Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for Environmental Review of the St. James Supply Project, 27812 [2017-12661]
Download as PDF
27812
Federal Register / Vol. 82, No. 116 / Monday, June 19, 2017 / Notices
• Vince Kaminski, Professor in Practice
of Energy, Rice University
• Curtis Moffatt, Deputy General
Counsel and Vice President, Kinder
Morgan
• Joe Bowring, President, Monitoring
Analytics
• Corey Grindal, Senior Vice
President—Gas Supply, Cheniere
Energy
• Tom Haywood, Editor—Natural Gas
Week, Energy Intelligence
• Drew Fossum, Senior Vice President
and General Counsel, Tenaska Inc.
• Joan Dreskin, Vice President and
General Counsel, Interstate Natural
Gas Association of America
5:25 p.m.–5:30 p.m.
Closing Remarks
[FR Doc. 2017–12671 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–58–000]
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Transcontinental Gas Pipe Line
Company, LLC; Notice of Schedule for
Environmental Review of the St. James
Supply Project
On February 6, 2017,
Transcontinental Gas Pipe Line
Company, LLC (Transco) filed an
application in Docket No. CP17–58–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the St. James Supply Project
(Project), and would deliver 161,500
dekatherms per day of firm
transportation capacity from Transco’s
existing mainline Compressor Station 65
in St. Helena Parish, Louisiana to the
planned Yuhuang Chemical Plant in St.
James Parish, Louisiana.
On February 21, 2017, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—July 24, 2017.
VerDate Sep<11>2014
17:09 Jun 16, 2017
Jkt 241001
90-day Federal Authorization
Decision Deadline—October 22, 2017.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The St. James Supply Project would
consist of 0.7 mile of 20-inch-diameter
pipeline, one new pig receiver site,1 a
new interconnection to the planned
Yuhuang Chemical Plant site, one new
valve and piping to tie the Old River
Road M&R Station into the existing
Southeast Lateral Pipeline, and piping
and valve modifications at existing
Transco Compressor Stations 63 and 65.
Background
On March 17, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed St. James Supply Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries. In response to the NOI, the
Commission received letters from the
Seminole Nation of Oklahoma, the
Quapaw Tribe of Oklahoma, and the
Choctaw Nation of Oklahoma. No
concerns about historic resources were
raised.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the eLibrary
link, select General Search from the
eLibrary menu, enter the selected date
range and Docket Number excluding the
last three digits (i.e., CP17–58), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
1 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
Web site also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: June 12, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12661 Filed 6–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1774–000.
Applicants: NextEra Energy Bluff
Point, LLC.
Description: Baseline eTariff Filing:
NextEra Energy Bluff Point, LLC
Application for Market-Based Rates to
be effective 8/7/2017.
Filed Date: 6/8/17.
Accession Number: 20170608–5077.
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1775–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 265, Amendment No. 1
PV-Morgan 500kV to be effective 8/8/
2016.
Filed Date: 6/8/17.
Accession Number: 20170608–5083.
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1776–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Bylaws 3.1 and 3.3.2 Revisions (Chair
and Vice Chair Terms) to be effective
8/7/2017.
Filed Date: 6/8/17.
Accession Number: 20170608–5096.
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1777–000.
Applicants: Midcontinent
Independent System Operator Inc.,
Entergy Services, Inc.
Description: Compliance filing: 2017–
06–08_Filing to implement Entergy
settlement in Docket No. ER16–227 to
be effective 1/1/2016.
Filed Date: 6/8/17.
Accession Number: 20170608–5117.
Comments Due: 5 p.m. ET 6/29/17.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR17–5–000.
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 82, Number 116 (Monday, June 19, 2017)]
[Notices]
[Page 27812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12661]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-58-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule
for Environmental Review of the St. James Supply Project
On February 6, 2017, Transcontinental Gas Pipe Line Company, LLC
(Transco) filed an application in Docket No. CP17-58-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities. The proposed project is known as the St. James
Supply Project (Project), and would deliver 161,500 dekatherms per day
of firm transportation capacity from Transco's existing mainline
Compressor Station 65 in St. Helena Parish, Louisiana to the planned
Yuhuang Chemical Plant in St. James Parish, Louisiana.
On February 21, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--July 24, 2017.
90-day Federal Authorization Decision Deadline--October 22, 2017.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The St. James Supply Project would consist of 0.7 mile of 20-inch-
diameter pipeline, one new pig receiver site,\1\ a new interconnection
to the planned Yuhuang Chemical Plant site, one new valve and piping to
tie the Old River Road M&R Station into the existing Southeast Lateral
Pipeline, and piping and valve modifications at existing Transco
Compressor Stations 63 and 65.
---------------------------------------------------------------------------
\1\ A pig is a tool that the pipeline company inserts into and
pushes through the pipeline for cleaning the pipeline, conducting
internal inspections, or other purposes.
---------------------------------------------------------------------------
Background
On March 17, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed St. James Supply
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries.
In response to the NOI, the Commission received letters from the
Seminole Nation of Oklahoma, the Quapaw Tribe of Oklahoma, and the
Choctaw Nation of Oklahoma. No concerns about historic resources were
raised.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-58), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: June 12, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-12661 Filed 6-16-17; 8:45 am]
BILLING CODE 6717-01-P