power plants and other large
combustion sources in the eastern
United States. NOX is a prime ingredient
in the formation of ground-level ozone
(smog), a pervasive air pollution
problem in many areas of the eastern
United States. The NOX Budget Trading
Program was designed to reduce NOX
emissions during the warm summer
months, referred to as the ozone season,
when ground-level ozone
concentrations are highest. In 2009 the
program was replaced by an ozoneseason NOX trading program under the
Clean Air Interstate Rule (CAIR), which
has in turn been replaced by ozoneseason NOX trading programs under the
Cross-State Air Pollution Rule (CSAPR).
Although the NOX Budget Trading
Program was replaced after the 2008
compliance season, this information
collection is being renewed because
some industrial sources in certain States
are still required to monitor and report
emissions data to EPA under these
rules, so we will account for their
burden. All data received by EPA will
be treated as public information. An
agency may not conduct or sponsor, and
a person is not required to respond to,
a collection of information unless it
displays a currently valid OMB control
number. The OMB control numbers for
EPA’s regulations in 40 CFR are listed
in 40 CFR part 9.
Form Numbers: None.
Respondents/affected entities: Entities
potentially affected by this action are
those which participate in the NOX
Budget Trading Program to Reduce the
Regional Transport of Ozone.
Respondent’s obligation to respond:
mandatory (Sections 110(a) and 301(a)
of the Clean Air Act).
Estimated number of respondents:
EPA estimates that there are 122 former
NOX Budget Trading Program units that
will continue to conduct monitoring in
accordance with Part 75 solely under
the NOX SIP call.
Frequency of response: Yearly,
quarterly, occasionally.
Total estimated burden: 57,586 hours
(per year). Burden is defined at 5 CFR
1320.03(b)
Total estimated cost: $8,066,616 (per
year), includes $3,777,000 annualized
capital or operation & maintenance
costs.
Changes in Estimates: There is no
increase in hours in the total estimated
respondent burden compared with the
ICR currently approved by OMB.
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
Dated: May 31, 2017.
Richard A. Haeuber,
Acting Director, Clean Air Markets Division,
Office of Atmospheric Programs, Office of
Air and Radiation.
[FR Doc. 2017–13676 Filed 6–28–17; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9962–16–OECA]
See the Item Specific Docket Numbers
Provided in the Text: Proposed
Information Collection Request;
Comment Request; See Item Specific
ICR Titles Provided in the Text
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit the below
listed information collection requests
(ICRs) (See item specific ICR title, EPA
ICR Number and OMB Control Number
provided in the text) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. Before
doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection as
described below. These are proposed
extension of 70 currently approved
ICRs, and request for approval of two
new collections. An Agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
DATES: Comments must be submitted on
or before August 28, 2017.
ADDRESSES: Submit your comments,
referencing the Docket ID numbers
provided for each item in the text,
online using www.regulations.gov (our
preferred method), by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW.,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
SUMMARY:
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460; telephone number: (202)
564–2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. Burden is defined at 5 CFR
1320.03(b). EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
General Abstract: For all the listed
ICRs in this notice, owners and
operators of affected facilities are
required to comply with reporting and
record keeping requirements for the
general provisions of 40 CFR part 60,
subpart A or Part 63, Subpart A, as well
as the applicable specific standards.
This includes submitting initial
notifications, performance tests and
periodic reports and results, and
maintaining records of the occurrence
and duration of any startup, shutdown,
or malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
inoperative. These reports are used by
EPA to determine compliance with the
standards.
(1) Docket ID Number: EPA–HQ–
OECA–2013–0019; Title: NSPS for
Electric Utility Steam Generating Units
(40 CFR part 60, subpart Da); EPA ICR
Number 1053.12; OMB Control Number
2060–0023; Expiration Date: December
31, 2017.
Respondents: Electric utility steam
generating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart Da).
Estimated number of respondents:
699 (total).
Frequency of response: Initially and
semiannually.
Estimated annual burden: 168,000
hours.
Estimated annual cost: $29,200,000,
includes $12,700,000 annualized capital
or operation & maintenance (O&M)
costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(2) Docket ID Number: EPA–HQ–
OECA–2013–0332; Title: NSPS for
Small Industrial-CommercialInstitutional Steam Generating Units (40
CFR part 60, subpart Dc); EPA ICR
Number 1564.10; OMB Control Number
2060–0202; Expiration Date: December
31, 2017.
Respondents: Industrial-commercialinstitutional steam generating units with
maximum design heat input capacity of
29 megawatts (MW) or less, but greater
than or equal to 2.9 MW.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart Dc).
Estimated number of respondents:
268 (total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 182,000
hours.
Annual estimated cost: $28,600,000,
includes $10,800,000 annualized capital
or O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(3) Docket ID Number: EPA–HQ–
OECA–2013–0326; Title: NSPS for
Asphalt Processing and Roofing
Manufacturing (40 CFR part 60, subpart
UU); EPA ICR Number 0661.12; OMB
Control Number 2060–0002; Expiration
Date: April 30, 2018.
Respondents: Asphalt processing and
roofing manufacture plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
UU).
Estimated number of respondents:
144 (total).
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 33,900
hours.
Annual estimated cost: $8,560,000,
includes $5,240,000 annualized capital
or O&M costs.
Changes in Estimates: There is a
projected increase in burden due to
reconstruction of existing sources.
(4) Docket ID Number: EPA–HQ–
OECA–2014–0028; Title: NSPS for
Calciners and Dryers in Mineral
Industries (40 CFR part 60, subpart
UUU); EPA ICR Number 0746.10; OMB
Control Number 2060–0251; Expiration
Date: April 30, 2018.
Respondents: Calciners and dryers at
mineral facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
UUU).
Estimated number of respondents:
167 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 6,440
hours.
Annual estimated cost: $739,000,
includes $109,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(5) Docket ID Number: EPA–HQ–
OECA–2013–0324; Title: NESHAP for
Marine Tank Vessel Loading Operations
(40 CFR part 63, subpart Y); EPA ICR
Number 1679.10; OMB Control Number
2060–0289; Expiration Date: April 30,
2018.
Respondents: Marine tank vessel
loading plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart Y).
Estimated number of respondents:
804 (total).
Frequency of response: Initially and
annually.
Annual estimated burden: 9,890
hours.
Annual estimated cost: $968,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(6) Docket ID Number: EPA–HQ–
OECA–2013–0347; Title: NESHAP for
Epoxy Resin and Non-Nylon Polyamide
Production (40 CFR part 63, subpart W);
EPA ICR Number 1681.09; OMB Control
Number 2060–0290; Expiration Date:
April 30, 2018.
Respondents: Epoxy resin and nonnylon polyamide plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart W).
Estimated number of respondents: 7
(total).
Frequency of response: Initially,
occasionally and semiannually.
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
29553
Annual estimated burden: 3,960
hours.
Annual estimated cost: $390,000,
includes $9,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(7) Docket ID Number: EPA–HQ–
OECA–2014–0056; Title: NESHAP for
Shipbuilding and Ship Repair
Facilities—Surface Coating (40 CFR part
63, subpart II); EPA ICR Number
1712.10; OMB Control Number 2060–
0330; Expiration Date: April 30, 2018.
Respondents: Shipbuilding and repair
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart II).
Estimated number of respondents: 56
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 28,600
hours.
Annual estimated cost: $2,800,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(8) Docket ID Number: EPA–HQ–
OECA–2013–0351; Title: NESHAP for
Solvent Extraction for Vegetable Oil
Production (40 CFR part 63, subpart
GGGG); EPA ICR Number 1947.07; OMB
Control Number 2060–0471; Expiration
Date: April 30, 2018.
Respondents: Vegetable oil
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
GGGG).
Estimated number of respondents: 89
(total).
Frequency of response: Initially and
annually.
Annual estimated burden: 34,700
hours.
Annual estimated cost: $3,340,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is a
projected increase in burden due to
reconstruction of existing sources.
(9) Docket ID Number: EPA–HQ–
OECA–2014–0080; Title: NESHAP for
Cellulose Products Manufacturing (40
CFR part 63, subpart UUUU); EPA ICR
Number 1974.08; OMB Control Number
2060–0488; Expiration Date: April 30,
2018.
Respondents: Cellulose products
manufacturing plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
UUUU).
Estimated number of respondents: 13
(total).
Frequency of response: Initially and
semiannually.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
29554
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Annual estimated burden: 12,100
hours.
Annual estimated cost: $1,180,000,
includes $1,010 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(10) Docket ID Number: EPA–HQ–
OECA–2014–0041; Title: NSPS for Glass
Manufacturing Plants (40 CFR part 60,
subpart CC); EPA ICR Number 1131.11;
OMB Control Number 2060–0054;
Expiration Date: May 31, 2018.
Respondents: Glass manufacturing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart CC).
Estimated number of respondents: 41
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 803 hours.
Annual estimated cost: $315,000,
includes $238,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(11) Docket ID Number: EPA–HQ–
OECA–2013–0349; Title: NESHAP for
Pharmaceutical Production (40 CFR part
63, subpart GGG); EPA ICR Number
1781.08; OMB Control Number 2060–
0358; Expiration Date: May 31, 2018.
Respondents: Pharmaceutical
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
GGG).
Estimated number of respondents: 27
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 44,300
hours.
Annual estimated cost: $4,440,000,
includes $112,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(12) Docket ID Number: EPA–HQ–
OECA–2013–0322; Title: NESHAP for
Beryllium Rocket Motor Fuel Firing (40
CFR part 61, subpart D); EPA ICR
Number 1125.08; OMB Control Number
2060–0394; Expiration Date: May 31,
2018.
Respondents: Beryllium rocket static
test firing or beryllium propellant
disposal facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart D).
Estimated number of respondents: 1
(total).
Frequency of response: Initially and
occasionally.
Annual estimated burden: 9 hours.
Annual estimated cost: $930, includes
no annualized capital or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
(13) Docket ID Number: EPA–HQ–
OECA–2013–0356; Title: NESHAP for
Group I Polymers and Resins (40 CFR
part 63, subpart U); EPA ICR Number
2410.04; OMB Control Number 2060–
0665; Expiration Date: May 31, 2018.
