Download as PDF Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices Description: Tariff Amendment: Clarification to Amended and Restated WPC to be effective 5/3/2017. Filed Date: 6/12/17. Accession Number: 20170612–5064. Comments Due: 5 p.m. ET 7/3/17. asabaliauskas on DSKBBXCHB2PROD with NOTICES Docket Numbers: ER17–1800–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: § 205(d) Rate Filing: South Dakota Rev TSA–385–0.0.0 to be effective 1/1/2017. Filed Date: 6/12/17. Accession Number: 20170612–5137. Comments Due: 5 p.m. ET 7/3/17. Docket Numbers: ER17–1801–000. Applicants: American Transmission Systems, Incorporated, Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI and MAIT submit Seven Engineering and Construction Services Agreements to be effective 8/12/2017. Filed Date: 6/13/17. Accession Number: 20170613–5019. Comments Due: 5 p.m. ET 7/5/17. Docket Numbers: ER17–1802–000. Applicants: Fowler Ridge II Wind Farm LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 8/12/2017. Filed Date: 6/12/17. Accession Number: 20170612–5177. Comments Due: 5 p.m. ET 7/3/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 13, 2017. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Notice of Commission Staff Attendance Combined Notice of Filings #1 The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of Tucson Electric Power Company, UNS Electric, Inc., Public Service Company of New Mexico, Arizona Public Service Company, El Paso Electric Company, Black Hills Power, Inc., Black Hills Colorado Electric Utility Company, LP, Cheyenne Light, Fuel, & Power Company, NV Energy, Inc.; and Xcel Energy Services, Inc. on behalf of Public Service Company of Colorado: Planning Management Committee Meeting, June 21, 2017, 9 a.m.–3 p.m. (MDT) Planning Management Committee Meeting, July 17, 2017, 9 a.m.–3 p.m. (MDT) The June 21, 2017 Planning Management Committee Meeting will be held at: Xcel Energy, 1800 Larimer St., Denver, CO 80202. The July 17, 2017 Planning Management Committee Meeting will be held at: 111 N. Hope St., Los Angeles, CA 90012. The above-referenced meetings will be available via web conference and teleconference. The above-referenced meetings are open to stakeholders. Further information may be found at https://www.westconnect.com/. The discussions at the meetings described above may address matters at issue in the following proceeding: ER13–75, Public Service Company of New Mexico; El Paso Electric Company For more information contact Nicole Cramer, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–6775 or nicole.cramer@ferc.gov. Dated: June 8, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12679 Filed 6–16–17; 8:45 am] [FR Doc. 2017–12660 Filed 6–16–17; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P VerDate Sep<11>2014 17:09 Jun 16, 2017 Jkt 241001 27807 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2290–005. Applicants: Avista Corporation. Description: Third Amendment to June 30, 2016 Triennial Market Power Update for the Northwest Region of Avista Corporation. Filed Date: 6/7/17. Accession Number: 20170607–5177. Comments Due: 5 p.m. ET 6/28/17. Docket Numbers: ER16–2703–003. Applicants: Deerfield Wind Energy, LLC. Description: Notice of Non-Material Change in Status of Deerfield Wind Energy, LLC. Filed Date: 6/7/17. Accession Number: 20170607–5175. Comments Due: 5 p.m. ET 6/28/17. Docket Numbers: ER17–1515–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2017–06–07_Amendment to filing to revise MRES Att O inc. RTO Adder Request to be effective 7/1/2017. Filed Date: 6/7/17. Accession Number: 20170607–5154. Comments Due: 5 p.m. ET 6/28/17. Docket Numbers: ER17–1771–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEPWinterville RS No. 178 Revised PPA to be effective 7/1/2017. Filed Date: 6/7/17. Accession Number: 20170607–5123. Comments Due: 5 p.m. ET 6/28/17. Docket Numbers: ER17–1772–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits Revised Operating and Interconnection Agreement SA No. 4578 to be effective 6/1/2017. Filed Date: 6/8/17. Accession Number: 20170608–5040. Comments Due: 5 p.m. ET 6/29/17. Docket Numbers: ER17–1773–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ATSI submits revised Service Agreement Nos. 3992 and 3993 to be effective 7/1/2017. Filed Date: 6/8/17. Accession Number: 20170608–5045. E:\FR\FM\19JNN1.SGM 19JNN1 27808 Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices Comments Due: 5 p.m. ET 6/29/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 8, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12680 Filed 6–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSKBBXCHB2PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1790–015; ER10–2596–006; ER10–2597–004; ER12–2200–003. Applicants: BP Energy Company, Fowler Ridge II Wind Farm LLC, Fowler Ridge III Wind Farm LLC, Mehoopany Wind Energy LLC. Description: Updated Market Analysis for Northeast Region of BP Energy Company, et al. Filed Date: 6/12/17. Accession Number: 20170612–5089. Comments Due: 5 p.m. ET 8/11/17. Docket Numbers: ER17–1532–001. Applicants: Golden Spread Electric Cooperative, Inc. Description: Tariff Amendment: Clarification to Amended and Restated WPC to be effective 5/3/2017. Filed Date: 6/12/17. Accession Number: 20170612–5064. Comments Due: 5 p.m. ET 7/3/17. Docket Numbers: ER17–1798–000. Applicants: Fowler Ridge III Wind Farm LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 8/12/2017. VerDate Sep<11>2014 17:09 Jun 16, 2017 Jkt 241001 Filed Date: 6/12/17. Accession Number: 20170612–5117. Comments Due: 5 p.m. ET 7/3/17. Docket Numbers: ER17–1799–000. Applicants: Mehoopany Wind Energy LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 8/12/2017. Filed Date: 6/12/17. Accession Number: 20170612–5124. Comments Due: 5 p.m. ET 7/3/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 12, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12673 Filed 6–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–22–000] Kinder Morgan Louisiana Pipeline, LLC; Notice of Schedule for Environmental Review of the Sabine Pass Expansion Project On December 13, 2016, Kinder Morgan Louisiana Pipeline, LLC (Kinder Morgan) filed an application in Docket No. CP17–22–000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(b) and 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. The proposed project is known as the Sabine Pass Expansion Project (Project), and would allow Kinder Morgan to provide firm incremental transportation service of up to 600 million cubic feet per day of natural gas to the existing Sabine Pass Liquefaction Facility, that is currently PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 under expansion in Cameron Parish, Louisiana. On December 21, 2016 the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA: July 28, 2017. 90-day Federal Authorization Decision Deadline: October 26, 2017. If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Kinder Morgan proposes to construct and operate the Sabine Pass Expansion Project in Louisiana which consists of the following: (1) Modifications to four existing meter stations (Columbia Gulf Transmission, LLC; Texas Gas Transmission, LLC; ANR Pipeline Company; and Pine Prairie Energy Center) in Evangeline and Acadia Parishes; (2) construction of one new 36-inch-diameter delivery interconnect consisting of a 36-inch-diameter tap and appurtenances and 1,200 feet of 36inch-diameter lateral at the Sabine Pass Liquefaction Facility in Cameron Parish; (3) installation of three additional 15,900 horsepower compressor units at Kinder Morgan’s previously approved Compressor Station 760 in Acadia Parish; 1 (4) construction of 6,400 feet of 36-inch-diameter and 700 feet of 24inch-diameter header pipelines in Acadia Parish; and (5) replacement of a meter and increase in capacity from 200 to 650 million cubic feet per day at the existing Pine Prairie Meter Station in Acadia Parish. The proposed facilities would provide north-to-south transportation on Kinder Morgan’s system. Kinder Morgan proposes to begin construction of the Project by April 2018 and to place the facilities in service by April 1, 2019. 1 The compressor station has not yet been constructed, but was approved by Commission Order dated April 15, 2016 as part of the Lake Charles Expansion Project in Docket No. CP14–511– 000. E:\FR\FM\19JNN1.SGM 19JNN1

