Download as PDF Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #3 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1484–015. Applicants: Shell Energy North America (US), L.P. Description: Updated Market Power Analysis for the Northeast Region of Shell Energy North America (US), L.P. Filed Date: 6/29/17. Accession Number: 20170629–5277. Comments Due: 5 p.m. ET 8/28/17. Docket Numbers: ER10–2718–027; ER10–2719–026; ER14–2498–006; ER14–2500–006. Applicants: Cogen Technologies Linden Venture, L.P., East Coast Power Linden Holding, L.L.C., Newark Energy Center, LLC, EIF Newark, LLC. Description: Joint Triennial MBR Update and Notice of Non-Material Change in Status of Cogen Technologies Linden Venture, L.P., et al. Filed Date: 6/29/17. Accession Number: 20170629–5281. Comments Due: 5 p.m. ET 8/28/17. Docket Numbers: ER10–2959–011; ER10–2934–010. Applicants: Chambers Cogeneration, Limited Partnership, Logan Generating Company, LP. Description: MBR Triennial Filing of Chambers Cogeneration, Limited Partnership, et al. Filed Date: 6/29/17. Accession Number: 20170629–5283. Comments Due: 5 p.m. ET 8/28/17. Docket Numbers: ER10–3195–005; ER10–3194–005. Applicants: MATEP Limited Partnership, MATEP LLC. Description: Updated Market Power Analysis for the Northeast Region of MATEP Limited Partnership, et al. Filed Date: 6/29/17. Accession Number: 20170629–5280. Comments Due: 5 p.m. ET 8/28/17. Docket Numbers: ER11–2041–012; ER10–3193–011; ER11–2042–012. Applicants: Brooklyn Navy Yard Cogeneration Partners, L.P., Innovative Energy Systems, LLC, Seneca Energy II, LLC. Description: Joint MBR Triennial and Notice of Non-Material Change in Status of Innovative Energy Systems, LLC, et al. Filed Date: 6/29/17. Accession Number: 20170629–5278. Comments Due: 5 p.m. ET 8/28/17. Docket Numbers: ER17–1556–001. VerDate Sep<11>2014 16:08 Jul 07, 2017 Jkt 241001 Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2017–06–30_Deficiency Response to Data Sharing with Natural Gas Pipelines to be effective 7/5/2017. Filed Date: 6/30/17. Accession Number: 20170630–5290. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1986–000. Applicants: Krayn Wind LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Updates to be effective 8/28/2017. Filed Date: 6/30/17. Accession Number: 20170630–5212. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1987–000. Applicants: Mustang Hills, LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Updates to be effective 8/28/2017. Filed Date: 6/30/17. Accession Number: 20170630–5213. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1988–000. Applicants: Patton Wind Farm, LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Updates to be effective 8/28/2017. Filed Date: 6/30/17. Accession Number: 20170630–5214. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1989–000. Applicants: Bishop Hill Energy II LLC. Description: Compliance filing: Bishop Hill Energy II Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5215. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1990–000. Applicants: Vulcan/BN Geothermal Power Company. Description: Compliance filing: Vulcan-BN Geothermal Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5216. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1991–000. Applicants: Cordova Energy Company LLC. Description: Compliance filing: Cordova Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5217. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1992–000. Applicants: Pinyon Pines Wind I, LLC. Description: Compliance filing: Pinyon Pines I Order No. 819 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 31769 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5218. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1993–000. Applicants: Pinyon Pines Wind II, LLC. Description: Compliance filing: Pinyon Pines II Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5219. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1994–000. Applicants: Salton Sea Power Generation Company. Description: Compliance filing: Salton Sea Power Gen Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5220. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1995–000. Applicants: Salton Sea Power L.L.C. Description: Compliance filing: Salton Sea Power LLC Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5223. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1996–000. Applicants: Solar Star California XIX, LLC. Description: Compliance filing: Solar Star XIX Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5229. