Valley Crossing Pipeline, LLC; Notice of Schedule for Environmental Review of the Border Crossing Project, 27477 [2017-12392]

Download as PDF pmangrum on DSK3GDR082PROD with NOTICES Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices Comments Due: 5 p.m. ET 6/29/17. Docket Numbers: ER17–1778–000. Applicants: HD Project One LLC. Description: Baseline eTariff Filing: MBRA Tariff to be effective 6/9/2017. Filed Date: 6/8/17. Accession Number: 20170608–5120. Comments Due: 5 p.m. ET 6/29/17. Docket Numbers: ER17–1779–000. Applicants: The Connecticut Light and Power Company. Description: Notice of Cancellation of The Connecticut Light and Power Company Interconnection Service Agreement No. 101. Filed Date: 6/8/17. Accession Number: 20170608–5143. Comments Due: 5 p.m. ET 6/29/17. Docket Numbers: ER17–1780–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–06–09_SA 1677 Illinois PowerAmeren Amended GIA (G436 G983 G984) to be effective 5/25/2017. Filed Date: 6/9/17. Accession Number: 20170609–5039. Comments Due: 5 p.m. ET 6/30/17. Docket Numbers: ER17–1781–000. Applicants: ArcLight Energy Marketing, LLC. Description: Tariff Cancellation: Notice of Cancellation to be effective 6/30/2017. Filed Date: 6/9/17. Accession Number: 20170609–5054. Comments Due: 5 p.m. ET 6/30/17. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES17–34–000. Applicants: Central Maine Power Company. Description: Application of Central Maine Power Company for Authorization to Issue Short-Term Debt Under Section 204 of the Federal Power Act. Filed Date: 6/8/17. Accession Number: 20170608–5184. Comments Due: 5 p.m. ET 6/29/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Sep<11>2014 17:27 Jun 14, 2017 Jkt 241001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12390 Filed 6–14–17; 8:45 am] BILLING CODE 6717–01–P 27477 foot-long, 42-inch-diameter, natural gas transmission pipeline segment across the international boundary between the United States and Mexico that is under the Commission’s jurisdiction. The Border Crossing Project would connect the non-jurisdictional Valley Crossing System with the Mexican Marina Pipeline. The international boundary crossing would occur in Texas state waters, approximately 30 miles east of Brownsville, Texas. Background DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–19–000] Valley Crossing Pipeline, LLC; Notice of Schedule for Environmental Review of the Border Crossing Project On November 21, 2016, Valley Crossing Pipeline, LLC (Valley Crossing) filed an application in Docket No. CP17–19–000 pursuant to Section 3 of the Natural Gas Act seeking authorization and the issuance of a Presidential Permit to construct and operate certain natural gas transmission facilities for the purpose of exporting natural gas between the United States and Mexico. The proposed project is known as the Border Crossing Project (Project). The Project would deliver/ export up to 2.6 billion cubic feet per day of natural gas to Mexico to serve electrical generation plants. On December 2, 2016, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA June 30, 2017. 90-day Federal Authorization Decision Deadline September 28, 2017. If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Valley Crossing proposes to construct and operate an approximately 1,000- PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 On January 27, 2017, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Border Crossing Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to federal, state, and local government agencies; elected officials; and other interested parties. In response to the NOI, commenters expressed concerns regarding water quality, methane pollution, aquatic/marine life including threatened and endangered species, pipeline integrity, climate change, and cumulative impacts. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP17–19), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: June 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–12392 Filed 6–14–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\15JNN1.SGM 15JNN1

Agencies

[Federal Register Volume 82, Number 114 (Thursday, June 15, 2017)]
[Notices]
[Page 27477]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12392]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-19-000]


Valley Crossing Pipeline, LLC; Notice of Schedule for 
Environmental Review of the Border Crossing Project

    On November 21, 2016, Valley Crossing Pipeline, LLC (Valley 
Crossing) filed an application in Docket No. CP17-19-000 pursuant to 
Section 3 of the Natural Gas Act seeking authorization and the issuance 
of a Presidential Permit to construct and operate certain natural gas 
transmission facilities for the purpose of exporting natural gas 
between the United States and Mexico. The proposed project is known as 
the Border Crossing Project (Project). The Project would deliver/export 
up to 2.6 billion cubic feet per day of natural gas to Mexico to serve 
electrical generation plants.
    On December 2, 2016, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

    Issuance of EA June 30, 2017.
    90-day Federal Authorization Decision Deadline September 28, 2017.
    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    Valley Crossing proposes to construct and operate an approximately 
1,000-foot-long, 42-inch-diameter, natural gas transmission pipeline 
segment across the international boundary between the United States and 
Mexico that is under the Commission's jurisdiction. The Border Crossing 
Project would connect the non-jurisdictional Valley Crossing System 
with the Mexican Marina Pipeline. The international boundary crossing 
would occur in Texas state waters, approximately 30 miles east of 
Brownsville, Texas.

Background

    On January 27, 2017, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Border Crossing 
Project and Request for Comments on Environmental Issues (NOI). The NOI 
was sent to federal, state, and local government agencies; elected 
officials; and other interested parties. In response to the NOI, 
commenters expressed concerns regarding water quality, methane 
pollution, aquatic/marine life including threatened and endangered 
species, pipeline integrity, climate change, and cumulative impacts.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP17-19), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: June 9, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-12392 Filed 6-14-17; 8:45 am]
 BILLING CODE 6717-01-P