Respondents: Facilities with
elastomer product process units and
associated equipment.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart U).
Estimated number of respondents: 5
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 315 hours.
Annual estimated cost: $16,800,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(14) Docket ID Number: EPA–HQ–
OECA–2013–0348; Title: NESHAP for
Primary Aluminum Reduction Plants
(40 CFR part 63, subpart LL); EPA ICR
Number 1767.08; OMB Control Number
2060–0360; Expiration Date: June 30,
2018.
Respondents: Primary aluminum
reduction plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart LL).
Estimated number of respondents: 16
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 80,400
hours.
Annual estimated cost: $7,600,000,
includes $91,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(15) Docket ID Number: EPA–HQ–
OECA–2013–0323; Title: NESHAP for
Area Sources: Electric Arc Furnace
Steelmaking Facilities (40 CFR part 63,
subpart YYYYY); EPA ICR Number
2277.05; OMB Control Number 2060–
0608; Expiration Date: June 30, 2018.
Respondents: Area source electric arc
furnace steelmaking facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
YYYYY).
Estimated number of respondents: 87
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 1,420
hours.
Annual estimated cost: $136,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(16) Docket ID Number: EPA–HQ–
OECA–2014–0027; Title: NSPS for Bulk
Gasoline Terminals (40 CFR part 60,
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
subpart XX); EPA ICR Number 0664.12;
OMB Control Number 2060–0006;
Expiration Date: August 31, 2018.
Respondents: Bulk gasoline terminals.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
XX).
Estimated number of respondents: 40
(total).
Frequency of response: Initially and
occasionally.
Annual estimated burden: 13,200
hours.
Annual estimated cost: $1,290,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(17) Docket ID Number: EPA–HQ–
OECA–2013–0327; Title: NSPS for
Portland Cement Plants (40 CFR part 60,
subpart F); EPA ICR Number 1051.14;
OMB Control Number 2060–0025;
Expiration Date: August 31, 2018.
Respondents: Portland cement plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart F).
Estimated number of respondents: 96
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 14,500
hours.
Annual estimated cost: $2,190,000,
includes $774,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(18) Docket ID Number: EPA–HQ–
OECA–2014–0043; Title: NSPS for
Polymeric Coating of Supporting
Substrates Facilities (40 CFR part 60,
subpart VVV); EPA ICR Number
1284.11; OMB Control Number 2060–
0181; Expiration Date: August 31, 2018.
Respondents: Polymeric coating
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
VVV).
Estimated number of respondents: 58
(total).
Frequency of response: Initially,
quarterly and semiannually.
Annual estimated burden: 13,700
hours.
Annual estimated cost: $2,000,000,
includes $658,000 annualized capital or
O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(19) Docket ID Number: EPA–HQ–
OECA–2014–0059; Title: NESHAP for
Natural Gas Transmission and Storage
(40 CFR part 63, subpart HHH); EPA ICR
Number 1789.10; OMB Control Number
2060–0418; Expiration Date: August 31,
2018.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Respondents: Facilities that transport
or store natural gas prior to entering the
pipeline.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
HHH).
Estimated number of respondents: 37
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 2,000
hours.
Annual estimated cost: $205,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(20) Docket ID Number: EPA–HQ–
OECA–2014–0085; Title: NESHAP for
Friction Materials Manufacturing (40
CFR part 63, subpart QQQQQ); EPA ICR
Number 2025.07; OMB Control Number
2060–0481; Expiration Date: August 31,
2018.
Respondents: Friction materials
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
QQQQQ).
Estimated number of respondents: 4
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 1,290
hours.
Annual estimated cost: $127,000,
includes $1,090 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(21) Docket ID Number: EPA–HQ–
OECA–2014–0099; Title: NESHAP for
Ferroalloys Production Area Sources (40
CFR part 63, subpart YYYYYY); EPA
ICR Number 2303.05; OMB Control
Number 2060–0625; Expiration Date:
August 31, 2018.
Respondents: Ferroalloys production
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
YYYYYY).
Estimated number of respondents: 10
(total).
Frequency of response: Initially and
annually.
Annual estimated burden: 345 hours.
Annual estimated cost: $33,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(22) Docket ID Number: EPA–HQ–
OECA–2013–0311; Title: Emission
Guidelines for Sewage Sludge
Incinerators (40 CFR part 60, subpart
MMMM); EPA ICR Number 2403.04;
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
OMB Control Number 2060–0661;
Expiration Date: August 31, 2018.
Respondents: Sewage sludge
incinerators constructed on or before
October 14, 2010.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
MMMM).
Estimated number of respondents:
110 (total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 29,100
hours.
Annual estimated cost: $7,580,000,
includes $4,730,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(23) Docket ID Number: EPA–HQ–
OECA–2014–0035; Title: NSPS for
Sulfuric Acid Plants (40 CFR part 60,
subpart H); EPA ICR Number 1057.14;
OMB Control Number 2060–0041;
Expiration Date: September 30, 2018.
Respondents: Sulfuric acid plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart H).
Estimated number of respondents: 53
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 13,400
hours.
Annual estimated cost: $1,550,000,
includes $239,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(24) Docket ID Number: EPA–HQ–
OECA–2014–0061; Title: NESHAP for
Chemical Recovery Combustion Sources
at Kraft, Soda, Sulfite and Stand-Alone
Semichemical Pulp Mills (40 CFR part
63, subpart MM); EPA ICR Number
1805.08; OMB Control Number 2060–
0377; Expiration Date: October 31, 2018.
Respondents: Kraft, soda, sulfite, and
stand-alone semichemical pulp mills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
MM).
Estimated number of respondents:
111 (total).
Frequency of response: Initially,
quarterly and semiannually.
Annual estimated burden: 124,000
hours.
Annual estimated cost: $13,000,000,
includes $712,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(25) Docket ID Number: EPA–HQ–
OECA–2014–0067; Title: NESHAP for
Primary Copper Smelters (40 CFR part
63, subpart QQQ); EPA ICR Number
1850.08; OMB Control Number 2060–
0476; Expiration Date: October 31, 2018.
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
29555
Respondents: Primary copper
smelters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
QQQ).
Estimated number of respondents: 3
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 9,380
hours.
Annual estimated cost: $927,000,
includes $8,220 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(26) Docket ID Number: EPA–HQ–
OECA–2014–0033; Title: NSPS for
Petroleum Refineries (40 CFR part 60,
subpart J); EPA ICR Number 1054.13;
OMB Control Number 2060–0022;
Expiration Date: November 30, 2018.
Respondents: Fluid catalytic cracking
unit catalyst regenerator or fuel gas
combustion device at petroleum
refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart J).
Estimated number of respondents:
150 (total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 15,800
hours.
Annual estimated cost: $2,260,000,
includes $719,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(27) Docket ID Number: EPA–HQ–
OECA–2014–0037; Title: NSPS for
Primary and Secondary Emissions from
Basic Oxygen Furnaces (40 CFR part 60,
subparts N and Na); EPA ICR Number
1069.12; OMB Control Number 2060–
0029; Expiration Date: November 30,
2018.
Respondents: Basic oxygen process
furnace at iron and steel plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts N
and Na).
Estimated number of respondents: 18
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 6,260
hours.
Annual estimated cost: $643,000,
includes $29,700 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(28) Docket ID Number: EPA–HQ–
OECA–2014–0038; Title: NESHAP for
Inorganic Arsenic Emissions from Glass
Manufacturing Plants (40 CFR part 61,
subpart N); EPA ICR Number 1081.12;
OMB Control Number 2060–0043;
Expiration Date: November 30, 2018.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
29556
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Respondents: Glass manufacturing
plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart N).
Estimated number of respondents: 16
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 3,080
hours.
Annual estimated cost: $366,000,
includes $56,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(29) Docket ID Number: EPA–HQ–
OECA–2014–0042; Title: NSPS for Lime
Manufacturing (40 CFR part 60, subpart
HH); EPA ICR Number 1167.12; OMB
Control Number 2060–0063; Expiration
Date: November 30, 2018.
Respondents: Lime manufacturing
plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
HH).
Estimated number of respondents: 41
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 3,770
hours.
Annual estimated cost: $441,000,
includes $61,500 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(30) Docket ID Number: EPA–HQ–
OECA–2013–0328; Title: NESHAP for
Vinyl Chloride (40 CFR part 61, subpart
F); EPA ICR Number 0186.14; OMB
Control Number 2060–0071; Expiration
Date: November 30, 2018.
Respondents: Ethylene dichloride,
vinyl chloride monomer, and polyvinyl
chloride plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart F).
Estimated number of respondents: 18
(total).
Frequency of response: Quarterly and
occasionally.
Annual estimated burden: 7,600
hours.
Annual estimated cost: $1,550,000,
includes $810,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(31) Docket ID Number: EPA–HQ–
OECA–2014–0040; Title: NSPS for Hot
Mix Asphalt Facilities (40 CFR part 60,
subpart I); EPA ICR Number 1127.12;
OMB Control Number 2060–0083;
Expiration Date: November 30, 2018.
Respondents: Hot mix asphalt
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart I).
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
Estimated number of respondents:
4,535 (total).
Frequency of response: Initially.
Annual estimated burden: 18,800
hours.
Annual estimated cost: $1,890,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(32) Docket ID Number: EPA–HQ–
OECA–2014–0026; Title: NSPS for
Metal Coil Surface Coating (40 CFR part
60, subpart TT); EPA ICR Number
0660.13; OMB Control Number 2060–
0107; Expiration Date: November 30,
2018.
Respondents: Metal coil surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart TT).
Estimated number of respondents:
158 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 15,600
hours.
Annual estimated cost: $1,860,000,
includes $332,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(33) Docket ID Number: EPA–HQ–
OECA–2014–0047; Title: NSPS for
Municipal Solid Waste Landfills (40
CFR part 60, subpart WWW); EPA ICR
Number 1557.10; OMB Control Number
2060–0220; Expiration Date: November
30, 2018.
