Drawbridge Operation Regulation; Quantuck Canal, Westhampton Beach, NY, 30735-30736 [2017-13854]
Download as PDF
Federal Register / Vol. 82, No. 126 / Monday, July 3, 2017 / Rules and Regulations
the users of the waterway through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–0538]
Drawbridge Operation Regulation;
China Basin, San Francisco, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the 3rd Street
Drawbridge across China Basin, mile
0.0, at San Francisco, CA. The deviation
is necessary to allow participants to
cross the bridge, uninterrupted, during
the San Francisco Marathon. This
deviation allows the bridge to remain in
the closed-to-navigation position during
the deviation period.
DATES: This deviation is effective from
6 a.m. to 2 p.m. on July 23, 2017.
ADDRESSES: The docket for this
deviation [USCG–2017–0538], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516; email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION: The City
of San Francisco has requested a
temporary change to the operation of the
3rd Street Drawbridge, mile 0.0, over
China Basin, at San Francisco, CA. The
drawbridge navigation span provides a
vertical clearance of 3 feet above Mean
High Water in the closed-to-navigation
position. The draw opens on signal if at
least one hour notice is given, as
required by 33 CFR 117.149. Navigation
on the waterway is recreational.
The drawspan will be secured in the
closed-to-navigation position from 6
a.m. to 2 p.m. on July 23, 2017, to allow
participants to cross the bridge,
uninterrupted, during the San Francisco
Marathon. This temporary deviation has
been coordinated with the waterway
users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridge in the closed position may do so
at anytime. The bridge will be able to
open for emergencies. There is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
sradovich on DSK3GMQ082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
17:08 Jun 30, 2017
Jkt 241001
Dated: June 27, 2017.
C.T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2017–13923 Filed 6–30–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–0325]
Drawbridge Operation Regulation;
Quantuck Canal, Westhampton Beach,
NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the West Bay
Bridge across the Quantuck Canal, mile
0.1 at Westhampton Beach, New York.
This action is necessary to complete
rehabilitation of the bascule leaves of
the drawbridge. The deviation will
allow the bridge to open only one
bascule span in order to provide passage
for vessels requiring an opening.
DATES: This deviation is effective from
12:01 a.m. on October 2, 2017 to 11:59
p.m. on March 30, 2018.
ADDRESSES: The docket for this
deviation, USCG–2017–0325, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email James M. Moore,
Bridge Management Specialist, First
District Bridge Branch, U.S. Coast
Guard; telephone 212–514–4334, email
james.m.moore2@uscg.mil.
SUPPLEMENTARY INFORMATION: The
Suffolk County Department of Public
SUMMARY:
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
30735
Works, the owner of the bridge,
requested a temporary deviation in
order to facilitate reconstruction of the
bascule leaves.
The West Bay Bridge across the
Quantuck Canal, mile 0.1, at
Westhampton Beach, New York is a
double-leaf bascule bridge offering
mariners a vertical clearance of 11 feet
at mean high water and 13.3 feet at
mean low water in the closed position.
Horizontal clearance is 50 feet.
Utilization of a work barge placed
underneath one of the bascule leaves
will reduce horizontal clearance to 25
feet. The existing drawbridge operating
regulations are listed at 33 CFR
117.799(d).
This temporary deviation will allow
the Beach Lane Bridge to open only one
of the two bascule spans for bridge
openings from 12:01 a.m. on October 2,
2017 to 11:59 p.m. on March 30, 2018.
Dual lift span operations will be
available, provided 48 hours of advance
notice is furnished to the owner of the
bridge.
The majority of vessels requiring
bridge openings are sailing vessels and
yachts transiting the waterway.
Discussion with the proprietor of the
Modern Yachts Marina located in the
vicinity of the bridge confirms typical
recreational traffic will continue to be
able to proceed through the navigation
opening of the bridge during one-leaf
operations. Moreover, the bulk of
recreational traffic that utilizes the
waterway is largely seasonal in nature,
peaking during the late spring, summer
and early autumn months. Little to no
recreational traffic transits the Quantuck
Canal throughout the winter. Small
scale tug/barge combinations
occasionally transit the Quantuck Canal,
but such commercial craft are generally
limited in size. Mariners concur that the
requirement to provide the bridge owner
48 hours of advance notice for dual lift
span operations will not impede overall
operations.