Agencies

[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Pages 27807-27808]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12680]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2290-005.
    Applicants: Avista Corporation.
    Description: Third Amendment to June 30, 2016 Triennial Market 
Power Update for the Northwest Region of Avista Corporation.
    Filed Date: 6/7/17.
    Accession Number: 20170607-5177.
    Comments Due: 5 p.m. ET 6/28/17.

    Docket Numbers: ER16-2703-003.
    Applicants: Deerfield Wind Energy, LLC.
    Description: Notice of Non-Material Change in Status of Deerfield 
Wind Energy, LLC.
    Filed Date: 6/7/17.
    Accession Number: 20170607-5175.
    Comments Due: 5 p.m. ET 6/28/17.

    Docket Numbers: ER17-1515-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2017-06-07_Amendment to filing to 
revise MRES Att O inc. RTO Adder Request to be effective 7/1/2017.
    Filed Date: 6/7/17.
    Accession Number: 20170607-5154.
    Comments Due: 5 p.m. ET 6/28/17.

    Docket Numbers: ER17-1771-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Sec.  205(d) Rate Filing: DEP-Winterville RS No. 178 
Revised PPA to be effective 7/1/2017.
    Filed Date: 6/7/17.
    Accession Number: 20170607-5123.
    Comments Due: 5 p.m. ET 6/28/17.

    Docket Numbers: ER17-1772-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits Revised 
Operating and Interconnection Agreement SA No. 4578 to be effective 6/
1/2017.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5040.
    Comments Due: 5 p.m. ET 6/29/17.

    Docket Numbers: ER17-1773-000.
    Applicants: American Transmission Systems, Incorporated, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: ATSI submits revised Service 
Agreement Nos. 3992 and 3993 to be effective 7/1/2017.
    Filed Date: 6/8/17.
    Accession Number: 20170608-5045.

[[Page 27808]]

    Comments Due: 5 p.m. ET 6/29/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12680 Filed 6-16-17; 8:45 am]
 BILLING CODE 6717-01-P