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1997–000. Applicants: Solar Star California XX, LLC. Description: Compliance filing: Solar Star XX Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5230. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1998–000. Applicants: Topaz Solar Farms LLC. Description: Compliance filing: Topaz Solar Farms Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5231. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–1999–000. Applicants: CalEnergy, LLC. Description: Compliance filing: CalEnergy Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5232. E:\FR\FM\10JYN1.SGM 10JYN1 sradovich on DSK3GMQ082PROD with NOTICES 31770 Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2000–000. Applicants: CE Leathers Company. Description: Compliance filing: CE Leathers Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5233. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2001–000. Applicants: Del Ranch Company. Description: Compliance filing: Del Ranch Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5234. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2002–000. Applicants: Elmore Company. Description: Compliance filing: Elmore Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5235. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2003–000. Applicants: Fish Lake Power LLC. Description: Compliance filing: Fish Lake Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5236. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2004–000. Applicants: Yuma Cogeneration Associates. Description: Compliance filing: Yuma Cogeneration Order No. 819 Compliance Filing to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5237. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2005–000. Applicants: Marshall Wind Energy LLC. Description: Compliance filing: Marshall Wind Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5238. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2006–000. Applicants: Grande Prairie Wind, LLC. Description: Compliance filing: Grande Praire Wind Order No. 819 Compliance Filing to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5239. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2007–000. Applicants: PacifiCorp. Description: Compliance filing: PacifiCorp Order No. 819 Compliance Filing to be effective 7/1/2017. VerDate Sep<11>2014 16:08 Jul 07, 2017 Jkt 241001 Filed Date: 6/30/17. Accession Number: 20170630–5240. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2008–000. Applicants: Pure Energy USA, LLC. Description: Baseline eTariff Filing: Market-Based Rate Tariff Application to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5245. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2009–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Concurrence to APS RS No. 288 (TEP RS No. 337) to be effective 8/2/2017. Filed Date: 6/30/17. Accession Number: 20170630–5256. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2010–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement Nos. 174 and 359 to be effective 6/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5258. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2011–000. Applicants: Castleton Commodities Merchant Trading L.P. Description: Market-Based Triennial Review Filing: Triennial Filing 2017 to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5260. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2012–000. Applicants: Rensselaer Generating LLC. Description: Market-Based Triennial Review Filing: Triennial Filing 2017 to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5262. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2013–000. Applicants: Collegiate Clean Energy, LLC. Description: Market-Based Triennial Review Filing: 2017 Northeast Triennial to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5267. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2014–000. Applicants: Ingenco Wholesale Power, L.L.C. Description: Market-Based Triennial Review Filing: Triennial Filing 2017 to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5268. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2015–000. Applicants: Roseton Generating LLC. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Description: Market-Based Triennial Review Filing: NE Triennial 2017 to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5272. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2016–000. Applicants: Black River Hydroelectric, LLC. Description: Market-Based Triennial Review Filing: Northeast Triennial and Tariff Revisions to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5279. