of any accident previously evaluated as all TS 
requirements on power distribution continue to be applicable.
    Revising the TS Actions to provide an alternative to frequent 
use of the moveable incore detector system to verify the position of 
rods with inoperable rod position indicator does not change the 
requirement for the rods to be aligned and within the insertion 
limits.
    Therefore, the assumptions used in any accidents previously 
evaluated are unchanged and there is no significant increase in the 
consequences.
    The proposed change to resolve the conflicts in the TS ensure 
that the intended Actions are followed when equipment is inoperable. 
Actions taken with inoperable equipment are not assumptions in the

[[Page 32019]]

accidents previously evaluated and have no significant effect on the 
consequences.
    The proposed change to eliminate an unnecessary action has no 
effect on the consequences of accidents previously evaluated as the 
analysis of those accidents did not consider the use of the action.
    The proposed change to increase consistency within the TS has no 
effect on the consequences of accidents previously evaluated as the 
proposed change clarifies the application of the existing 
requirements and does not change the intent.
    The proposed change to renumber the TS and make other supporting 
changes has no effect on the probability or consequences of 
previously evaluated accidents.
    Therefore, the proposed amendment does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any previously evaluated?
    Response: No.
    The proposed change does not involve a physical alteration of 
the plant (that is, no new or different type of equipment will be 
installed). The change does not alter assumptions made in the safety 
analyses. The proposed change does not alter the limiting conditions 
for operation for the rods or make any technical changes to the SRs 
governing the rods.
    The proposed change to actions maintains or improves safety when 
equipment is inoperable and does not introduce new failure modes.
    The proposed change to renumber the TS and make other supporting 
changes will not create the possibility of a new or different kind 
of accident from those previously evaluated.
    Therefore, the proposed amendment does not create the 
possibility of a new or different kind of accident from any 
previously evaluated.
    3. Does the proposed amendment involve a significant reduction 
in a margin of safety?
    Response: No.
    The proposed change to allow an alternative method of verifying 
rod position has no effect on the safety margin as actual rod 
position is not affected. The proposed change to provide time to 
repair rods that are Operable but immovable does not result in a 
significant reduction in the margin of safety because all rods must 
be verified to be Operable, and all other banks must be within the 
insertion limits.
    The remaining proposed changes to make the requirements 
internally consistent and to eliminate unnecessary actions do not 
affect the margin of safety as the changes do not affect the ability 
of the rods to perform their specified safety function.
    The proposed change to renumber the TS and make other supporting 
changes has no effect on a margin of safety.
    Therefore, the proposed amendment does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves a no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendments before expiration of the 
60-day notice period if the Commission concludes the amendments involve 
no significant hazards consideration. In addition, the Commission may 
issue the amendments prior to the expiration of the 30-day comment 
period if circumstances change during the 30-day comment period such 
that failure to act in a timely way would result, for example, in 
derating or shutdown of the facility. If the Commission takes action 
prior to the expiration of either the comment period or the notice 
period, it will publish in the Federal Register a notice of issuance. 
If the Commission makes a final no significant hazards consideration 
determination, any hearing will take place after issuance. The 
Commission expects that the need to take this action will occur very 
infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of 
the regulations is available at the NRC's Public Document Room, located 
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first 
floor), Rockville, Maryland 20852. If a petition is filed, the 
Commission or a presiding officer will rule on the petition and, if 
appropriate, a notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right under the Act to 
be made a party to the proceeding; (3) the nature and extent of the 
petitioner's property, financial, or other interest in the proceeding; 
and (4) the possible effect of any decision or order which may be 
entered in the proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions which the petitioner seeks to have 
litigated in the proceeding. Each contention must consist of a specific 
statement of the issue of law or fact to be raised or controverted. In 
addition, the petitioner must provide a brief explanation of the bases 
for the contention and a concise statement of the alleged facts or 
expert opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to the specific sources and 
documents on which the petitioner intends to rely to support its 
position on the issue. The petition must include sufficient information 
to show that a genuine dispute exists with the applicant or licensee on 
a material issue of law or fact. Contentions must be limited to matters 
within the scope of the proceeding. The contention must be one which, 
if proven, would entitle the petitioner to relief. A petitioner who 
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic

[[Page 32020]]

Submissions (E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves no significant hazards 
consideration, the Commission may issue the amendments and make them 
immediately effective, notwithstanding the request for a hearing. Any 
hearing would take place after issuance of the amendments. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of the amendments unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by 
September 11, 2017. The petition must be filed in accordance with the 
filing instructions in the ``Electronic Submissions (E-Filing)'' 
section of this document, and should meet the requirements for 
petitions set forth in this section, except that under 10 CFR 
2.309(h)(2) a State, local governmental body, or federally recognized 
Indian Tribe, or agency thereof does not need to address the standing 
requirements in 10 CFR 2.309(d) if the facility is located within its 
boundaries. Alternatively, a State, local governmental body, Federally-
recognized Indian Tribe, or agency thereof may participate as a non-
party under 10 CFR 2.315(c).
    If a hearing is granted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing and petition for leave to intervene (petition), any 
motion or other document filed in the proceeding prior to the 
submission of a request for hearing or petition to intervene, and 
documents filed by interested governmental entities that request to 
participate under 10 CFR 2.315(c), must be filed in accordance with the 
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 
46562, August 3, 2012). The E-Filing process requires participants to 
submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Detailed 
guidance on making electronic submissions may be found in the Guidance 
for Electronic Submissions to the NRC and on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit 
paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at hearing.docket@nrc.gov, or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public Web site at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed so that they can obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by 
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is

[[Page 32021]]

considered complete by first-class mail as of the time of deposit in 
the mail, or by courier, express mail, or expedited delivery service 
upon depositing the document with the provider of the service. A 
presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the 
presiding officer subsequently determines that the reason for granting 
the exemption from use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
Commission or the presiding officer. If you do not have an NRC-issued 
digital ID certificate as described above, click cancel when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing dockets where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.
    For further details with respect to this action, see the 
application for license amendments dated June 30, 2017.
    Attorney for licensee: David W. Jenkins, FirstEnergy Nuclear 
Operating Company, FirstEnergy Corporation, 76 South Main Street, 
Akron, OH 44308.
    NRC Branch Chief: James G. Danna.

    Dated at Rockville, Maryland, this 6th day of July 2017.

    For the Nuclear Regulatory Commission.
Booma Venkataraman,
Project Manager, Plant Licensing Branch I, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2017-14517 Filed 7-10-17; 8:45 am]
BILLING CODE 7590-01-P