Respondents: Municipal solid waste
landfills constructed, modified, or
reconstructed on or after May 30, 1991.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
WWW).
Estimated number of respondents:
195 (total).
Frequency of response: Initially,
occasionally and annually.
Annual estimated burden: 111,000
hours.
Annual estimated cost: $11,600,000,
includes $700,000 annualized capital or
O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(34) Docket ID Number: EPA–HQ–
OECA–2014–0055; Title: NESHAP for
Secondary Lead Smelter Industry (40
CFR part 63, subpart X); EPA ICR
Number 1686.11; OMB Control Number
2060–0296; Expiration Date: November
30, 2018.
Respondents: Secondary lead
smelters.
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart X).
Estimated number of respondents: 14
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 13,000
hours.
Annual estimated cost: $1,650,000,
includes $375,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(35) Docket ID Number: EPA–HQ–
OECA–2014–0057; Title: NESHAP for
Wood Furniture Manufacturing
Operations (40 CFR part 63, subpart JJ);
EPA ICR Number 1716.10; OMB Control
Number 2060–0324; Expiration Date:
November 30, 2018.
Respondents: Wood furniture
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart JJ).
Estimated number of respondents:
856 (total).
Frequency of response: Initially,
occasionally, quarterly and
semiannually.
Annual estimated burden: 66,200
hours.
Annual estimated cost: $6,510,000,
includes $24,600 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(36) Docket ID Number: EPA–HQ–
OECA–2014–0068; Title: NESHAP for
Primary Lead Smelters (40 CFR part 63,
subpart TTT); EPA ICR Number
1856.11; OMB Control Number 2060–
0414; Expiration Date: November 30,
2018.
Respondents: Primary lead smelters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
TTT).
Estimated number of respondents: 1
(total).
Frequency of response: Quarterly and
semiannually.
Annual estimated burden: 6,270
hours.
Annual estimated cost: $782,000,
includes $169,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(37) Docket ID Number: EPA–HQ–
OECA–2014–0091; Title: NESHAP for
Engine Test Cells/Stands (40 CFR part
63, subpart PPPPP); EPA ICR Number
2066.07; OMB Control Number 2060–
0483; Expiration Date: November 30,
2018.
Respondents: Internal combustion
engine test cells/stands at major source
facilities.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
PPPPP).
Estimated number of respondents: 18
(total).
Frequency of response: Semiannually.
Annual estimated burden: 1,720
hours.
Annual estimated cost: $173,000,
includes $5,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(38) Docket ID Number: EPA–HQ–
OECA–2014–0078; Title: NESHAP for
Metal Coil Surface Coating Plants (40
CFR part 63, subpart SSSS); EPA ICR
Number 1957.08; OMB Control Number
2060–0487; Expiration Date: November
30, 2018.
Respondents: Metal coil surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
SSSS).
Estimated number of respondents: 89
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 25,100
hours.
Annual estimated cost: $2,550,000,
includes $91,200 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(39) Docket ID Number: EPA–HQ–
OECA–2013–0352; Title: NESHAP for
Industrial, Commercial, and
Institutional Boilers and Process Heaters
(40 CFR part 63, subpart DDDDD); EPA
ICR Number 2028.09; OMB Control
Number 2060–0551; Expiration Date:
November 30, 2018.
Respondents: Industrial, commercial
and institutional boilers and process
heaters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
DDDDD).
Estimated number of respondents:
1,700 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 493,000
hours.
Annual estimated cost: $155,000,000,
includes $108,000,000 annualized
capital or O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(40) Docket ID Number: EPA–HQ–
OECA–2011–0256; Title: Emission
Guidelines for Existing Other Solid
Waste Incineration Units (40 CFR part
60, subpart FFFF); EPA ICR Number
2164.06; OMB Control Number 2060–
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
0562; Expiration Date: November 30,
2018.
Respondents: Other solid waste
incineration units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
FFFF).
Estimated number of respondents: 99
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 70,200
hours.
Annual estimated cost: $7,560,000,
includes $495,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(41) Docket ID Number: EPA–HQ–
OECA–2014–0094; Title: NSPS for
Other Solid Waste Incineration Units
(40 CFR part 60, subpart EEEE); EPA
ICR Number 2163.06; OMB Control
Number 2060–0563; Expiration Date:
November 30, 2018.
Respondents: Other solid waste
incineration units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
EEEE).
Estimated number of respondents: 0
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 0 hours.
Annual estimated cost: $0, includes
no annualized capital or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(42) Docket ID Number: EPA–HQ–
OECA–2014–0096; Title: NESHAP for
Iron and Steel Foundries (40 CFR part
63, subpart ZZZZZ); EPA ICR Number
2267.05; OMB Control Number 2060–
0605; Expiration Date: November 30,
2018.
Respondents: Area source iron and
steel foundries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
ZZZZZ).
Estimated number of respondents:
427 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 7,890
hours.
Annual estimated cost: $773,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(43) Docket ID Number: EPA–HQ–
OECA–2014–0097; Title: NESHAP for
Plating and Polishing Area Sources (40
CFR part 63, subpart WWWWWW); EPA
ICR Number 2294.05; OMB Control
Number 2060–0623; Expiration Date:
November 30, 2018.
PO 00000
Frm 00084
Fmt 4703
Sfmt 4703
29557
Respondents: Area source plating and
polishing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
WWWWWW).
Estimated number of respondents:
2,900 (total).
Frequency of response: Initially and
annually.
Annual estimated burden: 64,300
hours.
Annual estimated cost: $6,300,000,
includes $8,310 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(44) Docket ID Number: EPA–HQ–
OECA–2014–0030; Title: NSPS for
Metallic Mineral Processing Plants (40
CFR part 60, subpart LL); EPA ICR
Number 0982.12; OMB Control Number
2060–0016; Expiration Date: December
31, 2018.
Respondents: Metallic mineral
processing plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart LL).
Estimated number of respondents: 20
(total).
Frequency of response: Initially and
semiannually.
Annual estimated burden: 2,300
hours.
Annual estimated cost: $239,000,
includes $13,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(45) Docket ID Number: EPA–HQ–
OECA–2014–0034; Title: NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB);
EPA ICR Number 1055.12; OMB Control
Number 2060–0021; Expiration Date:
December 31, 2018.
Respondents: Kraft pulp mills.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart BB).
Estimated number of respondents:
110 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 16,700
hours.
Annual estimated cost: $6,010,000,
includes $4,330,000 annualized capital
or O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(46) Docket ID Number: EPA–HQ–
OECA–2014–0045; Title: NSPS for
Municipal Waste Combustors (40 CFR
part 60, subparts Ea and Eb); EPA ICR
Number 1506.14; OMB Control Number
2060–0210; Expiration Date: December
31, 2018.
Respondents: Municipal waste
combustors.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
29558
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts Ea
and Eb).
Estimated number of respondents: 13
(total).
Frequency of response: Initially,
occasionally, quarterly and
semiannually.
Annual estimated burden: 20,300
hours.
Annual estimated cost: $1,880,000,
includes $117,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(47) Docket ID Number: EPA–HQ–
OECA–2014–0062; Title: NESHAP for
Pesticide Active Ingredient Production
(40 CFR part 63, subpart MMM); EPA
ICR Number 1807.09; OMB Control
Number 2060–0370; Expiration Date:
December 31, 2018.
Respondents: Pesticide active
ingredient production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
MMM).
Estimated number of respondents: 18
(total).
Frequency of response: Initially,
quarterly and semiannually.
Annual estimated burden: 12,000
hours.
Annual estimated cost: $1,420,000,
includes $236,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(48) Docket ID Number: EPA–HQ–
OECA–2014–0066; Title: NESHAP for
Ferroalloys Production: Ferromanganese
and Silicomanganese (40 CFR part 63,
subpart XXX); EPA ICR Number
1831.07; OMB Control Number 2060–
0391; Expiration Date: December 31,
2018.
Respondents: Ferroalloy production
facilities that manufacture
ferromanganese and silicomanganese.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
XXX).
Estimated number of respondents: 1
(total).
Frequency of response: Initially,
quarterly, semiannually and annually.
Annual estimated burden: 600 hours.
Annual estimated cost: $57,200,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(49) Docket ID Number: EPA–HQ–
OECA–2014–0083; Title: NESHAP for
Leather Finishing Operations (40 CFR
part 63, subpart TTTT); EPA ICR
Number 1985.07; OMB Control Number
2060–0478; Expiration Date: December
31, 2018.
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
Respondents: Leather finishing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
TTTT).
Estimated number of respondents: 10
(total).
Frequency of response: Initially,
occasionally and annually.
Annual estimated burden: 334 hours.
Annual estimated cost: $32,700,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(50) Docket ID Number: EPA–HQ–
OECA–2014–0082; Title: NESHAP for
Carbon Black, Ethylene, Cyanide, and
Spandex (40 CFR part 63, subpart YY);
EPA ICR Number 1983.08; OMB Control
Number 2060–0489; Expiration Date:
December 31, 2018.
Respondents: Carbon black
production, ethylene production,
cyanide manufacturing, and spandex
production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
YY).
Estimated number of respondents: 61
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 41,800
hours.
Annual estimated cost: $4,550,000,
includes $351,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(51) Docket ID Number: EPA–HQ–
OECA–2014–0079; Title: NESHAP for
Wet-Formed Fiberglass Mat Production
(40 CFR part 63, subpart HHHH); EPA
ICR Number 1964.07; OMB Control
Number 2060–0496; Expiration Date:
December 31, 2018.
Respondents: Wet-formed fiberglass
mat production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
HHHH).
Estimated number of respondents: 14
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 2,800
hours.
Annual estimated cost: $285,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(52) Docket ID Number: EPA–HQ–
OECA–2014–0093; Title: NESHAP for
Coal- and Oil-fired Electric Utility
Steam Generating Units (40 CFR part 63,
subpart UUUUU); EPA ICR Number
2137.08; OMB Control Number 2060–
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
0567; Expiration Date: December 31,
2018.
Respondents: Electric utility steam
generating units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
UUUUU).
Estimated number of respondents:
1,254 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 670,000
hours.