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2017–000. Applicants: All Dams Generation, LLC. Description: Market-Based Triennial Review Filing: Northeast Triennial & Tariff Revisions to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5280. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2018–000. Applicants: Arizona Public Service Company. Description: Tariff Cancellation: Cancellation of Service Agreement No. 51741 to be effective 8/30/2017. Filed Date: 6/30/17. Accession Number: 20170630–5281. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2019–000. Applicants: Lake Lynn Generation, LLC. Description: Market-Based Triennial Review Filing: Northeast Triennial and Tariff Revisions to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5285. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2020–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: South Central MCN LLC Formula Rate to be effective 12/31/9998. Filed Date: 6/30/17. Accession Number: 20170630–5287. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2021–000. Applicants: Wisconsin Electric Power Company. Description: § 205(d) Rate Filing: Wisconsin Electric FERC Electric Tariff Volume No. 9—2017 to be effective 9/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5288. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2022–000. Applicants: PE Hydro Generation, LLC. Description: Market-Based Triennial Review Filing: Northeast Triennial & Tariff Revisions to be effective 7/1/2017. E:\FR\FM\10JYN1.SGM 10JYN1 Federal Register / Vol. 82, No. 130 / Monday, July 10, 2017 / Notices Filed Date: 6/30/17. Accession Number: 20170630–5289. Comments Due: 5 p.m. ET 8/29/17. Docket Numbers: ER17–2023–000. Applicants: National Grid Generation LLC. Description: § 205(d) Rate Filing: Annual Reset of Pension and OPEB Expenses to be effective 1/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5298. Comments Due: 5 p.m. ET 7/21/17. Docket Numbers: ER17–2024–000. Applicants: Nevada Power Company. Description: Compliance filing: Market-Based Rate Tariff, Volume No. 11 Order 819 Compliance to be effective 7/1/2017. Filed Date: 6/30/17. Accession Number: 20170630–5307. Comments Due: 5 p.m. ET 7/21/17. sradovich on DSK3GMQ082PROD with NOTICES Docket Numbers: ER17–2025–000. Applicants: Sierra Pacific Power Company. Description: Compliance filing: Market-Based Rate Tariff Vol 7 Order 819 Compliance to be effective 7/1/ 2017. Filed Date: 6/30/17. Accession Number: 20170630–5311. Comments Due: 5 p.m. ET 7/21/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 30, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–14332 Filed 7–7–17; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:08 Jul 07, 2017 Jkt 241001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–466–000] Northern Natural Gas Company; Notice of Request Under Blanket Authorization Take notice that on June 22, 2017, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in Docket No. CP17–466–000 a prior notice request pursuant to sections 157.205 and 157.208 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA) and Northern’s blanket authorizations issued in Docket No. CP82–401–000. Northern seeks authorization to install and operate (1) a compressor station, (2) a segment of pipeline, and (3) an interconnect, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. First, Northern proposes to install and operate a new 11,152-horsepower (HP) compressor station (Bakersfield Compressor Station or Project) in Peco County, Texas. Second, Northern proposes to construct and operate 1.5 miles of 20-inch diameter pipeline. Third, Northern proposes to construct and operate an interconnect with a third-party. The pipeline will be connected to the discharge side of the Bakersfield compressor station and the terminus will be at the proposed interconnect station with a third-party pipeline. The Project will allow Northern to transport 200,000 Dth/day of incremental load through the addition of compression, pipeline and interconnect to a third-party pipeline from Northern’s existing system. The total cost is approximately $28,200,000. Any questions regarding this Application should be directed to Michael T Loeffler, Senior Director, Certificates and External Affairs for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, by phone (402) 398–7103, by fax (402) 398–7592, or by email at mike.loeffler@nngco.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 31771 file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) E:\FR\FM\10JYN1.SGM 10JYN1

