Kinder Morgan Louisiana Pipeline, LLC; Notice of Schedule for Environmental Review of the Sabine Pass Expansion Project, 27808-27809 [2017-12677]
Download as PDF
27808
Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices
Comments Due: 5 p.m. ET 6/29/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12680 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1790–015;
ER10–2596–006; ER10–2597–004;
ER12–2200–003.
Applicants: BP Energy Company,
Fowler Ridge II Wind Farm LLC, Fowler
Ridge III Wind Farm LLC, Mehoopany
Wind Energy LLC.
Description: Updated Market Analysis
for Northeast Region of BP Energy
Company, et al.
Filed Date: 6/12/17.
Accession Number: 20170612–5089.
Comments Due: 5 p.m. ET 8/11/17.
Docket Numbers: ER17–1532–001.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Tariff Amendment:
Clarification to Amended and Restated
WPC to be effective 5/3/2017.
Filed Date: 6/12/17.
Accession Number: 20170612–5064.
Comments Due: 5 p.m. ET 7/3/17.
Docket Numbers: ER17–1798–000.
Applicants: Fowler Ridge III Wind
Farm LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 8/12/2017.
VerDate Sep<11>2014
17:09 Jun 16, 2017
Jkt 241001
Filed Date: 6/12/17.
Accession Number: 20170612–5117.
Comments Due: 5 p.m. ET 7/3/17.
Docket Numbers: ER17–1799–000.
Applicants: Mehoopany Wind Energy
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 8/12/2017.
Filed Date: 6/12/17.
Accession Number: 20170612–5124.
Comments Due: 5 p.m. ET 7/3/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 12, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12673 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–22–000]
Kinder Morgan Louisiana Pipeline,
LLC; Notice of Schedule for
Environmental Review of the Sabine
Pass Expansion Project
On December 13, 2016, Kinder
Morgan Louisiana Pipeline, LLC (Kinder
Morgan) filed an application in Docket
No. CP17–22–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to Section 7(b) and
7(c) of the Natural Gas Act to construct
and operate certain natural gas pipeline
facilities. The proposed project is
known as the Sabine Pass Expansion
Project (Project), and would allow
Kinder Morgan to provide firm
incremental transportation service of up
to 600 million cubic feet per day of
natural gas to the existing Sabine Pass
Liquefaction Facility, that is currently
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
under expansion in Cameron Parish,
Louisiana.
On December 21, 2016 the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA: July 28, 2017.
90-day Federal Authorization
Decision Deadline: October 26, 2017.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Kinder Morgan proposes to construct
and operate the Sabine Pass Expansion
Project in Louisiana which consists of
the following: (1) Modifications to four
existing meter stations (Columbia Gulf
Transmission, LLC; Texas Gas
Transmission, LLC; ANR Pipeline
Company; and Pine Prairie Energy
Center) in Evangeline and Acadia
Parishes; (2) construction of one new
36-inch-diameter delivery interconnect
consisting of a 36-inch-diameter tap and
appurtenances and 1,200 feet of 36inch-diameter lateral at the Sabine Pass
Liquefaction Facility in Cameron Parish;
(3) installation of three additional
15,900 horsepower compressor units at
Kinder Morgan’s previously approved
Compressor Station 760 in Acadia
Parish; 1 (4) construction of 6,400 feet of
36-inch-diameter and 700 feet of 24inch-diameter header pipelines in
Acadia Parish; and (5) replacement of a
meter and increase in capacity from 200
to 650 million cubic feet per day at the
existing Pine Prairie Meter Station in
Acadia Parish. The proposed facilities
would provide north-to-south
transportation on Kinder Morgan’s
system.
Kinder Morgan proposes to begin
construction of the Project by April
2018 and to place the facilities in
service by April 1, 2019.
1 The compressor station has not yet been
constructed, but was approved by Commission
Order dated April 15, 2016 as part of the Lake
Charles Expansion Project in Docket No. CP14–511–
000.
E:\FR\FM\19JNN1.SGM
19JNN1
27809
Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices
Background
DEPARTMENT OF ENERGY
On January 24, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Sabine Pass Expansion Project
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; Native American tribes;
other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received a
comment from a stakeholder stating the
U.S. Army Corps of Engineers permits
and authorizations that would be
necessary for the various Project
components. The Commission also
received a comment letter from the
Louisiana Department of Wildlife and
Fisheries stating the Project would have
minimal or no long-term adverse
impacts on wetland functions and a
comment from the Choctaw Nation of
Oklahoma requesting to receive a copy
of the EA and the cultural resources
survey.
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–22), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: June 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12677 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:09 Jun 16, 2017
Jkt 241001
[Project No. 14568–002]
CB Energy Park, LLC; Notice of
Preliminary Permit Application
Accepted For Filing And Soliciting
Comments, Motions To Intervene, And
Competing Applications
On June 1, 2017, CB Energy Park, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Coffin Butte
Pumped Storage Project (project) to be
located near Two Dot in Wheatland and
Meagher Counties, Montana. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
Lower Reservoir
(1) A 5,000-foot-long, 50-foot-high
earth and roller compacted concrete
embankment; (2) a 50-acre lower
reservoir with a storage capacity of
2,500-acre-foot at an elevation of 5,200
feet; (3) a temporary pump and pipeline
to bring initial fill water to the lower
reservoir from Martinsdale Reservoir; (4)
a new well; (5) a powerhouse containing
two Ternary 125-megawatt (MW)
turbine/generator units, for a total
installed capacity of 250 MW; and (6) an
approximately 10-mile-long, 230kilovolt transmission line connecting to
the proposed Gordon Butte substation.