Annual estimated cost: $67,300,000,
includes $1,690,000 annualized capital
or O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(53) Docket ID Number: EPA–HQ–
OECA–2013–0354; Title: NESHAP for
Paint Stripping and Miscellaneous
Surface Coating at Area Sources (40 CFR
part 63, subpart HHHHHH); EPA ICR
Number 2268.05; OMB Control Number
2060–0607; Expiration Date: December
31, 2018.
Respondents: Area source facilities
that use methylene chloride paint
strippers.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
HHHHHH).
Estimated number of respondents:
39,812 (total).
Frequency of response: Initially and
annually.
Annual estimated burden: 125,000
hours.
Annual estimated cost: $1,180,000,
includes $117,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(54) Docket ID Number: EPA–HQ–
OECA–2014–0095; Title: NESHAP for
Gasoline Distribution Bulk Terminals,
Bulk Plants, Pipeline Facilities and
Gasoline Dispensing Facilities (40 CFR
part 63, subparts BBBBBB and
CCCCCC); EPA ICR Number 2237.05;
OMB Control Number 2060–0620;
Expiration Date: December 31, 2018.
Respondents: Area source gasoline
distribution facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subparts
BBBBBB and CCCCCC).
Estimated number of respondents:
19,120 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 175,000
hours.
Annual estimated cost: $17,300,000,
includes $110,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
(55) Docket ID Number: EPA–HQ–
OECA–2013–0312; Title: Emission
Guidelines for Commercial and
Industrial Solid Waste Incineration
Units (40 CFR part 60, subpart DDDD);
EPA ICR Number 2385.07; OMB Control
Number 2060–0664; Expiration Date:
December 31, 2018.
Respondents: Commercial and
industrial solid waste incineration
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
DDDD).
Estimated number of respondents: 57
(total).
Frequency of response: Initially,
occasionally, semiannually and
annually.
Annual estimated burden: 7,380
hours.
Annual estimated cost: $8,690,000,
includes $8,270,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(56) Docket ID Number: EPA–HQ–
OECA–2014–0044; Title: NESHAP for
Coke Oven Batteries (40 CFR part 63,
subpart L); EPA ICR Number 1362.11;
OMB Control Number 2060–0253;
Expiration Date: January 31, 2019.
Respondents: Coke oven batteries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart L).
Estimated number of respondents: 19
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 80,000
hours.
Annual estimated cost: $8,020,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(57) Docket ID Number: EPA–HQ–
OECA–2012–0668; Title: NESHAP for
Flexible Polyurethane Foam Product (40
CFR part 63, subpart III); EPA ICR
Number 1783.09; OMB Control Number
2060–0357; Expiration Date: January 31,
2019.
Respondents: Flexible polyurethane
foam product manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart III).
Estimated number of respondents: 12
(total).
Frequency of response: Initially,
semiannually and annually.
Annual estimated burden: 882 hours.
Annual estimated cost: $46,800,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(58) Docket ID Number: EPA–HQ–
OECA–2014–0064; Title: NESHAP for
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
Steel Pickling, HCl Process Facilities
and Hydrochloric Acid Regeneration
Plants (40 CFR part 63, subpart CCC);
EPA ICR Number 1821.09; OMB Control
Number 2060–0419; Expiration Date:
January 31, 2019.
Respondents: Facilities that pickle
steel using HCl or regenerate HCl.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
CCC).
Estimated number of respondents:
100 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 35,100
hours.
Annual estimated cost: $3,540,000,
includes $10,600 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(59) Docket ID Number: EPA–HQ–
OECA–2012–0532; Title: NSPS for
Beverage Can Surface Coating (40 CFR
part 60, subpart WW); EPA ICR Number
0663.13; OMB Control Number 2060–
0001; Expiration Date: March 31, 2019.
Respondents: Beverage can surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
WW).
Estimated number of respondents: 48
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 5,190
hours.
Annual estimated cost: $623,000,
includes $101,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(60) Docket ID Number: EPA–HQ–
OECA–2014–0039; Title: NSPS for
Nonmetallic Mineral Processing (40 CFR
part 60, subpart OOO); EPA ICR Number
1084.14; OMB Control Number 2060–
0050; Expiration Date: March 31, 2019.
Respondents: Fixed and portable
nonmetallic mineral processing plants.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
OOO).
Estimated number of respondents:
4,896 (total).
Frequency of response: Initially and
occasionally.
Annual estimated burden: 14,100
hours.
Annual estimated cost: $1,650,000,
includes $228,000 annualized capital or
O&M costs.
Changes in Estimates: There is a
projected increase in burden due to an
increase in the number of sources
subject to the regulation.
(61) Docket ID Number: EPA–HQ–
OECA–2014–0031; Title: NSPS for
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
29559
Petroleum Dry Cleaners (40 CFR part 60,
subpart JJJ); EPA ICR Number 0997.12;
OMB Control Number 2060–0079;
Expiration Date: March 31, 2019.
Respondents: Petroleum dry cleaning
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart JJJ).
Estimated number of respondents: 20
(total).
Frequency of response: Initially.
Annual estimated burden: 1,850
hours.
Annual estimated cost: $186,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(62) Docket ID Number: EPA–HQ–
OECA–2012–0529; Title: NESHAP for
Mercury (40 CFR part 61, subpart E);
EPA ICR Number 0113.13; OMB Control
Number 2060–0097; Expiration Date:
March 31, 2019.
Respondents: Facilities that process
mercury ore to recover mercury, use
mercury chlor-alkali cells to produce
chlorine gas and alkali metal hydroxide,
and incinerate or dry wastewater
treatment plant sludge.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart E).
Estimated number of respondents:
107 (total).
Frequency of response: Initially,
occasionally, semiannually and
annually.
Annual estimated burden: 20,600
hours.
Annual estimated cost: $2,070,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(63) Docket ID Number: EPA–HQ–
OECA–2014–0025; Title: NESHAP for
Asbestos (40 CFR part 61, subpart M);
EPA ICR Number 0111.15; OMB Control
Number 2060–0101; Expiration Date:
March 31, 2019.
Respondents: Demolition and
renovation facilities; asbestos waste
disposal; asbestos milling,
manufacturing, and fabricating facilities;
use of asbestos on roadways; asbestos
waste converting facilities; and use of
asbestos insulation and sprayed-on
materials.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart M).
Estimated number of respondents:
9,575 (total).
Frequency of response: Initially,
occasionally, quarterly and
semiannually.
Annual estimated burden: 292,000
hours.
Annual estimated cost: $29,400,000,
includes no annualized capital or O&M
costs.
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
29560
Federal Register / Vol. 82, No. 124 / Thursday, June 29, 2017 / Notices
Changes in Estimates: There is a
projected increase in burden due to a
net increase in the number of sources
subject to the regulation.
(64) Docket ID Number: EPA–HQ–
OECA–2012–0530; Title: NSPS for
Metal Furniture Coating (40 CFR part
60, subpart EE); EPA ICR Number
0649.13; OMB Control Number 2060–
0106; Expiration Date: March 31, 2019.
Respondents: Metal furniture surface
coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart EE).
Estimated number of respondents:
400 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 56,500
hours.
Annual estimated cost: $6,530,000,
includes $840,000 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(65) Docket ID Number: EPA–HQ–
OECA–2012–0531; Title: NSPS for
Surface Coating of Large Appliances (40
CFR part 60, subpart SS); EPA ICR
Number 0659.14; OMB Control Number
2060–0108; Expiration Date: March 31,
2019.
Respondents: Large appliance coating
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart SS).
Estimated number of respondents: 72
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 7,740
hours.
Annual estimated cost: $787,000,
includes $8,400 annualized capital or
O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(66) Docket ID Number: EPA–HQ–
OECA–2013–0331; Title: NSPS for New
Residential Wood Heaters (40 CFR part
60, subpart AAA); EPA ICR Number
1176.13; OMB Control Number 2060–
0161; Expiration Date: March 31, 2019.
Respondents: Residential wood
heaters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
AAA).
Estimated number of respondents: 66
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 8,840
hours.
Annual estimated cost: $1,720,000,
includes $1,470,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
VerDate Sep<11>2014
18:29 Jun 28, 2017
Jkt 241001
(67) Docket ID Number: EPA–HQ–
OECA–2014–0046; Title: NESHAP for
Benzene Waste Operations (40 CFR part
61, subpart FF); EPA ICR Number
1541.12; OMB Control Number 2060–
0183; Expiration Date: March 31, 2019.
Respondents: Facilities that generate
waste containing benzene, and
hazardous waste treatment, storage, and
disposal facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart FF).
Estimated number of respondents:
270 (total).
Frequency of response: Initially,
quarterly and annually.
Annual estimated burden: 19,200
hours.
Annual estimated cost: $1,930,000,
includes no annualized capital or O&M
costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(68) Docket ID Number: EPA–HQ–
OECA–2009–0422; Title: NESHAP for
Chromium Emissions from Hard and
Decorative Chromium Electroplating
and Chromium Anodizing Tanks (40
CFR part 63, subpart N); EPA ICR
Number 1611.12; OMB Control Number
2060–0327; Expiration Date: March 31,
2019.
Respondents: Hard chromium
electroplating, decorative chromium
electroplating, and chromium anodizing
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart N).
Estimated number of respondents:
1,343 (total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 242,000
hours.
Annual estimated cost: $29,700,000,
includes $20,400,000 annualized capital
or O&M costs.
Changes in Estimates: There is no
change in burden from the previous ICR.
(69) Docket ID Number: EPA–HQ–
OECA–2017–0200; Title: NESHAP for
Rubber Tire Manufacturing (40 CFR part
63, subpart XXXX); EPA ICR Number
1982.01; OMB Control Number 2060–
NEW.
Respondents: Major source rubber tire
manufacturing facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
XXXX).
Estimated number of respondents: 36
(total).
Frequency of response: Initially,
occasionally and semiannually.
Annual estimated burden: 12,807
hours.
Annual estimated cost: $2,058,337,
includes $1,357,000 annualized capital
or O&M costs.