Vessels that can pass under the bridge
without an opening may do so at all
times. The bridge will be able to open
for emergencies and there is an alternate
route for vessels unable to pass through
the bridge when in the closed position.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so vessel operators can
arrange their transits to minimize any
impact caused by this temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
E:\FR\FM\03JYR1.SGM
03JYR1
30736
Federal Register / Vol. 82, No. 126 / Monday, July 3, 2017 / Rules and Regulations
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 15, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2017–13854 Filed 6–30–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2017–0356]
Drawbridge Operation Regulation;
Sloop Channel, Hempstead, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Wantagh State
Parkway Bridge across Sloop Channel,
mile 15.4, at Hempstead, New York.
This deviation is necessary in order to
facilitate an annual fireworks display
and allows the bridge to remain in the
closed position.
DATES: This deviation is effective from
9 p.m. to 11:59 p.m. on July 4, 2017.
ADDRESSES: The docket for this
deviation, USCG–2017–0356, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email James M. Moore,
Bridge Management Specialist, First
District Bridge Branch, U.S. Coast
Guard; telephone 212–514–4334, email
james.m.moore2@uscg.mil.
SUPPLEMENTARY INFORMATION: The New
York State Office of Parks, Recreation,
and Historic Preservation with
concurrence of the bridge owner, the
New York State Department of
Transportation, requested a temporary
deviation from the normal operating
schedule to facilitate a public fireworks
event.
The Wantagh Parkway Bridge, mile
15.4, across Sloop Channel, has a
vertical clearance of 20 feet at mean
high water and 21.8 feet at mean low
water in the closed position. The
existing drawbridge operating regulation
is listed at 33 CFR 117.5.
sradovich on DSK3GMQ082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
17:08 Jun 30, 2017
Jkt 241001
The temporary deviation will allow
the Wantagh Parkway Bridge to remain
closed from 9 p.m. through 11:59 p.m.
on July 4, 2017. The waterway is used
primarily by seasonal recreational
vessels and occasional tug/barge traffic.
Coordination with waterway users has
indicated no objections to the proposed
short-term closure of the draw.
Vessels that can pass under the bridge
without an opening may do so at all
times. The bridge will be able to open
for emergencies. There is no alternate
route for vessels to pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 27, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2017–13915 Filed 6–30–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
The regulations in 33 CFR
165.943(a)(4) and (b) will be enforced
from 9:30 p.m. through 11:00 p.m. on
July 1, 2017, for the Cornucopia 4th of
July Fireworks Display safety zone,
located in § 165.943(a)(4).
FOR FURTHER INFORMATION CONTACT: If
you have questions on this document,
call or email LT John Mack, Chief of
Waterways Management, Coast Guard;
telephone (218) 725–3818, email
john.v.mack@uscg.mil.
SUPPLEMENTARY INFORMATION: The Coast
Guard will enforce the safety zone for
the annual Cornucopia 4th of July
Fireworks Display in 33 CFR
165.943(a)(4) and (b) from 9:30 p.m.
through 11:00 p.m. on July 1, 2017 on
all waters of Siskiwit Bay bounded by
the arc of a circle with a 420-foot radius
from the fireworks launch site with it
center in position 46°51′35″ N.,
091°06′15″ W.
Entry into, transiting, or anchoring
within the safety zone is prohibited
unless authorized by the Captain of the
Port Duluth or her designated on-scene
representative. The Captain of the Port’s
designated on-scene representative may
be contacted via VHF Channel 16 or via
telephone at (715) 779–5100. This
document is issued under authority of
33 CFR 165.943 and 5 U.S.C. 552(a). In
addition to this publication in the
Federal Register, the Coast Guard will
provide the maritime community with
advance notification of the enforcement
of this safety zone via Broadcast Notice
to Mariners. The Captain of the Port
Duluth or her on-scene representative
may be contacted via VHF Channel 16
or via telephone at (715) 779–5100.
DATES:
Dated: June 22, 2017.
