Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 28309 [2017-12927]
Download as PDF
Federal Register / Vol. 82, No. 118 / Wednesday, June 21, 2017 / Notices
evaluation to determine whether a text
messaging intervention can improve
student attendance in a cost effective
manner is warranted.
To our knowledge, this project is the
first multidistrict random assignment
study of the impact of a text messaging
intervention for parents on student
attendance and achievement. In
addition, consistent with the
Consolidated and Further Continuing
Appropriations Act, 2015 (Pub. L. 113–
235), which provides the legislative
authority to conduct this study, this
study will focus on low-performing
schools with high levels of poverty and
student absenteeism.
Dated: June 16, 2017.
Kate Mullan,
Acting Director Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2017–12945 Filed 6–20–17; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–462–000]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on June 8, 2017,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
a prior notice application pursuant to
sections 157.205, and 157.216(b) of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Columbia’s blanket certificate issued in
Docket No. CP83–76–000. Columbia
requests authorization to construct and
operate one new storage well and
related appurtenances at Columbia’s
Pavonia Storage Field located in
Ashland and Richland Counties, Ohio,
all as more fully set forth in the
application which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Robert
D. Jackson, Manager, Certificates &
Regulatory Administration, Columbia
VerDate Sep<11>2014
19:12 Jun 20, 2017
Jkt 241001
Gas Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, at (832) 320–5487 or FAX
(832) 320–6487, or robert_jackson@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
28309
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Daylight Savings Time on August 14,
2017.
Dated: June 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12927 Filed 6–20–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–461–000]
1057533 Alberta Ltd. and 1978740
Alberta Ltd.; Notice of Application for
Section 3 Authorization and
Presidential Permit
Take notice that on June 5, 2017,
1057533 Alberta Ltd. (Alberta Ltd.),
1500, 700 2nd Street SW., Calgary,
Alberta, T2P 2W1 Canada, and 1978740
Alberta Ltd. (Spartan US), 500, 850 2nd
Street SW., Calgary, Alberta, T2P 0R8
Canada, filed the above referenced
docket an application, pursuant to
section 3 of the Natural Gas Act (NGA)
and Section 153 of the Commission’s
regulations, for the importation of
natural gas and a Presidential Permit to
operate and maintain the import
facilities, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. This filing may be also
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call (202) 502–8222 or TTY,
(202) 208–1659.
Any questions regarding this
application should be directed to
Gregory Junge, Esq., Van Ness Feldman
LLP, 1050 Thomas Jefferson Street NW.,
Washington, DC 20007 or call (202)
298–1945 or Jon Lowes, Vice President,
Land, Harvest Operations Corp., 1500,
700 2nd Street SW., Calgary, AB Canada
T2P 2W1 or call (403) 231–5253.
E:\FR\FM\21JNN1.SGM
21JNN1
Agencies
[Federal Register Volume 82, Number 118 (Wednesday, June 21, 2017)]
[Notices]
[Page 28309]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12927]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-462-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on June 8, 2017, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700,
filed a prior notice application pursuant to sections 157.205, and
157.216(b) of the Federal Energy Regulatory Commission's (Commission)
regulations under the Natural Gas Act (NGA), and Columbia's blanket
certificate issued in Docket No. CP83-76-000. Columbia requests
authorization to construct and operate one new storage well and related
appurtenances at Columbia's Pavonia Storage Field located in Ashland
and Richland Counties, Ohio, all as more fully set forth in the
application which is open to the public for inspection. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or
TTY, (202) 502-8659.
Any questions regarding this application should be directed to
Robert D. Jackson, Manager, Certificates & Regulatory Administration,
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700,
Houston, Texas 77002-2700, at (832) 320-5487 or FAX (832) 320-6487, or
robert_jackson@transcanada.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Daylight Savings Time on August 14,
2017.
Dated: June 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12927 Filed 6-20-17; 8:45 am]
BILLING CODE 6717-01-P