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
(70) Docket ID Number: EPA–HQ–
OECA–2017–0201; Title: NESHAP for
Inorganic Arsenic Emissions from
Primary Copper Smelters (40 CFR part
61, subpart O); EPA ICR Number
1089.04; OMB Control Number 2060–
NEW.
Respondents: Copper converter at
primary copper smelters.
Respondent’s obligation to respond:
Mandatory (40 CFR part 61, subpart O).
Estimated number of respondents: 59
(total).
Frequency of response: Initially,
quarterly and annually.
Annual estimated burden: 3,167
hours.
Annual estimated cost: $297,703,
includes $2,000 annualized capital or
O&M costs.
Dated: April 27, 2017.
Edward J. Messina,
Director, Monitoring, Assistance and Media
Programs Division.
[FR Doc. 2017–13669 Filed 6–28–17; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9963–77–OARM]
Meeting of Good Neighbor
Environmental Board
Environmental Protection
Agency (EPA).
ACTION: Notice of Federal Advisory
Committee teleconference meetings.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, notice is hereby given that the
Good Neighbor Environmental Board
will hold public teleconference
meetings on Tuesday, July 11, 2017 and
Thursday, September 7, 2017. The
meetings are open to the public.
DATES: The Good Neighbor
Environmental Board will hold open
teleconference meetings on Tuesday,
July 11, 2017 from 12:00–4:00 p.m. EDT
and on Thursday, September 7, 2017
from 12:00–4:00 p.m. EDT.
SUPPLEMENTARY INFORMATION:
Purpose of Meeting: The purpose of
these meetings is to discuss the Board’s
next report, which is examining
environmental protection and security
issues in the U.S.-Mexico border region.
General Information: The agendas for
the teleconferences will be available at
https://www2.epa.gov/faca/gneb. General
information about the Board can be
found on its Web site at https://
www2.epa.gov/faca/gneb. If you wish to
make oral comments or submit written
comments to the Board, please contact
SUMMARY:
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 82, Number 124 (Thursday, June 29, 2017)]
[Notices]
[Pages 29552-29560]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-13669]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-9962-16-OECA]
See the Item Specific Docket Numbers Provided in the Text:
Proposed Information Collection Request; Comment Request; See Item
Specific ICR Titles Provided in the Text
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency is planning to submit the
below listed information collection requests (ICRs) (See item specific
ICR title, EPA ICR Number and OMB Control Number provided in the text)
to the Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act. Before doing so, EPA is
soliciting public comments on specific aspects of the proposed
information collection as described below. These are proposed extension
of 70 currently approved ICRs, and request for approval of two new
collections. An Agency may not conduct or sponsor and a person is not
required to respond to a collection of information unless it displays a
currently valid OMB control number.
DATES: Comments must be submitted on or before August 28, 2017.
ADDRESSES: Submit your comments, referencing the Docket ID numbers
provided for each item in the text, online using www.regulations.gov
(our preferred method), by email to docket.oeca@epa.gov, or by mail to:
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW., Washington, DC 20460.
EPA's policy is that all comments received will be included in the
public docket without change including any personal information
provided, unless the comment includes profanity, threats, information
claimed to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, Mail
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave.
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax
number: (202) 564-0050; email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at
www.regulations.gov or in person at the EPA Docket Center, WJC West,
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone
number for the Docket Center is 202-566-1744. For additional
information about EPA's public docket, visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting
comments and information to enable it to: (i) Evaluate whether the
proposed collection of information is necessary for the proper
performance of the functions of the Agency, including whether the
information will have practical utility; (ii) evaluate the accuracy of
the Agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (iii) enhance the quality, utility, and clarity of the
information to be collected; and (iv) minimize the burden of the
collection of information on those who are to respond, including
through the use of appropriate automated electronic, mechanical, or
other technological collection techniques or other forms of information
technology, e.g., permitting electronic submission of responses. Burden
is defined at 5 CFR 1320.03(b). EPA will consider the comments received
and amend the ICR as appropriate. The final ICR package will then be
submitted to OMB for review and approval. At that time, EPA will issue
another Federal Register notice to announce the submission of the ICR
to OMB and the opportunity to submit additional comments to OMB.
General Abstract: For all the listed ICRs in this notice, owners
and operators of affected facilities are required to comply with
reporting and record keeping requirements for the general provisions of
40 CFR part 60, subpart A or Part 63, Subpart A, as well as the
applicable specific standards. This includes submitting initial
notifications, performance tests and periodic reports and results, and
maintaining records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility, or
any period during which the monitoring system is
[[Page 29553]]
inoperative. These reports are used by EPA to determine compliance with
the standards.
(1) Docket ID Number: EPA-HQ-OECA-2013-0019; Title: NSPS for
Electric Utility Steam Generating Units (40 CFR part 60, subpart Da);
EPA ICR Number 1053.12; OMB Control Number 2060-0023; Expiration Date:
December 31, 2017.
Respondents: Electric utility steam generating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart Da).
Estimated number of respondents: 699 (total).
Frequency of response: Initially and semiannually.
Estimated annual burden: 168,000 hours.
Estimated annual cost: $29,200,000, includes $12,700,000 annualized
capital or operation & maintenance (O&M) costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(2) Docket ID Number: EPA-HQ-OECA-2013-0332; Title: NSPS for Small
Industrial-Commercial-Institutional Steam Generating Units (40 CFR part
60, subpart Dc); EPA ICR Number 1564.10; OMB Control Number 2060-0202;
Expiration Date: December 31, 2017.
Respondents: Industrial-commercial-institutional steam generating
units with maximum design heat input capacity of 29 megawatts (MW) or
less, but greater than or equal to 2.9 MW.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Dc).
Estimated number of respondents: 268 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 182,000 hours.
Annual estimated cost: $28,600,000, includes $10,800,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(3) Docket ID Number: EPA-HQ-OECA-2013-0326; Title: NSPS for
Asphalt Processing and Roofing Manufacturing (40 CFR part 60, subpart
UU); EPA ICR Number 0661.12; OMB Control Number 2060-0002; Expiration
Date: April 30, 2018.
Respondents: Asphalt processing and roofing manufacture plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart UU).
Estimated number of respondents: 144 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 33,900 hours.
Annual estimated cost: $8,560,000, includes $5,240,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to reconstruction of existing sources.
(4) Docket ID Number: EPA-HQ-OECA-2014-0028; Title: NSPS for
Calciners and Dryers in Mineral Industries (40 CFR part 60, subpart
UUU); EPA ICR Number 0746.10; OMB Control Number 2060-0251; Expiration
Date: April 30, 2018.
Respondents: Calciners and dryers at mineral facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart UUU).
Estimated number of respondents: 167 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 6,440 hours.
Annual estimated cost: $739,000, includes $109,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(5) Docket ID Number: EPA-HQ-OECA-2013-0324; Title: NESHAP for
Marine Tank Vessel Loading Operations (40 CFR part 63, subpart Y); EPA
ICR Number 1679.10; OMB Control Number 2060-0289; Expiration Date:
April 30, 2018.
Respondents: Marine tank vessel loading plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart Y).
Estimated number of respondents: 804 (total).
Frequency of response: Initially and annually.
Annual estimated burden: 9,890 hours.
Annual estimated cost: $968,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(6) Docket ID Number: EPA-HQ-OECA-2013-0347; Title: NESHAP for
Epoxy Resin and Non-Nylon Polyamide Production (40 CFR part 63, subpart
W); EPA ICR Number 1681.09; OMB Control Number 2060-0290; Expiration
Date: April 30, 2018.
Respondents: Epoxy resin and non-nylon polyamide plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart W).
Estimated number of respondents: 7 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 3,960 hours.
Annual estimated cost: $390,000, includes $9,000 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(7) Docket ID Number: EPA-HQ-OECA-2014-0056; Title: NESHAP for
Shipbuilding and Ship Repair Facilities--Surface Coating (40 CFR part
63, subpart II); EPA ICR Number 1712.10; OMB Control Number 2060-0330;
Expiration Date: April 30, 2018.
Respondents: Shipbuilding and repair facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart II).
Estimated number of respondents: 56 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 28,600 hours.
Annual estimated cost: $2,800,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(8) Docket ID Number: EPA-HQ-OECA-2013-0351; Title: NESHAP for
Solvent Extraction for Vegetable Oil Production (40 CFR part 63,
subpart GGGG); EPA ICR Number 1947.07; OMB Control Number 2060-0471;
Expiration Date: April 30, 2018.
Respondents: Vegetable oil production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GGGG).
Estimated number of respondents: 89 (total).
Frequency of response: Initially and annually.
Annual estimated burden: 34,700 hours.
Annual estimated cost: $3,340,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to reconstruction of existing sources.
(9) Docket ID Number: EPA-HQ-OECA-2014-0080; Title: NESHAP for
Cellulose Products Manufacturing (40 CFR part 63, subpart UUUU); EPA
ICR Number 1974.08; OMB Control Number 2060-0488; Expiration Date:
April 30, 2018.
Respondents: Cellulose products manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart UUUU).
Estimated number of respondents: 13 (total).
Frequency of response: Initially and semiannually.
[[Page 29554]]
Annual estimated burden: 12,100 hours.
Annual estimated cost: $1,180,000, includes $1,010 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(10) Docket ID Number: EPA-HQ-OECA-2014-0041; Title: NSPS for Glass
Manufacturing Plants (40 CFR part 60, subpart CC); EPA ICR Number
1131.11; OMB Control Number 2060-0054; Expiration Date: May 31, 2018.
Respondents: Glass manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart CC).
Estimated number of respondents: 41 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 803 hours.
Annual estimated cost: $315,000, includes $238,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(11) Docket ID Number: EPA-HQ-OECA-2013-0349; Title: NESHAP for
Pharmaceutical Production (40 CFR part 63, subpart GGG); EPA ICR Number
1781.08; OMB Control Number 2060-0358; Expiration Date: May 31, 2018.
Respondents: Pharmaceutical production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GGG).
Estimated number of respondents: 27 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 44,300 hours.