Agencies

[Federal Register Volume 82, Number 130 (Monday, July 10, 2017)]
[Notices]
[Pages 31769-31771]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14332]



[[Page 31769]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #3

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1484-015.
    Applicants: Shell Energy North America (US), L.P.
    Description: Updated Market Power Analysis for the Northeast Region 
of Shell Energy North America (US), L.P.
    Filed Date: 6/29/17.
    Accession Number: 20170629-5277.
    Comments Due: 5 p.m. ET 8/28/17.

    Docket Numbers: ER10-2718-027; ER10-2719-026; ER14-2498-006; ER14-
2500-006.
    Applicants: Cogen Technologies Linden Venture, L.P., East Coast 
Power Linden Holding, L.L.C., Newark Energy Center, LLC, EIF Newark, 
LLC.
    Description: Joint Triennial MBR Update and Notice of Non-Material 
Change in Status of Cogen Technologies Linden Venture, L.P., et al.
    Filed Date: 6/29/17.
    Accession Number: 20170629-5281.
    Comments Due: 5 p.m. ET 8/28/17.

    Docket Numbers: ER10-2959-011; ER10-2934-010.
    Applicants: Chambers Cogeneration, Limited Partnership, Logan 
Generating Company, LP.
    Description: MBR Triennial Filing of Chambers Cogeneration, Limited 
Partnership, et al.
    Filed Date: 6/29/17.
    Accession Number: 20170629-5283.
    Comments Due: 5 p.m. ET 8/28/17.

    Docket Numbers: ER10-3195-005; ER10-3194-005.
    Applicants: MATEP Limited Partnership, MATEP LLC.
    Description: Updated Market Power Analysis for the Northeast Region 
of MATEP Limited Partnership, et al.
    Filed Date: 6/29/17.
    Accession Number: 20170629-5280.
    Comments Due: 5 p.m. ET 8/28/17.

    Docket Numbers: ER11-2041-012; ER10-3193-011; ER11-2042-012.
    Applicants: Brooklyn Navy Yard Cogeneration Partners, L.P., 
Innovative Energy Systems, LLC, Seneca Energy II, LLC.
    Description: Joint MBR Triennial and Notice of Non-Material Change 
in Status of Innovative Energy Systems, LLC, et al.
    Filed Date: 6/29/17.
    Accession Number: 20170629-5278.
    Comments Due: 5 p.m. ET 8/28/17.

    Docket Numbers: ER17-1556-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2017-06-30_Deficiency Response to 
Data Sharing with Natural Gas Pipelines to be effective 7/5/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5290.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1986-000.
    Applicants: Krayn Wind LLC.
    Description: Sec.  205(d) Rate Filing: Market-Based Rate Tariff 
Updates to be effective 8/28/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5212.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1987-000.
    Applicants: Mustang Hills, LLC.
    Description: Sec.  205(d) Rate Filing: Market-Based Rate Tariff 
Updates to be effective 8/28/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5213.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1988-000.
    Applicants: Patton Wind Farm, LLC.
    Description: Sec.  205(d) Rate Filing: Market-Based Rate Tariff 
Updates to be effective 8/28/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5214.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1989-000.
    Applicants: Bishop Hill Energy II LLC.
    Description: Compliance filing: Bishop Hill Energy II Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5215.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1990-000.
    Applicants: Vulcan/BN Geothermal Power Company.
    Description: Compliance filing: Vulcan-BN Geothermal Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5216.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1991-000.
    Applicants: Cordova Energy Company LLC.
    Description: Compliance filing: Cordova Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5217.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1992-000.
    Applicants: Pinyon Pines Wind I, LLC.
    Description: Compliance filing: Pinyon Pines I Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5218.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1993-000.
    Applicants: Pinyon Pines Wind II, LLC.
    Description: Compliance filing: Pinyon Pines II Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5219.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1994-000.
    Applicants: Salton Sea Power Generation Company.
    Description: Compliance filing: Salton Sea Power Gen Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5220.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1995-000.
    Applicants: Salton Sea Power L.L.C.
    Description: Compliance filing: Salton Sea Power LLC Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5223.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1996-000.
    Applicants: Solar Star California XIX, LLC.
    Description: Compliance filing: Solar Star XIX Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5229.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1997-000.
    Applicants: Solar Star California XX, LLC.
    Description: Compliance filing: Solar Star XX Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5230.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1998-000.
    Applicants: Topaz Solar Farms LLC.
    Description: Compliance filing: Topaz Solar Farms Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5231.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-1999-000.
    Applicants: CalEnergy, LLC.
    Description: Compliance filing: CalEnergy Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5232.

