The following is a list of off-therecord communications recently
received by the Secretary of the
Docket No.
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
File date
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
Presenter or requester
Prohibited:
1. CP16–22–000 .......................................
Exempt:
1. P–12966–004 .......................................
2. CP16–10–000 .......................................
6–15–2017
Cheryl L. Urban.
6–12–2017
6–15–2017
3. P–1494–437 .........................................
4. P–2809–034 .........................................
6–16–2017
6–22–2017
U.S. Congress.1
U.S. House Representative.
H. Morgan Griffith.
U.S. Congress.2
FERC Staff.3
1 Senators
Orrin G. Hatch and Mike Lee. House Representatives Chris Stewart, Rob Bishop, Jason Chaffetz, and Mia Love.
James M. Inhofe and James Lakeford. House Representatives Markwayne Mullin and Jim Bridenstine.
3 Telephone Record reporting call on June 20, 2017 with Andrew Qua of Kleinschmidt Associates.
2 Senators
Dated: June 27, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–13955 Filed 6–30–17; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ENERGY REGULATORY
COMMISSION
Combined Notice of Filings
sradovich on DSK3GMQ082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR17–50–000.
Applicants: Rocky Mountain Natural
Gas LLC.
Description: Tariff filing per
284.123(b),(e)/: Revised Statement of
Operating Conditions to be effective 6/
22/2017; Filing Type: 1000.
Filed Date: 6/21/17.
Accession Number: 201706215104.
Comments/Protests Due: 5 p.m. ET 7/
12/17.
Docket Numbers: RP17–836–000.
Applicants: Granite State Gas
Transmission, Inc.
Description: Granite State Gas
Transmission, Inc. submits tariff filing
per 154.204: Section 4 Rate Change
Filing to be effective 8/1/2017.
Filed Date: 06/21/2017.
Accession Number: 20170621–5066.
Comment Date: 5:00 p.m. Eastern
Time on Monday, July 3, 2017.
Docket Numbers: RP17–837–000.
Applicants: MIGC LLC.
Description: Annual Fuel Retention
Percentage Tracker of MIGC LLC.
Filed Date: 06/21/2017.
Accession Number: 20170621–5133.
Comment Date: 5:00 p.m. Eastern
Time on Monday, July 3, 2017.
VerDate Sep<11>2014
17:53 Jun 30, 2017
Jkt 241001
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 22, 2017.
Nathaniel J. Davis, Sr.
Deputy Secretary.
[FR Doc. 2017–13962 Filed 6–30–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2487–004;
ER15–2380–002.
Applicants: Pacific Summit Energy
LLC, Willey Battery Utility, LLC.
Description: Triennial Market Power
Update for the Northeast Region of the
Sumitomo Companies, et al.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Filed Date: 6/27/17.
Accession Number: 20170627–5127.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER10–3069–007;
ER10–3070–007.
Applicants: Alcoa Power Generating
Inc., Alcoa Power Marketing LLC.
Description: Southeast Regional
Triennial Submission and Notice of
Change in Status of the Alcoa
Subsidiaries.
Filed Date: 6/27/17.
Accession Number: 20170627–5126.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17–1357–001.
Applicants: Duke Energy Progress,
LLC, Duke Energy Carolinas, LLC.
Description: Tariff Amendment: Joint
OATT DEP and DEC Real Power Loss
Factor Deficiency Filing to be effective
6/1/2017.
Filed Date: 6/27/17.
Accession Number: 20170627–5114.
Comments Due: 5 p.m. ET 7/18/17.
Docket Numbers: ER17–1379–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response in ER17–1379—Att
AE Section 8.4 Re-Pricing Clarification
to be effective 6/3/2017.
Filed Date: 6/27/17.
Accession Number: 20170627–5123.
Comments Due: 5 p.m. ET 7/18/17.
Docket Numbers: ER17–1916–000.
Applicants: Southern Maryland
Electric Cooperative, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
SMECO submits revisions to OATT, Sch
1A and Att. H–9C re: new distribution
rates to be effective 12/31/9998.
Filed Date: 6/27/17.
Accession Number: 20170627–5120.
Comments Due: 5 p.m. ET 7/18/17.
E:\FR\FM\03JYN1.SGM
03JYN1
Federal Register / Vol. 82, No. 126 / Monday, July 3, 2017 / Notices
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 27, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–13961 Filed 6–30–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2246–065]
sradovich on DSK3GMQ082PROD with NOTICES
Yuba County Water Agency; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: 2246–065.
c. Date filed: April 28, 2014.
d. Applicant: Yuba County Water
Agency (YCWA).
e. Name of Project: Yuba River
Development Project.
f. Location: The Yuba River
Development Project facilities are
located on the western slope of the
Sierra Nevada on the main stems of the
Yuba River, the North Yuba River, the
Middle Yuba River, and Oregon Creek (a
tributary to the Middle Yuba River) in
Yuba, Sierra, and Nevada Counties,
California. Portions of the project
occupy lands of the Plumas and Tahoe
National Forests.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
VerDate Sep<11>2014
17:53 Jun 30, 2017
Jkt 241001
h. Applicant Contact: Curt Aikens,
General Manager, Yuba County Water
Agency, 1220 F Street, Marysville,
California 95901, 530–741–6278.