Annual estimated cost: $4,440,000, includes $112,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(12) Docket ID Number: EPA-HQ-OECA-2013-0322; Title: NESHAP for
Beryllium Rocket Motor Fuel Firing (40 CFR part 61, subpart D); EPA ICR
Number 1125.08; OMB Control Number 2060-0394; Expiration Date: May 31,
2018.
Respondents: Beryllium rocket static test firing or beryllium
propellant disposal facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart D).
Estimated number of respondents: 1 (total).
Frequency of response: Initially and occasionally.
Annual estimated burden: 9 hours.
Annual estimated cost: $930, includes no annualized capital or O&M
costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(13) Docket ID Number: EPA-HQ-OECA-2013-0356; Title: NESHAP for
Group I Polymers and Resins (40 CFR part 63, subpart U); EPA ICR Number
2410.04; OMB Control Number 2060-0665; Expiration Date: May 31, 2018.
Respondents: Facilities with elastomer product process units and
associated equipment.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart U).
Estimated number of respondents: 5 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 315 hours.
Annual estimated cost: $16,800, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(14) Docket ID Number: EPA-HQ-OECA-2013-0348; Title: NESHAP for
Primary Aluminum Reduction Plants (40 CFR part 63, subpart LL); EPA ICR
Number 1767.08; OMB Control Number 2060-0360; Expiration Date: June 30,
2018.
Respondents: Primary aluminum reduction plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart LL).
Estimated number of respondents: 16 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 80,400 hours.
Annual estimated cost: $7,600,000, includes $91,400 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(15) Docket ID Number: EPA-HQ-OECA-2013-0323; Title: NESHAP for
Area Sources: Electric Arc Furnace Steelmaking Facilities (40 CFR part
63, subpart YYYYY); EPA ICR Number 2277.05; OMB Control Number 2060-
0608; Expiration Date: June 30, 2018.
Respondents: Area source electric arc furnace steelmaking
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YYYYY).
Estimated number of respondents: 87 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 1,420 hours.
Annual estimated cost: $136,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(16) Docket ID Number: EPA-HQ-OECA-2014-0027; Title: NSPS for Bulk
Gasoline Terminals (40 CFR part 60, subpart XX); EPA ICR Number
0664.12; OMB Control Number 2060-0006; Expiration Date: August 31,
2018.
Respondents: Bulk gasoline terminals.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart XX).
Estimated number of respondents: 40 (total).
Frequency of response: Initially and occasionally.
Annual estimated burden: 13,200 hours.
Annual estimated cost: $1,290,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(17) Docket ID Number: EPA-HQ-OECA-2013-0327; Title: NSPS for
Portland Cement Plants (40 CFR part 60, subpart F); EPA ICR Number
1051.14; OMB Control Number 2060-0025; Expiration Date: August 31,
2018.
Respondents: Portland cement plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart F).
Estimated number of respondents: 96 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 14,500 hours.
Annual estimated cost: $2,190,000, includes $774,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(18) Docket ID Number: EPA-HQ-OECA-2014-0043; Title: NSPS for
Polymeric Coating of Supporting Substrates Facilities (40 CFR part 60,
subpart VVV); EPA ICR Number 1284.11; OMB Control Number 2060-0181;
Expiration Date: August 31, 2018.
Respondents: Polymeric coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart VVV).
Estimated number of respondents: 58 (total).
Frequency of response: Initially, quarterly and semiannually.
Annual estimated burden: 13,700 hours.
Annual estimated cost: $2,000,000, includes $658,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(19) Docket ID Number: EPA-HQ-OECA-2014-0059; Title: NESHAP for
Natural Gas Transmission and Storage (40 CFR part 63, subpart HHH); EPA
ICR Number 1789.10; OMB Control Number 2060-0418; Expiration Date:
August 31, 2018.
[[Page 29555]]
Respondents: Facilities that transport or store natural gas prior
to entering the pipeline.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart HHH).
Estimated number of respondents: 37 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 2,000 hours.
Annual estimated cost: $205,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(20) Docket ID Number: EPA-HQ-OECA-2014-0085; Title: NESHAP for
Friction Materials Manufacturing (40 CFR part 63, subpart QQQQQ); EPA
ICR Number 2025.07; OMB Control Number 2060-0481; Expiration Date:
August 31, 2018.
Respondents: Friction materials manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart QQQQQ).
Estimated number of respondents: 4 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 1,290 hours.
Annual estimated cost: $127,000, includes $1,090 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(21) Docket ID Number: EPA-HQ-OECA-2014-0099; Title: NESHAP for
Ferroalloys Production Area Sources (40 CFR part 63, subpart YYYYYY);
EPA ICR Number 2303.05; OMB Control Number 2060-0625; Expiration Date:
August 31, 2018.
Respondents: Ferroalloys production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YYYYYY).
Estimated number of respondents: 10 (total).
Frequency of response: Initially and annually.
Annual estimated burden: 345 hours.
Annual estimated cost: $33,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(22) Docket ID Number: EPA-HQ-OECA-2013-0311; Title: Emission
Guidelines for Sewage Sludge Incinerators (40 CFR part 60, subpart
MMMM); EPA ICR Number 2403.04; OMB Control Number 2060-0661; Expiration
Date: August 31, 2018.
Respondents: Sewage sludge incinerators constructed on or before
October 14, 2010.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart MMMM).
Estimated number of respondents: 110 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 29,100 hours.
Annual estimated cost: $7,580,000, includes $4,730,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(23) Docket ID Number: EPA-HQ-OECA-2014-0035; Title: NSPS for
Sulfuric Acid Plants (40 CFR part 60, subpart H); EPA ICR Number
1057.14; OMB Control Number 2060-0041; Expiration Date: September 30,
2018.
Respondents: Sulfuric acid plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart H).
Estimated number of respondents: 53 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 13,400 hours.
Annual estimated cost: $1,550,000, includes $239,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(24) Docket ID Number: EPA-HQ-OECA-2014-0061; Title: NESHAP for
Chemical Recovery Combustion Sources at Kraft, Soda, Sulfite and Stand-
Alone Semichemical Pulp Mills (40 CFR part 63, subpart MM); EPA ICR
Number 1805.08; OMB Control Number 2060-0377; Expiration Date: October
31, 2018.
Respondents: Kraft, soda, sulfite, and stand-alone semichemical
pulp mills.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart MM).
Estimated number of respondents: 111 (total).
Frequency of response: Initially, quarterly and semiannually.
Annual estimated burden: 124,000 hours.
Annual estimated cost: $13,000,000, includes $712,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(25) Docket ID Number: EPA-HQ-OECA-2014-0067; Title: NESHAP for
Primary Copper Smelters (40 CFR part 63, subpart QQQ); EPA ICR Number
1850.08; OMB Control Number 2060-0476; Expiration Date: October 31,
2018.
Respondents: Primary copper smelters.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart QQQ).
Estimated number of respondents: 3 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 9,380 hours.
Annual estimated cost: $927,000, includes $8,220 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(26) Docket ID Number: EPA-HQ-OECA-2014-0033; Title: NSPS for
Petroleum Refineries (40 CFR part 60, subpart J); EPA ICR Number
1054.13; OMB Control Number 2060-0022; Expiration Date: November 30,
2018.
Respondents: Fluid catalytic cracking unit catalyst regenerator or
fuel gas combustion device at petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart J).
Estimated number of respondents: 150 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 15,800 hours.
Annual estimated cost: $2,260,000, includes $719,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(27) Docket ID Number: EPA-HQ-OECA-2014-0037; Title: NSPS for
Primary and Secondary Emissions from Basic Oxygen Furnaces (40 CFR part
60, subparts N and Na); EPA ICR Number 1069.12; OMB Control Number
2060-0029; Expiration Date: November 30, 2018.
Respondents: Basic oxygen process furnace at iron and steel plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts N and Na).
Estimated number of respondents: 18 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 6,260 hours.
Annual estimated cost: $643,000, includes $29,700 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(28) Docket ID Number: EPA-HQ-OECA-2014-0038; Title: NESHAP for
Inorganic Arsenic Emissions from Glass Manufacturing Plants (40 CFR
part 61, subpart N); EPA ICR Number 1081.12; OMB Control Number 2060-
0043; Expiration Date: November 30, 2018.
[[Page 29556]]
Respondents: Glass manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart N).
Estimated number of respondents: 16 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 3,080 hours.
Annual estimated cost: $366,000, includes $56,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(29) Docket ID Number: EPA-HQ-OECA-2014-0042; Title: NSPS for Lime
Manufacturing (40 CFR part 60, subpart HH); EPA ICR Number 1167.12; OMB
Control Number 2060-0063; Expiration Date: November 30, 2018.
Respondents: Lime manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart HH).
Estimated number of respondents: 41 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 3,770 hours.
Annual estimated cost: $441,000, includes $61,500 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(30) Docket ID Number: EPA-HQ-OECA-2013-0328; Title: NESHAP for
Vinyl Chloride (40 CFR part 61, subpart F); EPA ICR Number 0186.14; OMB
Control Number 2060-0071; Expiration Date: November 30, 2018.
Respondents: Ethylene dichloride, vinyl chloride monomer, and
polyvinyl chloride plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart F).
Estimated number of respondents: 18 (total).
Frequency of response: Quarterly and occasionally.
Annual estimated burden: 7,600 hours.
Annual estimated cost: $1,550,000, includes $810,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(31) Docket ID Number: EPA-HQ-OECA-2014-0040; Title: NSPS for Hot
Mix Asphalt Facilities (40 CFR part 60, subpart I); EPA ICR Number
1127.12; OMB Control Number 2060-0083; Expiration Date: November 30,
2018.
Respondents: Hot mix asphalt facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart I).
Estimated number of respondents: 4,535 (total).
Frequency of response: Initially.
Annual estimated burden: 18,800 hours.
Annual estimated cost: $1,890,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(32) Docket ID Number: EPA-HQ-OECA-2014-0026; Title: NSPS for Metal
Coil Surface Coating (40 CFR part 60, subpart TT); EPA ICR Number
0660.13; OMB Control Number 2060-0107; Expiration Date: November 30,
2018.
Respondents: Metal coil surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart TT).