[[Page 31770]]

    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2000-000.
    Applicants: CE Leathers Company.
    Description: Compliance filing: CE Leathers Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5233.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2001-000.
    Applicants: Del Ranch Company.
    Description: Compliance filing: Del Ranch Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5234.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2002-000.
    Applicants: Elmore Company.
    Description: Compliance filing: Elmore Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5235.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2003-000.
    Applicants: Fish Lake Power LLC.
    Description: Compliance filing: Fish Lake Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5236.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2004-000.
    Applicants: Yuma Cogeneration Associates.
    Description: Compliance filing: Yuma Cogeneration Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5237.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2005-000.
    Applicants: Marshall Wind Energy LLC.
    Description: Compliance filing: Marshall Wind Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5238.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2006-000.
    Applicants: Grande Prairie Wind, LLC.
    Description: Compliance filing: Grande Praire Wind Order No. 819 
Compliance Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5239.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2007-000.
    Applicants: PacifiCorp.
    Description: Compliance filing: PacifiCorp Order No. 819 Compliance 
Filing to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5240.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2008-000.
    Applicants: Pure Energy USA, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Tariff 
Application to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5245.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2009-000.
    Applicants: Tucson Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Concurrence to APS RS No. 
288 (TEP RS No. 337) to be effective 8/2/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5256.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2010-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement Nos. 174 
and 359 to be effective 6/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5258.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2011-000.
    Applicants: Castleton Commodities Merchant Trading L.P.
    Description: Market-Based Triennial Review Filing: Triennial Filing 
2017 to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5260.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2012-000.
    Applicants: Rensselaer Generating LLC.
    Description: Market-Based Triennial Review Filing: Triennial Filing 
2017 to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5262.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2013-000.
    Applicants: Collegiate Clean Energy, LLC.
    Description: Market-Based Triennial Review Filing: 2017 Northeast 
Triennial to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5267.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2014-000.
    Applicants: Ingenco Wholesale Power, L.L.C.
    Description: Market-Based Triennial Review Filing: Triennial Filing 
2017 to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5268.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2015-000.
    Applicants: Roseton Generating LLC.
    Description: Market-Based Triennial Review Filing: NE Triennial 
2017 to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5272.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2016-000.
    Applicants: Black River Hydroelectric, LLC.
    Description: Market-Based Triennial Review Filing: Northeast 
Triennial and Tariff Revisions to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5279.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2017-000.
    Applicants: All Dams Generation, LLC.
    Description: Market-Based Triennial Review Filing: Northeast 
Triennial & Tariff Revisions to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5280.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2018-000.
    Applicants: Arizona Public Service Company.
    Description: Tariff Cancellation: Cancellation of Service Agreement 
No. 51741 to be effective 8/30/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5281.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2019-000.
    Applicants: Lake Lynn Generation, LLC.
    Description: Market-Based Triennial Review Filing: Northeast 
Triennial and Tariff Revisions to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5285.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2020-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: South Central MCN LLC 
Formula Rate to be effective 12/31/9998.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5287.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2021-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Wisconsin Electric FERC 
Electric Tariff Volume No. 9--2017 to be effective 9/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5288.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2022-000.
    Applicants: PE Hydro Generation, LLC.
    Description: Market-Based Triennial Review Filing: Northeast 
Triennial & Tariff Revisions to be effective 7/1/2017.

[[Page 31771]]

    Filed Date: 6/30/17.
    Accession Number: 20170630-5289.
    Comments Due: 5 p.m. ET 8/29/17.

    Docket Numbers: ER17-2023-000.
    Applicants: National Grid Generation LLC.
    Description: Sec.  205(d) Rate Filing: Annual Reset of Pension and 
OPEB Expenses to be effective 1/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5298.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2024-000.
    Applicants: Nevada Power Company.
    Description: Compliance filing: Market-Based Rate Tariff, Volume 
No. 11 Order 819 Compliance to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5307.
    Comments Due: 5 p.m. ET 7/21/17.

    Docket Numbers: ER17-2025-000.
    Applicants: Sierra Pacific Power Company.
    Description: Compliance filing: Market-Based Rate Tariff Vol 7 
Order 819 Compliance to be effective 7/1/2017.
    Filed Date: 6/30/17.
    Accession Number: 20170630-5311.
    Comments Due: 5 p.m. ET 7/21/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-14332 Filed 7-7-17; 8:45 am]