Environmental Impact Statements; Notice of Availability, 31597 [2017-14284]

Download as PDF Federal Register / Vol. 82, No. 129 / Friday, July 7, 2017 / Notices management evaluations; and document processing for new and existing chemicals and products of biotechnology and nanotechnology under TSCA. In accordance with 40 CFR 2.306(j), EPA has determined that under EPA contract number EP–W–17–008, SRC and its subcontractors will require access to CBI submitted to EPA under sections 4, 5, 6, 8, and 21 of TSCA to perform successfully the duties specified under the contract. SRC and its subcontractors will be given access to information submitted to EPA under sections 4, 5, 6, 8, and 21 of TSCA. Some of the information may be claimed or determined to be CBI. EPA is issuing this notice to inform all submitters of information under I. General Information sections 4, 5, 6, 8, and 21 of TSCA that EPA may provide SRC and its A. Does this action apply to me? subcontractors access to these CBI This action is directed to the public materials on a need-to-know basis only. in general. This action may, however, be All access to TSCA CBI under this of interest to all who manufacture, contract will take place at EPA process, or distribute industrial Headquarters and SRC’s sites located in chemicals. Since other entities may also Arlington, VA and North Syracuse, NY be interested, the Agency has not in accordance with EPA’s TSCA CBI attempted to describe all the specific Protection Manual. entities that may be affected by this Access to TSCA data, including CBI, action. will continue until March 12, 2022. If B. How can I get copies of this document the contract is extended, this access will also continue for the duration of the and other related information? extended contract without further The docket for this action, identified notice. by docket identification (ID) number SRC and its subcontractors’ personnel EPA–HQ–OPPT–2003–0004, is available will be required to sign nondisclosure at https://www.regulations.gov or at the agreements and will be briefed on Office of Pollution Prevention and appropriate security procedures before Toxics Docket (OPPT Docket), they are permitted access to TSCA CBI. Environmental Protection Agency Authority: 15 U.S.C. 2601 et seq. Docket Center (EPA/DC), West William Dated: June 5, 2017. Jefferson Clinton Bldg., Rm. 3334, 1301 Constitution Ave. NW., Washington, Pamela S. Myrick, DC. The Public Reading Room is open Director, Information Management Division, from 8:30 a.m. to 4:30 p.m., Monday Office of Pollution Prevention and Toxics. through Friday, excluding legal [FR Doc. 2017–14324 Filed 7–6–17; 8:45 am] holidays. The telephone number for the BILLING CODE 6560–50–P Public Reading Room is (202) 566–1744, and the telephone number for the OPPT Docket is (202) 566–0280. Please review ENVIRONMENTAL PROTECTION the visitor instructions and additional AGENCY information about the docket available [ER–FRL–9034–1] at https://www.epa.gov/dockets. Access to the confidential data will occur no sooner than July 14, 2017. FOR FURTHER INFORMATION CONTACT: For technical information contact: Scott M. Sherlock, Environmental Assistance Division (7408M), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001; telephone number: (202) 564–8257; email address: sherlock.scott@epa.gov. For general information contact: The TSCA-Hotline, ABVI-Goodwill, 422 South Clinton Ave., Rochester, NY 14620; telephone number: (202) 554– 1404; email address: TSCA-Hotline@ epa.gov. SUPPLEMENTARY INFORMATION: asabaliauskas on DSKBBXCHB2PROD with NOTICES DATES: II. What action is the Agency taking? Under EPA contract number EP–W– 17–008, contractor and subcontractors SRC of 7502 Round Pond Road, North Syracuse, NY; BeakerTree Corporation of 2451 Crystal Drive, Suite 475, Arlington, VA; Essential Software, Inc. of 9024 Mistwood Drive, Potomac, MD; and Versar, Inc. of 6850 Versar Center, Springfield, VA will assist the Office of Pollution Prevention and Toxics (OPPT) by providing support in scientific health and environmental assessments; risk VerDate Sep<11>2014 20:56 Jul 06, 2017 Jkt 241001 Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EISs) Filed 06/26/2017 Through 06/30/2017 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its PO 00000 Frm 00050 Fmt 4703 Sfmt 9990 31597 comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20170117, Final Supplement, FHWA, AK, Gravina Access Project, Review Period Ends: 08/06/2017, Contact: Karen Pinell 907–586–7158. EIS No. 20170118, Draft, BLM, WY, Normally Pressured Lance Natural Gas Development Project, Comment Period Ends: 08/21/2017, Contact: Susan (Liz) Daily 307–367–5310. EIS No. 20170119, Draft, AFS, CA, Mammoth Base Area Land Exchange, Comment Period Ends: 08/21/2017, Contact: Janelle Walker 760–924– 5523. EIS No. 20170120, Draft, USFS, CA, Highway 89 Safety Enhancement and Forest Ecosystem Restoration Project, Comment Period Ends: 08/21/2017, Contact: Ann Glubczynski 530–964– 2184. EIS No. 20170121, Final Supplement, USN, NAT, Surveillance Towed Array Sensor System (SURTASS LFA) Sonar, Review Period Ends: 08/07/ 2017, Contact: CDR Patrick Havel 703–695–8266. EIS No. 20170122, Draft Supplement, USFS, CO, Rico West Dolores Roads and Trails Travel Management Project, Comment Period Ends: 08/21/ 2017, Contact: Deborah Kill 970–882– 6822. EIS No. 20170123, Draft, USFS, OR, Lobert Restoration Project, Comment Period Ends: 08/21/2017, Contact: Kyle Gomez 541–883–6734. EIS No. 20170124, Draft, FRA, NJ, Hudson Tunnel Project, Comment Period Ends: 08/21/2017, Contact: Amishi Castelli 617–431–0416. Amended Notices EIS No. 20170114, Draft, USN, PRO, Atlantic Fleet Training and Testing, Comment Period Ends: 08/29/2017, Contact: Todd Kraft 757–836–2943 Revision of the FR Notice Published 06/30/2017; Correction to Comment Period Ends from 08/14/2017 to 08/ 29/2017. Dated: July 3, 2017. Dawn Roberts, Management Analyst, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2017–14284 Filed 7–6–17; 8:45 am] BILLING CODE 6560–50–P E:\FR\FM\07JYN1.SGM 07JYN1