Estimated number of respondents: 158 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 15,600 hours.
Annual estimated cost: $1,860,000, includes $332,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(33) Docket ID Number: EPA-HQ-OECA-2014-0047; Title: NSPS for
Municipal Solid Waste Landfills (40 CFR part 60, subpart WWW); EPA ICR
Number 1557.10; OMB Control Number 2060-0220; Expiration Date: November
30, 2018.
Respondents: Municipal solid waste landfills constructed, modified,
or reconstructed on or after May 30, 1991.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart WWW).
Estimated number of respondents: 195 (total).
Frequency of response: Initially, occasionally and annually.
Annual estimated burden: 111,000 hours.
Annual estimated cost: $11,600,000, includes $700,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(34) Docket ID Number: EPA-HQ-OECA-2014-0055; Title: NESHAP for
Secondary Lead Smelter Industry (40 CFR part 63, subpart X); EPA ICR
Number 1686.11; OMB Control Number 2060-0296; Expiration Date: November
30, 2018.
Respondents: Secondary lead smelters.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart X).
Estimated number of respondents: 14 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 13,000 hours.
Annual estimated cost: $1,650,000, includes $375,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(35) Docket ID Number: EPA-HQ-OECA-2014-0057; Title: NESHAP for
Wood Furniture Manufacturing Operations (40 CFR part 63, subpart JJ);
EPA ICR Number 1716.10; OMB Control Number 2060-0324; Expiration Date:
November 30, 2018.
Respondents: Wood furniture manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJ).
Estimated number of respondents: 856 (total).
Frequency of response: Initially, occasionally, quarterly and
semiannually.
Annual estimated burden: 66,200 hours.
Annual estimated cost: $6,510,000, includes $24,600 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(36) Docket ID Number: EPA-HQ-OECA-2014-0068; Title: NESHAP for
Primary Lead Smelters (40 CFR part 63, subpart TTT); EPA ICR Number
1856.11; OMB Control Number 2060-0414; Expiration Date: November 30,
2018.
Respondents: Primary lead smelters.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart TTT).
Estimated number of respondents: 1 (total).
Frequency of response: Quarterly and semiannually.
Annual estimated burden: 6,270 hours.
Annual estimated cost: $782,000, includes $169,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(37) Docket ID Number: EPA-HQ-OECA-2014-0091; Title: NESHAP for
Engine Test Cells/Stands (40 CFR part 63, subpart PPPPP); EPA ICR
Number 2066.07; OMB Control Number 2060-0483; Expiration Date: November
30, 2018.
Respondents: Internal combustion engine test cells/stands at major
source facilities.
[[Page 29557]]
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart PPPPP).
Estimated number of respondents: 18 (total).
Frequency of response: Semiannually.
Annual estimated burden: 1,720 hours.
Annual estimated cost: $173,000, includes $5,400 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(38) Docket ID Number: EPA-HQ-OECA-2014-0078; Title: NESHAP for
Metal Coil Surface Coating Plants (40 CFR part 63, subpart SSSS); EPA
ICR Number 1957.08; OMB Control Number 2060-0487; Expiration Date:
November 30, 2018.
Respondents: Metal coil surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart SSSS).
Estimated number of respondents: 89 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 25,100 hours.
Annual estimated cost: $2,550,000, includes $91,200 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(39) Docket ID Number: EPA-HQ-OECA-2013-0352; Title: NESHAP for
Industrial, Commercial, and Institutional Boilers and Process Heaters
(40 CFR part 63, subpart DDDDD); EPA ICR Number 2028.09; OMB Control
Number 2060-0551; Expiration Date: November 30, 2018.
Respondents: Industrial, commercial and institutional boilers and
process heaters.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart DDDDD).
Estimated number of respondents: 1,700 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 493,000 hours.
Annual estimated cost: $155,000,000, includes $108,000,000
annualized capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(40) Docket ID Number: EPA-HQ-OECA-2011-0256; Title: Emission
Guidelines for Existing Other Solid Waste Incineration Units (40 CFR
part 60, subpart FFFF); EPA ICR Number 2164.06; OMB Control Number
2060-0562; Expiration Date: November 30, 2018.
Respondents: Other solid waste incineration units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart FFFF).
Estimated number of respondents: 99 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 70,200 hours.
Annual estimated cost: $7,560,000, includes $495,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(41) Docket ID Number: EPA-HQ-OECA-2014-0094; Title: NSPS for Other
Solid Waste Incineration Units (40 CFR part 60, subpart EEEE); EPA ICR
Number 2163.06; OMB Control Number 2060-0563; Expiration Date: November
30, 2018.
Respondents: Other solid waste incineration units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart EEEE).
Estimated number of respondents: 0 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 0 hours.
Annual estimated cost: $0, includes no annualized capital or O&M
costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(42) Docket ID Number: EPA-HQ-OECA-2014-0096; Title: NESHAP for
Iron and Steel Foundries (40 CFR part 63, subpart ZZZZZ); EPA ICR
Number 2267.05; OMB Control Number 2060-0605; Expiration Date: November
30, 2018.
Respondents: Area source iron and steel foundries.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart ZZZZZ).
Estimated number of respondents: 427 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 7,890 hours.
Annual estimated cost: $773,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(43) Docket ID Number: EPA-HQ-OECA-2014-0097; Title: NESHAP for
Plating and Polishing Area Sources (40 CFR part 63, subpart WWWWWW);
EPA ICR Number 2294.05; OMB Control Number 2060-0623; Expiration Date:
November 30, 2018.
Respondents: Area source plating and polishing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart WWWWWW).
Estimated number of respondents: 2,900 (total).
Frequency of response: Initially and annually.
Annual estimated burden: 64,300 hours.
Annual estimated cost: $6,300,000, includes $8,310 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(44) Docket ID Number: EPA-HQ-OECA-2014-0030; Title: NSPS for
Metallic Mineral Processing Plants (40 CFR part 60, subpart LL); EPA
ICR Number 0982.12; OMB Control Number 2060-0016; Expiration Date:
December 31, 2018.
Respondents: Metallic mineral processing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart LL).
Estimated number of respondents: 20 (total).
Frequency of response: Initially and semiannually.
Annual estimated burden: 2,300 hours.
Annual estimated cost: $239,000, includes $13,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(45) Docket ID Number: EPA-HQ-OECA-2014-0034; Title: NSPS for Kraft
Pulp Mills (40 CFR part 60, subpart BB); EPA ICR Number 1055.12; OMB
Control Number 2060-0021; Expiration Date: December 31, 2018.
Respondents: Kraft pulp mills.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart BB).
Estimated number of respondents: 110 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 16,700 hours.
Annual estimated cost: $6,010,000, includes $4,330,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(46) Docket ID Number: EPA-HQ-OECA-2014-0045; Title: NSPS for
Municipal Waste Combustors (40 CFR part 60, subparts Ea and Eb); EPA
ICR Number 1506.14; OMB Control Number 2060-0210; Expiration Date:
December 31, 2018.
Respondents: Municipal waste combustors.
[[Page 29558]]
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts Ea and Eb).
Estimated number of respondents: 13 (total).
Frequency of response: Initially, occasionally, quarterly and
semiannually.
Annual estimated burden: 20,300 hours.
Annual estimated cost: $1,880,000, includes $117,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(47) Docket ID Number: EPA-HQ-OECA-2014-0062; Title: NESHAP for
Pesticide Active Ingredient Production (40 CFR part 63, subpart MMM);
EPA ICR Number 1807.09; OMB Control Number 2060-0370; Expiration Date:
December 31, 2018.
Respondents: Pesticide active ingredient production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart MMM).
Estimated number of respondents: 18 (total).
Frequency of response: Initially, quarterly and semiannually.
Annual estimated burden: 12,000 hours.
Annual estimated cost: $1,420,000, includes $236,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(48) Docket ID Number: EPA-HQ-OECA-2014-0066; Title: NESHAP for
Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR part
63, subpart XXX); EPA ICR Number 1831.07; OMB Control Number 2060-0391;
Expiration Date: December 31, 2018.
Respondents: Ferroalloy production facilities that manufacture
ferromanganese and silicomanganese.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart XXX).
Estimated number of respondents: 1 (total).
Frequency of response: Initially, quarterly, semiannually and
annually.
Annual estimated burden: 600 hours.
Annual estimated cost: $57,200, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(49) Docket ID Number: EPA-HQ-OECA-2014-0083; Title: NESHAP for
Leather Finishing Operations (40 CFR part 63, subpart TTTT); EPA ICR
Number 1985.07; OMB Control Number 2060-0478; Expiration Date: December
31, 2018.
Respondents: Leather finishing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart TTTT).
Estimated number of respondents: 10 (total).
Frequency of response: Initially, occasionally and annually.
Annual estimated burden: 334 hours.
Annual estimated cost: $32,700, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(50) Docket ID Number: EPA-HQ-OECA-2014-0082; Title: NESHAP for
Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR part 63, subpart
YY); EPA ICR Number 1983.08; OMB Control Number 2060-0489; Expiration
Date: December 31, 2018.
Respondents: Carbon black production, ethylene production, cyanide
manufacturing, and spandex production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YY).
Estimated number of respondents: 61 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 41,800 hours.
Annual estimated cost: $4,550,000, includes $351,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(51) Docket ID Number: EPA-HQ-OECA-2014-0079; Title: NESHAP for
Wet-Formed Fiberglass Mat Production (40 CFR part 63, subpart HHHH);
EPA ICR Number 1964.07; OMB Control Number 2060-0496; Expiration Date:
December 31, 2018.
Respondents: Wet-formed fiberglass mat production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart HHHH).
Estimated number of respondents: 14 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 2,800 hours.
Annual estimated cost: $285,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(52) Docket ID Number: EPA-HQ-OECA-2014-0093; Title: NESHAP for
Coal- and Oil-fired Electric Utility Steam Generating Units (40 CFR
part 63, subpart UUUUU); EPA ICR Number 2137.08; OMB Control Number
2060-0567; Expiration Date: December 31, 2018.
Respondents: Electric utility steam generating units.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart UUUUU).
