Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 29071 [2017-13388]

Download as PDF mstockstill on DSK30JT082PROD with NOTICES Federal Register / Vol. 82, No. 122 / Tuesday, June 27, 2017 / Notices of the Aroo Pioneer Peak Pumped Storage Hydro Project to be located near Archbald Borough and Jefferson Township in Lackawanna County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 116 acres and a storage capacity of 1,740 acre-feet at a surface elevation of approximately 2,265 feet above mean sea level (msl) created through construction of a new rollercompacted concrete or rock-fill dam; (2) a new lower reservoir with a surface area of 184 acres and a storage capacity of 2,088 acre-feet at a surface elevation of 1,400 feet msl; (3) a new 10,000-footlong, 48-inch-diameter penstock connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50foot-wide, 25-foot-high powerhouse containing two turbine-generator units with a total rated capacity of 123 megawatts; (5) a new 2,640-foot-long transmission line connecting the powerhouse to the PPL Electric Utilities’ Peckville 230-kilovolt circuit; and (6) appurtenant facilities. The proposed project would have an annual generation of 450,380 megawatt-hours. Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267–254–6107. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 VerDate Sep<11>2014 18:33 Jun 26, 2017 Jkt 241001 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14822–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14822) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 21, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–13387 Filed 6–26–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14825–000] Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 18, 2017, Merchant Hydro Developers, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Four Mile Pumped Storage Hydro Project to be located near the City of Frostburg in Allegany County, Maryland. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 168 acres and a storage capacity of 2,520 acre-feet at a surface elevation of approximately 2,800 feet above mean sea level (msl) created through construction of a new rollercompacted concrete or rock-fill dam; (2) a new lower reservoir with a surface area of 55 acres and a storage capacity of 3,024 acre-feet at a surface elevation of 2,250 feet msl; (3) a new 5,823-footlong, 48-inch-diameter penstock connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50foot-wide, 25-foot-high powerhouse PO 00000 Frm 00050 Fmt 4703 Sfmt 9990 29071 containing two turbine-generator units with a total rated capacity of 114 megawatts; (5) a new 2,640-foot-long transmission line connecting the powerhouse to the Frostburg-Jennings 138-kilovolt circuit owned by Potomac Edison; and (6) appurtenant facilities. The proposed project would have an annual generation of 414,741 megawatthours. Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267–254–6107. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14825–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14825) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 21, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–13388 Filed 6–26–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\27JNN1.SGM 27JNN1

Agencies

[Federal Register Volume 82, Number 122 (Tuesday, June 27, 2017)]
[Notices]
[Page 29071]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-13388]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14825-000]


Merchant Hydro Developers, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 18, 2017, Merchant Hydro Developers, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the Four 
Mile Pumped Storage Hydro Project to be located near the City of 
Frostburg in Allegany County, Maryland. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 168 acres and a storage capacity 
of 2,520 acre-feet at a surface elevation of approximately 2,800 feet 
above mean sea level (msl) created through construction of a new 
roller-compacted concrete or rock-fill dam; (2) a new lower reservoir 
with a surface area of 55 acres and a storage capacity of 3,024 acre-
feet at a surface elevation of 2,250 feet msl; (3) a new 5,823-foot-
long, 48-inch-diameter penstock connecting the upper and lower 
reservoirs; (4) a new 150-foot-long, 50-foot-wide, 25-foot-high 
powerhouse containing two turbine-generator units with a total rated 
capacity of 114 megawatts; (5) a new 2,640-foot-long transmission line 
connecting the powerhouse to the Frostburg-Jennings 138-kilovolt 
circuit owned by Potomac Edison; and (6) appurtenant facilities. The 
proposed project would have an annual generation of 414,741 megawatt-
hours.
    Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14825-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14825) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 21, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-13388 Filed 6-26-17; 8:45 am]
 BILLING CODE 6717-01-P