CB Energy Park, LLC; Notice of Preliminary Permit Application Accepted For Filing And Soliciting Comments, Motions To Intervene, And Competing Applications, 27809 [2017-12669]
Download as PDF
27809
Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices
Background
DEPARTMENT OF ENERGY
On January 24, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Sabine Pass Expansion Project
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; Native American tribes;
other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received a
comment from a stakeholder stating the
U.S. Army Corps of Engineers permits
and authorizations that would be
necessary for the various Project
components. The Commission also
received a comment letter from the
Louisiana Department of Wildlife and
Fisheries stating the Project would have
minimal or no long-term adverse
impacts on wetland functions and a
comment from the Choctaw Nation of
Oklahoma requesting to receive a copy
of the EA and the cultural resources
survey.
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–22), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: June 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12677 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:09 Jun 16, 2017
Jkt 241001
[Project No. 14568–002]
CB Energy Park, LLC; Notice of
Preliminary Permit Application
Accepted For Filing And Soliciting
Comments, Motions To Intervene, And
Competing Applications
On June 1, 2017, CB Energy Park, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Coffin Butte
Pumped Storage Project (project) to be
located near Two Dot in Wheatland and
Meagher Counties, Montana. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
Lower Reservoir
(1) A 5,000-foot-long, 50-foot-high
earth and roller compacted concrete
embankment; (2) a 50-acre lower
reservoir with a storage capacity of
2,500-acre-foot at an elevation of 5,200
feet; (3) a temporary pump and pipeline
to bring initial fill water to the lower
reservoir from Martinsdale Reservoir; (4)
a new well; (5) a powerhouse containing
two Ternary 125-megawatt (MW)
turbine/generator units, for a total
installed capacity of 250 MW; and (6) an
approximately 10-mile-long, 230kilovolt transmission line connecting to
the proposed Gordon Butte substation.
Upper Reservoir
(1) A 4,600-foot-long, 50-foot-high
earth and roller compacted concrete
embankment; (2) a 50-acre upper
reservoir with a storage capacity of
2,500-acre-foot at an elevation of 6,240
feet; (3) a 12-foot-diameter, 4,000-footlong steel-lined tunnel connecting the
two reservoirs; and (4) appurtenant
facilities.
The estimated annual generation of
the project would be 880,000 megawatthours.
Applicant Contact: Carl Borgquist, CB
Energy Park, LLC, 209 South Wilson
Avenue, P.O. Box 309, Bozeman, MT
59771, phone: (406) 585–3006; Martin J.
Weber, P.E., Stanley Consultants, Inc.,
5775 Wayzata Blvd., No. 300,
Minneapolis, MN 55416, phone: (952)
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
546–3669; or Steve Padula, McMillen
Jacobs and Associates, 500 Broadway
Street, Suite 606, Vancouver, WA
98660, phone: (360) 576–3579.
FERC Contact: Kim Nguyen, (202)
502–6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14568–002.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P–14568) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: June 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12669 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Supplemental Notice of Technical
Conference
Docket Nos.
Developments in Natural Gas
Index Liquidity and Transparency.
Price Discovery in Natural
Gas and Electric Markets.
Natural Gas Price Formation
ISO New England Inc ............
E:\FR\FM\19JNN1.SGM
19JNN1
AD17–12–000
PL03–3–000
AD03–7–000
ER17–795–000
ER17–795–001
Agencies
[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Page 27809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12669]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14568-002]
CB Energy Park, LLC; Notice of Preliminary Permit Application
Accepted For Filing And Soliciting Comments, Motions To Intervene, And
Competing Applications
On June 1, 2017, CB Energy Park, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Coffin Butte Pumped Storage
Project (project) to be located near Two Dot in Wheatland and Meagher
Counties, Montana. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following:
Lower Reservoir
(1) A 5,000-foot-long, 50-foot-high earth and roller compacted
concrete embankment; (2) a 50-acre lower reservoir with a storage
capacity of 2,500-acre-foot at an elevation of 5,200 feet; (3) a
temporary pump and pipeline to bring initial fill water to the lower
reservoir from Martinsdale Reservoir; (4) a new well; (5) a powerhouse
containing two Ternary 125-megawatt (MW) turbine/generator units, for a
total installed capacity of 250 MW; and (6) an approximately 10-mile-
long, 230-kilovolt transmission line connecting to the proposed Gordon
Butte substation.
Upper Reservoir
(1) A 4,600-foot-long, 50-foot-high earth and roller compacted
concrete embankment; (2) a 50-acre upper reservoir with a storage
capacity of 2,500-acre-foot at an elevation of 6,240 feet; (3) a 12-
foot-diameter, 4,000-foot-long steel-lined tunnel connecting the two
reservoirs; and (4) appurtenant facilities.
The estimated annual generation of the project would be 880,000
megawatt-hours.
Applicant Contact: Carl Borgquist, CB Energy Park, LLC, 209 South
Wilson Avenue, P.O. Box 309, Bozeman, MT 59771, phone: (406) 585-3006;
Martin J. Weber, P.E., Stanley Consultants, Inc., 5775 Wayzata Blvd.,
No. 300, Minneapolis, MN 55416, phone: (952) 546-3669; or Steve Padula,
McMillen Jacobs and Associates, 500 Broadway Street, Suite 606,
Vancouver, WA 98660, phone: (360) 576-3579.
FERC Contact: Kim Nguyen, (202) 502-6105.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14568-002.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P-14568) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: June 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12669 Filed 6-16-17; 8:45 am]