Estimated number of respondents: 1,254 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 670,000 hours.
Annual estimated cost: $67,300,000, includes $1,690,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(53) Docket ID Number: EPA-HQ-OECA-2013-0354; Title: NESHAP for
Paint Stripping and Miscellaneous Surface Coating at Area Sources (40
CFR part 63, subpart HHHHHH); EPA ICR Number 2268.05; OMB Control
Number 2060-0607; Expiration Date: December 31, 2018.
Respondents: Area source facilities that use methylene chloride
paint strippers.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart HHHHHH).
Estimated number of respondents: 39,812 (total).
Frequency of response: Initially and annually.
Annual estimated burden: 125,000 hours.
Annual estimated cost: $1,180,000, includes $117,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(54) Docket ID Number: EPA-HQ-OECA-2014-0095; Title: NESHAP for
Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities
and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and
CCCCCC); EPA ICR Number 2237.05; OMB Control Number 2060-0620;
Expiration Date: December 31, 2018.
Respondents: Area source gasoline distribution facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subparts BBBBBB and CCCCCC).
Estimated number of respondents: 19,120 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 175,000 hours.
Annual estimated cost: $17,300,000, includes $110,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
[[Page 29559]]
(55) Docket ID Number: EPA-HQ-OECA-2013-0312; Title: Emission
Guidelines for Commercial and Industrial Solid Waste Incineration Units
(40 CFR part 60, subpart DDDD); EPA ICR Number 2385.07; OMB Control
Number 2060-0664; Expiration Date: December 31, 2018.
Respondents: Commercial and industrial solid waste incineration
units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart DDDD).
Estimated number of respondents: 57 (total).
Frequency of response: Initially, occasionally, semiannually and
annually.
Annual estimated burden: 7,380 hours.
Annual estimated cost: $8,690,000, includes $8,270,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(56) Docket ID Number: EPA-HQ-OECA-2014-0044; Title: NESHAP for
Coke Oven Batteries (40 CFR part 63, subpart L); EPA ICR Number
1362.11; OMB Control Number 2060-0253; Expiration Date: January 31,
2019.
Respondents: Coke oven batteries.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart L).
Estimated number of respondents: 19 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 80,000 hours.
Annual estimated cost: $8,020,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(57) Docket ID Number: EPA-HQ-OECA-2012-0668; Title: NESHAP for
Flexible Polyurethane Foam Product (40 CFR part 63, subpart III); EPA
ICR Number 1783.09; OMB Control Number 2060-0357; Expiration Date:
January 31, 2019.
Respondents: Flexible polyurethane foam product manufacturing
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart III).
Estimated number of respondents: 12 (total).
Frequency of response: Initially, semiannually and annually.
Annual estimated burden: 882 hours.
Annual estimated cost: $46,800, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(58) Docket ID Number: EPA-HQ-OECA-2014-0064; Title: NESHAP for
Steel Pickling, HCl Process Facilities and Hydrochloric Acid
Regeneration Plants (40 CFR part 63, subpart CCC); EPA ICR Number
1821.09; OMB Control Number 2060-0419; Expiration Date: January 31,
2019.
Respondents: Facilities that pickle steel using HCl or regenerate
HCl.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart CCC).
Estimated number of respondents: 100 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 35,100 hours.
Annual estimated cost: $3,540,000, includes $10,600 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(59) Docket ID Number: EPA-HQ-OECA-2012-0532; Title: NSPS for
Beverage Can Surface Coating (40 CFR part 60, subpart WW); EPA ICR
Number 0663.13; OMB Control Number 2060-0001; Expiration Date: March
31, 2019.
Respondents: Beverage can surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart WW).
Estimated number of respondents: 48 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 5,190 hours.
Annual estimated cost: $623,000, includes $101,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(60) Docket ID Number: EPA-HQ-OECA-2014-0039; Title: NSPS for
Nonmetallic Mineral Processing (40 CFR part 60, subpart OOO); EPA ICR
Number 1084.14; OMB Control Number 2060-0050; Expiration Date: March
31, 2019.
Respondents: Fixed and portable nonmetallic mineral processing
plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart OOO).
Estimated number of respondents: 4,896 (total).
Frequency of response: Initially and occasionally.
Annual estimated burden: 14,100 hours.
Annual estimated cost: $1,650,000, includes $228,000 annualized
capital or O&M costs.
Changes in Estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(61) Docket ID Number: EPA-HQ-OECA-2014-0031; Title: NSPS for
Petroleum Dry Cleaners (40 CFR part 60, subpart JJJ); EPA ICR Number
0997.12; OMB Control Number 2060-0079; Expiration Date: March 31, 2019.
Respondents: Petroleum dry cleaning facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart JJJ).
Estimated number of respondents: 20 (total).
Frequency of response: Initially.
Annual estimated burden: 1,850 hours.
Annual estimated cost: $186,000, includes no annualized capital or
O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(62) Docket ID Number: EPA-HQ-OECA-2012-0529; Title: NESHAP for
Mercury (40 CFR part 61, subpart E); EPA ICR Number 0113.13; OMB
Control Number 2060-0097; Expiration Date: March 31, 2019.
Respondents: Facilities that process mercury ore to recover
mercury, use mercury chlor-alkali cells to produce chlorine gas and
alkali metal hydroxide, and incinerate or dry wastewater treatment
plant sludge.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart E).
Estimated number of respondents: 107 (total).
Frequency of response: Initially, occasionally, semiannually and
annually.
Annual estimated burden: 20,600 hours.
Annual estimated cost: $2,070,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(63) Docket ID Number: EPA-HQ-OECA-2014-0025; Title: NESHAP for
Asbestos (40 CFR part 61, subpart M); EPA ICR Number 0111.15; OMB
Control Number 2060-0101; Expiration Date: March 31, 2019.
Respondents: Demolition and renovation facilities; asbestos waste
disposal; asbestos milling, manufacturing, and fabricating facilities;
use of asbestos on roadways; asbestos waste converting facilities; and
use of asbestos insulation and sprayed-on materials.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart M).
Estimated number of respondents: 9,575 (total).
Frequency of response: Initially, occasionally, quarterly and
semiannually.
Annual estimated burden: 292,000 hours.
Annual estimated cost: $29,400,000, includes no annualized capital
or O&M costs.
[[Page 29560]]
Changes in Estimates: There is a projected increase in burden due
to a net increase in the number of sources subject to the regulation.
(64) Docket ID Number: EPA-HQ-OECA-2012-0530; Title: NSPS for Metal
Furniture Coating (40 CFR part 60, subpart EE); EPA ICR Number 0649.13;
OMB Control Number 2060-0106; Expiration Date: March 31, 2019.
Respondents: Metal furniture surface coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart EE).
Estimated number of respondents: 400 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 56,500 hours.
Annual estimated cost: $6,530,000, includes $840,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(65) Docket ID Number: EPA-HQ-OECA-2012-0531; Title: NSPS for
Surface Coating of Large Appliances (40 CFR part 60, subpart SS); EPA
ICR Number 0659.14; OMB Control Number 2060-0108; Expiration Date:
March 31, 2019.
Respondents: Large appliance coating facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart SS).
Estimated number of respondents: 72 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 7,740 hours.
Annual estimated cost: $787,000, includes $8,400 annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(66) Docket ID Number: EPA-HQ-OECA-2013-0331; Title: NSPS for New
Residential Wood Heaters (40 CFR part 60, subpart AAA); EPA ICR Number
1176.13; OMB Control Number 2060-0161; Expiration Date: March 31, 2019.
Respondents: Residential wood heaters.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart AAA).
Estimated number of respondents: 66 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 8,840 hours.
Annual estimated cost: $1,720,000, includes $1,470,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(67) Docket ID Number: EPA-HQ-OECA-2014-0046; Title: NESHAP for
Benzene Waste Operations (40 CFR part 61, subpart FF); EPA ICR Number
1541.12; OMB Control Number 2060-0183; Expiration Date: March 31, 2019.
Respondents: Facilities that generate waste containing benzene, and
hazardous waste treatment, storage, and disposal facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart FF).
Estimated number of respondents: 270 (total).
Frequency of response: Initially, quarterly and annually.
Annual estimated burden: 19,200 hours.
Annual estimated cost: $1,930,000, includes no annualized capital
or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(68) Docket ID Number: EPA-HQ-OECA-2009-0422; Title: NESHAP for
Chromium Emissions from Hard and Decorative Chromium Electroplating and
Chromium Anodizing Tanks (40 CFR part 63, subpart N); EPA ICR Number
1611.12; OMB Control Number 2060-0327; Expiration Date: March 31, 2019.
Respondents: Hard chromium electroplating, decorative chromium
electroplating, and chromium anodizing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart N).
Estimated number of respondents: 1,343 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 242,000 hours.
Annual estimated cost: $29,700,000, includes $20,400,000 annualized
capital or O&M costs.
Changes in Estimates: There is no change in burden from the
previous ICR.
(69) Docket ID Number: EPA-HQ-OECA-2017-0200; Title: NESHAP for
Rubber Tire Manufacturing (40 CFR part 63, subpart XXXX); EPA ICR
Number 1982.01; OMB Control Number 2060-NEW.
Respondents: Major source rubber tire manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart XXXX).
Estimated number of respondents: 36 (total).
Frequency of response: Initially, occasionally and semiannually.
Annual estimated burden: 12,807 hours.
Annual estimated cost: $2,058,337, includes $1,357,000 annualized
capital or O&M costs.
(70) Docket ID Number: EPA-HQ-OECA-2017-0201; Title: NESHAP for
Inorganic Arsenic Emissions from Primary Copper Smelters (40 CFR part
61, subpart O); EPA ICR Number 1089.04; OMB Control Number 2060-NEW.
Respondents: Copper converter at primary copper smelters.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart O).
Estimated number of respondents: 59 (total).
Frequency of response: Initially, quarterly and annually.
Annual estimated burden: 3,167 hours.
Annual estimated cost: $297,703, includes $2,000 annualized capital
or O&M costs.
Dated: April 27, 2017.
Edward J. Messina,
Director, Monitoring, Assistance and Media Programs Division.