i. FERC Contact: Alan Mitchnick at
(202) 502–6074 or alan.mitchnick@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2246–065.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. New Colgate Development: The New
Colgate development consists of the
following existing facilities: (1) The 70foot-high, 368-foot-long Our House
diversion dam with a storage capacity of
280 acre-feet, located on the Middle
Yuba River 12.0 miles upstream of its
confluence with the North Yuba River;
(2) the 12.5-foot-high by 12.5-foot-wide,
19,410-foot-long Lohman Ridge
diversion tunnel that conveys a
maximum flow of 860 cubic feet per
second (cfs) from the Middle Yuba River
to Oregon Creek; (3) the 42.5-foot-high
and 105-foot-radius Log Cabin diversion
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
30849
dam on Oregon Creek with a storage
capacity of 90 acre-feet; (4) the 6,107foot-long Camptonville diversion
tunnel, with the capacity to convey
1,100 cfs of water to New Bullards Bar
reservoir on the North Yuba River; (5)
the 645-foot-high, 2,323-foot-long New
Bullards Bar dam located on the North
Yuba River about 2.3 miles upstream of
its confluence with the Middle Yuba
River, with an actual release capacity of
1,250 cfs; (6) the New Bullards Bar
reservoir, a storage reservoir on the
North Yuba River formed by New
Bullards Bar dam, with a storage area of
4,790 acres; (7) the New Bullards Bar
dam overflow-type spillway with a
width of 106 feet and a crest elevation
of 1,902 feet; (8) the 5.2-mile-long New
Colgate Power tunnel and penstock,
with a maximum flow capacity of 3,500
cfs; (9) the New Colgate powerhouse,
located adjacent to the Yuba River
containing two Pelton type turbines
with a total generating capacity of 315
megawatts (MW); (10) the New Colgate
switchyard, located adjacent to the New
Colgate powerhouse; (11) recreation
facilities on New Bullards Bar reservoir,
including Emerald Cove Marina,
Hornswoggle Group Camp, Schoolhouse
Family Camp, Dark Day Campground,
Dark Day Boat Ramp, Garden Point
Campground, Madrone Cove
Campground, and Cottage Creek Boat
Ramp; and (12) appurtenant facilities
and features including access roads.
YCWA proposes to: (1) Construct a
flood control outlet at New Bullards Bar
dam; (2) construct a tailwater
depression system at New Colgate
powerhouse; (3) modify the Our House
diversion dam fish release outlet; (4)
modify the Log Cabin diversion dam
fish release outlet; (5) modify the
Lohman Ridge diversion tunnel intake;
(6) modify recreation facilities at New
Bullards Bar reservoir, including
construction of Kelly Ridge campground
and recreation vehicle dump station;
and (7) modify project roads.
New Bullards Bar Minimum Flow
Development: The New Bullards Bar
Minimum Flow Development consists
of the following existing facilities: (1)
The 70-foot long, 12-inch-diameter New
Bullards minimum flow powerhouse
penstock with a maximum flow capacity
of 6 cfs; (2) the New Bullards minimum
flow powerhouse, containing a single
Pelton turbine with a capacity of 150
kilowatts; (3) the New Bullards
minimum flow transformer, located
adjacent to the New Bullards minimum
flow powerhouse; and (4) appurtenant
facilities and features, including access
roads.
Narrows 2 Development: The Narrows
2 Development consists of the following
E:\FR\FM\03JYN1.SGM
03JYN1
Agencies
[Federal Register Volume 82, Number 126 (Monday, July 3, 2017)]
[Notices]
[Pages 30848-30849]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-13961]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2487-004; ER15-2380-002.
Applicants: Pacific Summit Energy LLC, Willey Battery Utility, LLC.
Description: Triennial Market Power Update for the Northeast Region
of the Sumitomo Companies, et al.
Filed Date: 6/27/17.
Accession Number: 20170627-5127.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER10-3069-007; ER10-3070-007.
Applicants: Alcoa Power Generating Inc., Alcoa Power Marketing LLC.
Description: Southeast Regional Triennial Submission and Notice of
Change in Status of the Alcoa Subsidiaries.
Filed Date: 6/27/17.
Accession Number: 20170627-5126.
Comments Due: 5 p.m. ET 8/28/17.
Docket Numbers: ER17-1357-001.
Applicants: Duke Energy Progress, LLC, Duke Energy Carolinas, LLC.
Description: Tariff Amendment: Joint OATT DEP and DEC Real Power
Loss Factor Deficiency Filing to be effective 6/1/2017.
Filed Date: 6/27/17.
Accession Number: 20170627-5114.
Comments Due: 5 p.m. ET 7/18/17.
Docket Numbers: ER17-1379-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: Deficiency Response in ER17-1379--
Att AE Section 8.4 Re-Pricing Clarification to be effective 6/3/2017.
Filed Date: 6/27/17.
Accession Number: 20170627-5123.
Comments Due: 5 p.m. ET 7/18/17.
Docket Numbers: ER17-1916-000.
Applicants: Southern Maryland Electric Cooperative, Inc., PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: SMECO submits revisions to
OATT, Sch 1A and Att. H-9C re: new distribution rates to be effective
12/31/9998.
Filed Date: 6/27/17.
Accession Number: 20170627-5120.
Comments Due: 5 p.m. ET 7/18/17.
[[Page 30849]]
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 27, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-13961 Filed 6-30-17; 8:45 am]
BILLING CODE 6717-01-P