Upper Reservoir
(1) A 4,600-foot-long, 50-foot-high
earth and roller compacted concrete
embankment; (2) a 50-acre upper
reservoir with a storage capacity of
2,500-acre-foot at an elevation of 6,240
feet; (3) a 12-foot-diameter, 4,000-footlong steel-lined tunnel connecting the
two reservoirs; and (4) appurtenant
facilities.
The estimated annual generation of
the project would be 880,000 megawatthours.
Applicant Contact: Carl Borgquist, CB
Energy Park, LLC, 209 South Wilson
Avenue, P.O. Box 309, Bozeman, MT
59771, phone: (406) 585–3006; Martin J.
Weber, P.E., Stanley Consultants, Inc.,
5775 Wayzata Blvd., No. 300,
Minneapolis, MN 55416, phone: (952)
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
546–3669; or Steve Padula, McMillen
Jacobs and Associates, 500 Broadway
Street, Suite 606, Vancouver, WA
98660, phone: (360) 576–3579.
FERC Contact: Kim Nguyen, (202)
502–6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14568–002.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P–14568) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12669 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Supplemental Notice of Technical
Conference
Docket Nos.
Developments in Natural Gas
Index Liquidity and Transparency.
Price Discovery in Natural
Gas and Electric Markets.
Natural Gas Price Formation
ISO New England Inc ............
E:\FR\FM\19JNN1.SGM
19JNN1
AD17–12–000
PL03–3–000
AD03–7–000
ER17–795–000
ER17–795–001
Agencies
[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Pages 27808-27809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12677]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-22-000]
Kinder Morgan Louisiana Pipeline, LLC; Notice of Schedule for
Environmental Review of the Sabine Pass Expansion Project
On December 13, 2016, Kinder Morgan Louisiana Pipeline, LLC (Kinder
Morgan) filed an application in Docket No. CP17-22-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(b) and 7(c) of the Natural Gas Act to construct and operate certain
natural gas pipeline facilities. The proposed project is known as the
Sabine Pass Expansion Project (Project), and would allow Kinder Morgan
to provide firm incremental transportation service of up to 600 million
cubic feet per day of natural gas to the existing Sabine Pass
Liquefaction Facility, that is currently under expansion in Cameron
Parish, Louisiana.
On December 21, 2016 the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA: July 28, 2017.
90-day Federal Authorization Decision Deadline: October 26, 2017.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Kinder Morgan proposes to construct and operate the Sabine Pass
Expansion Project in Louisiana which consists of the following: (1)
Modifications to four existing meter stations (Columbia Gulf
Transmission, LLC; Texas Gas Transmission, LLC; ANR Pipeline Company;
and Pine Prairie Energy Center) in Evangeline and Acadia Parishes; (2)
construction of one new 36-inch-diameter delivery interconnect
consisting of a 36-inch-diameter tap and appurtenances and 1,200 feet
of 36-inch-diameter lateral at the Sabine Pass Liquefaction Facility in
Cameron Parish; (3) installation of three additional 15,900 horsepower
compressor units at Kinder Morgan's previously approved Compressor
Station 760 in Acadia Parish; \1\ (4) construction of 6,400 feet of 36-
inch-diameter and 700 feet of 24-inch-diameter header pipelines in
Acadia Parish; and (5) replacement of a meter and increase in capacity
from 200 to 650 million cubic feet per day at the existing Pine Prairie
Meter Station in Acadia Parish. The proposed facilities would provide
north-to-south transportation on Kinder Morgan's system.
---------------------------------------------------------------------------
\1\ The compressor station has not yet been constructed, but was
approved by Commission Order dated April 15, 2016 as part of the
Lake Charles Expansion Project in Docket No. CP14-511-000.
---------------------------------------------------------------------------
Kinder Morgan proposes to begin construction of the Project by
April 2018 and to place the facilities in service by April 1, 2019.
[[Page 27809]]
Background
On January 24, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Sabine Pass
Expansion Project and Request for Comments on Environmental Issues
(NOI). The NOI was sent to affected landowners; federal, state, and
local government agencies; elected officials; Native American tribes;
other interested parties; and local libraries and newspapers. In
response to the NOI, the Commission received a comment from a
stakeholder stating the U.S. Army Corps of Engineers permits and
authorizations that would be necessary for the various Project
components. The Commission also received a comment letter from the
Louisiana Department of Wildlife and Fisheries stating the Project
would have minimal or no long-term adverse impacts on wetland functions
and a comment from the Choctaw Nation of Oklahoma requesting to receive
a copy of the EA and the cultural resources survey.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-22), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: June 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12677 Filed 6-16-17; 8:45 am]
BILLING CODE 6717-01-P