Agencies

[Federal Register Volume 82, Number 129 (Friday, July 7, 2017)]
[Notices]
[Page 31597]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-14284]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9034-1]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EISs)
Filed 06/26/2017 Through 06/30/2017
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20170117, Final Supplement, FHWA, AK, Gravina Access Project, 
Review Period Ends: 08/06/2017, Contact: Karen Pinell 907-586-7158.
EIS No. 20170118, Draft, BLM, WY, Normally Pressured Lance Natural Gas 
Development Project, Comment Period Ends: 08/21/2017, Contact: Susan 
(Liz) Daily 307-367-5310.
EIS No. 20170119, Draft, AFS, CA, Mammoth Base Area Land Exchange, 
Comment Period Ends: 08/21/2017, Contact: Janelle Walker 760-924-5523.
EIS No. 20170120, Draft, USFS, CA, Highway 89 Safety Enhancement and 
Forest Ecosystem Restoration Project, Comment Period Ends: 08/21/2017, 
Contact: Ann Glubczynski 530-964-2184.
EIS No. 20170121, Final Supplement, USN, NAT, Surveillance Towed Array 
Sensor System (SURTASS LFA) Sonar, Review Period Ends: 08/07/2017, 
Contact: CDR Patrick Havel 703-695-8266.
EIS No. 20170122, Draft Supplement, USFS, CO, Rico West Dolores Roads 
and Trails Travel Management Project, Comment Period Ends: 08/21/2017, 
Contact: Deborah Kill 970-882-6822.
EIS No. 20170123, Draft, USFS, OR, Lobert Restoration Project, Comment 
Period Ends: 08/21/2017, Contact: Kyle Gomez 541-883-6734.
EIS No. 20170124, Draft, FRA, NJ, Hudson Tunnel Project, Comment Period 
Ends: 08/21/2017, Contact: Amishi Castelli 617-431-0416.

Amended Notices

EIS No. 20170114, Draft, USN, PRO, Atlantic Fleet Training and Testing, 
Comment Period Ends: 08/29/2017, Contact: Todd Kraft 757-836-2943 
Revision of the FR Notice Published 06/30/2017; Correction to Comment 
Period Ends from 08/14/2017 to 08/29/2017.

    Dated: July 3, 2017.
Dawn Roberts,
Management Analyst, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2017-14284 Filed 7-6-17; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.