E.E. Williams,
Commander, U.S. Coast Guard, Captain of
the Port.
[Docket No. USCG–2017–0561]
Safety Zones; Cornucopia 4th of July
Fireworks Display, Siskiwit Bay,
Cornucopia, WI
Coast Guard, DHS.
Notice of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
the safety zone for the Cornucopia 4th
of July Fireworks Display in
Cornucopia, WI from 9:30 p.m. through
11:00 p.m. on July 1, 2017. This action
is necessary to protect participants and
spectators during the Cornucopia 4th of
July Fireworks Display. During the
enforcement period, entry into,
transiting, or anchoring within the
safety zone is prohibited unless
authorized by the Captain of the Port
Duluth or her designated on-scene
representative.
[FR Doc. 2017–13563 Filed 6–30–17; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
SUMMARY:
PO 00000
Frm 00016
Fmt 4700
Sfmt 4700
33 CFR Part 165
[Docket Number USCG–2017–0558]
RIN 1625–AA00
Safety Zone; Garlock Wedding; Saint
Lawrence River, Alexandria Bay, NY
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a temporary safety zone on
the Saint Lawrence River, Alexandria
SUMMARY:
E:\FR\FM\03JYR1.SGM
03JYR1
Agencies
[Federal Register Volume 82, Number 126 (Monday, July 3, 2017)]
[Rules and Regulations]
[Pages 30735-30736]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-13854]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-0325]
Drawbridge Operation Regulation; Quantuck Canal, Westhampton
Beach, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the West Bay Bridge across the Quantuck
Canal, mile 0.1 at Westhampton Beach, New York. This action is
necessary to complete rehabilitation of the bascule leaves of the
drawbridge. The deviation will allow the bridge to open only one
bascule span in order to provide passage for vessels requiring an
opening.
DATES: This deviation is effective from 12:01 a.m. on October 2, 2017
to 11:59 p.m. on March 30, 2018.
ADDRESSES: The docket for this deviation, USCG-2017-0325, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email James M. Moore, Bridge Management
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone
212-514-4334, email james.m.moore2@uscg.mil.
SUPPLEMENTARY INFORMATION: The Suffolk County Department of Public
Works, the owner of the bridge, requested a temporary deviation in
order to facilitate reconstruction of the bascule leaves.
The West Bay Bridge across the Quantuck Canal, mile 0.1, at
Westhampton Beach, New York is a double-leaf bascule bridge offering
mariners a vertical clearance of 11 feet at mean high water and 13.3
feet at mean low water in the closed position. Horizontal clearance is
50 feet. Utilization of a work barge placed underneath one of the
bascule leaves will reduce horizontal clearance to 25 feet. The
existing drawbridge operating regulations are listed at 33 CFR
117.799(d).
This temporary deviation will allow the Beach Lane Bridge to open
only one of the two bascule spans for bridge openings from 12:01 a.m.
on October 2, 2017 to 11:59 p.m. on March 30, 2018. Dual lift span
operations will be available, provided 48 hours of advance notice is
furnished to the owner of the bridge.
The majority of vessels requiring bridge openings are sailing
vessels and yachts transiting the waterway. Discussion with the
proprietor of the Modern Yachts Marina located in the vicinity of the
bridge confirms typical recreational traffic will continue to be able
to proceed through the navigation opening of the bridge during one-leaf
operations. Moreover, the bulk of recreational traffic that utilizes
the waterway is largely seasonal in nature, peaking during the late
spring, summer and early autumn months. Little to no recreational
traffic transits the Quantuck Canal throughout the winter. Small scale
tug/barge combinations occasionally transit the Quantuck Canal, but
such commercial craft are generally limited in size. Mariners concur
that the requirement to provide the bridge owner 48 hours of advance
notice for dual lift span operations will not impede overall
operations.
Vessels that can pass under the bridge without an opening may do so
at all times. The bridge will be able to open for emergencies and there
is an alternate route for vessels unable to pass through the bridge
when in the closed position.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so vessel operators can arrange their transits
to minimize any impact caused by this temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this
[[Page 30736]]
temporary deviation. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 15, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-13854 Filed 6-30-17; 8:45 am]
BILLING CODE 9110-04-P