Sunshine Act Notice, 27827 [2017-12785]
Download as PDF
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices
pressure monitor shall meet the
requirements in Table 3. Maintenance
periods, instrument adjustments or
checks to maintain precision and
accuracy, and zero and span
adjustments may not exceed 5 percent
of the time the flare is receiving
regulated material.
(5) Recordkeeping Requirements.
(a) All data must be recorded and
maintained for a minimum of 3 years or
for as long as required under applicable
rule subpart(s), whichever is longer.
(6) Reporting Requirements.
(a) The information specified in
sections III (6)(b) and (c) of this
document below must be reported in the
timeline specified by the applicable rule
subpart(s) for which the MPGF will
control emissions.
(b) Owners or operators shall include
the following information in their initial
Notification of Compliance status
report:
(i) Specify flare design as a pressureassisted MPGF. CP Chem’s polyethylene
plant shall also clearly note that HP
stages 1 and 2 are also steam-assisted.
(ii) All visible emission readings,
NHVcz and/or LFLcz determinations, and
flow rate measurements. For MPGF, exit
velocity determinations do not need to
be reported as the maximum permitted
velocity requirements in the General
Provisions at 40 CFR 60.18(b) and 40
CFR 63.11(b) are not applicable.
(iii) All periods during the
compliance determination when a
complete loss of pilot flame on any stage
of MPGF burners occurs, and, for HP
stages 1 and 2 of CP Chem’s
polyethylene plant MPGF, all periods
during the compliance determination
when a complete loss of pilot flame on
an individual burner occurs.
(iv) All periods during the compliance
determination when the pressure
monitor(s) on the main flare header
show the MPGF burners operating
outside the range of tested conditions or
outside the range of the manufacturer’s
specifications.
(v) All periods during the compliance
determination when the staging valve
position indicator monitoring system
indicates a stage of the MPGF should
not be in operation and is or when a
stage of the MPGF should be in
operation and is not.
(c) The owner or operator shall notify
the Administrator of periods of excess
emissions in their Periodic Reports.
These periods of excess emissions shall
include:
(i) Records of each 15-minute block
for all HP stages of CP Chem’s ethylene
plant MPGF and for all HP stages
excluding stages 1 and 2 of CP Chem’s
polyethylene plant MPGF during which
VerDate Sep<11>2014
17:09 Jun 16, 2017
Jkt 241001
there was at least 1 minute when
regulated material was routed to the
MPGF and a complete loss of pilot flame
on a stage of burners occurred, and, for
HP stages 1 and 2 of CP Chem’s
polyethylene plant MPGF, records of
each 15-minute block during which
there was at least 1 minute when
regulated material was routed to the
MPGF and a complete loss of pilot flame
on an individual burner occurred.
(ii) Records of visible emissions
events (including the time and date
stamp) that exceed more than 5 minutes
in any 2-hour consecutive period.
(iii) Records of each 15-minute block
period for which an applicable
combustion zone operating limit (i.e.,
NHVcz or LFLcz) is not met for the MPGF
when regulated material is being
combusted in the flare. Indicate the date
and time for each period, the NHVcz
and/or LFLcz operating parameter for the
period and the type of monitoring
system used to determine compliance
with the operating parameters (e.g., gas
chromatograph or calorimeter). For CP
Chem’s polyethylene plant MPGF, also
indicate which HP stages were in use.
(iv) Records of when the pressure
monitor(s) on the main flare header
show the MPGF burners are operating
outside the range of tested conditions or
outside the range of the manufacturer’s
specifications. Indicate the date and
time for each period, the pressure
measurement, the stage(s) and number
of MPGF burners affected, and the range
of tested conditions or manufacturer’s
specifications.
(v) Records of when the staging valve
position indicator monitoring system
indicates a stage of the MPGF should
not be in operation and is or when a
stage of the MPGF should be in
operation and is not. Indicate the date
and time for each period, whether the
stage was supposed to be open, but was
closed or vice versa, and the stage(s) and
number of MPGF burners affected.
Dated: June 1, 2017.
Stephen Page,
Director, Office of Air Quality Planning and
Standards.
[FR Doc. 2017–12688 Filed 6–16–17; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL ELECTION COMMISSION
Sunshine Act Notice
Federal Election Commission.
Thursday, June 22, 2017
at 10:00 a.m.
PLACE: 999 E Street NW., Washington,
DC (Ninth Floor).
AGENCY:
DATE AND TIME:
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
STATUS:
27827
This hearing will be open to the
public.
Audit Hearing:
Illinois Republican Party.
Individuals who plan to attend and
require special assistance, such as sign
language interpretation or other
reasonable accommodations, should
contact Dayna Brown, Secretary and
Clerk, at (202) 694–1040, at least 72
hours prior to the hearing date.
PERSON TO CONTACT FOR INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
ITEM TO BE DISCUSSED:
Dayna C. Brown,
Secretary and Clerk of the Commission.
[FR Doc. 2017–12785 Filed 6–15–17; 11:15 am]
BILLING CODE 6715–01–P
FEDERAL RESERVE SYSTEM
Notice of Proposals To Engage in or
To Acquire Companies Engaged in
Permissible Nonbanking Activities
The companies listed in this notice
have given notice under section 4 of the
Bank Holding Company Act (12 U.S.C.
1843) (BHC Act) and Regulation Y, (12
CFR part 225) to engage de novo, or to
acquire or control voting securities or
assets of a company, including the
companies listed below, that engages
either directly or through a subsidiary or
other company, in a nonbanking activity
that is listed in § 225.28 of Regulation Y
(12 CFR 225.28) or that the Board has
determined by Order to be closely
related to banking and permissible for
bank holding companies. Unless
otherwise noted, these activities will be
conducted throughout the United States.
Each notice is available for inspection
at the Federal Reserve Bank indicated.
The notice also will be available for
inspection at the offices of the Board of
Governors. Interested persons may
express their views in writing on the
question whether the proposal complies
with the standards of section 4 of the
BHC Act.
Unless otherwise noted, comments
regarding the applications must be
received at the Reserve Bank indicated
or the offices of the Board of Governors
not later than July 3, 2017.
A. Federal Reserve Bank of Dallas
(Robert L. Triplett III, Senior Vice
President) 2200 North Pearl Street,
Dallas, Texas 75201–2272:
1. First Baird Bancshares, Inc.,
Weatherford, Texas; to acquire directly
and indirectly voting shares of Sharp
BancSystems, Inc., Bedford, Texas, and
thereby engage in data processing
activities pursuant to section
225.28(b)(14)(i) of Regulation Y.
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Page 27827]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12785]
=======================================================================
-----------------------------------------------------------------------
FEDERAL ELECTION COMMISSION
Sunshine Act Notice
AGENCY: Federal Election Commission.
DATE AND TIME: Thursday, June 22, 2017 at 10:00 a.m.
PLACE: 999 E Street NW., Washington, DC (Ninth Floor).
STATUS: This hearing will be open to the public.
ITEM TO BE DISCUSSED: Audit Hearing: Illinois Republican Party.
Individuals who plan to attend and require special assistance, such
as sign language interpretation or other reasonable accommodations,
should contact Dayna Brown, Secretary and Clerk, at (202) 694-1040, at
least 72 hours prior to the hearing date.
PERSON TO CONTACT FOR INFORMATION: Judith Ingram, Press Officer,
Telephone: (202) 694-1220.
Dayna C. Brown,
Secretary and Clerk of the Commission.
[FR Doc. 2017-12785 Filed 6-15-17; 11:15 am]
BILLING CODE 6715-01-P