Valley Crossing Pipeline, LLC; Notice of Schedule for Environmental Review of the Border Crossing Project, 27477 [2017-12392]
Download as PDF
pmangrum on DSK3GDR082PROD with NOTICES
Federal Register / Vol. 82, No. 114 / Thursday, June 15, 2017 / Notices
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1778–000.
Applicants: HD Project One LLC.
Description: Baseline eTariff Filing:
MBRA Tariff to be effective 6/9/2017.
Filed Date: 6/8/17.
Accession Number: 20170608–5120.
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1779–000.
Applicants: The Connecticut Light
and Power Company.
Description: Notice of Cancellation of
The Connecticut Light and Power
Company Interconnection Service
Agreement No. 101.
Filed Date: 6/8/17.
Accession Number: 20170608–5143.
Comments Due: 5 p.m. ET 6/29/17.
Docket Numbers: ER17–1780–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–06–09_SA 1677 Illinois PowerAmeren Amended GIA (G436 G983
G984) to be effective 5/25/2017.
Filed Date: 6/9/17.
Accession Number: 20170609–5039.
Comments Due: 5 p.m. ET 6/30/17.
Docket Numbers: ER17–1781–000.
Applicants: ArcLight Energy
Marketing, LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
6/30/2017.
Filed Date: 6/9/17.
Accession Number: 20170609–5054.
Comments Due: 5 p.m. ET 6/30/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–34–000.
Applicants: Central Maine Power
Company.
Description: Application of Central
Maine Power Company for
Authorization to Issue Short-Term Debt
Under Section 204 of the Federal Power
Act.
Filed Date: 6/8/17.
Accession Number: 20170608–5184.
Comments Due: 5 p.m. ET 6/29/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
VerDate Sep<11>2014
17:27 Jun 14, 2017
Jkt 241001
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12390 Filed 6–14–17; 8:45 am]
BILLING CODE 6717–01–P
27477
foot-long, 42-inch-diameter, natural gas
transmission pipeline segment across
the international boundary between the
United States and Mexico that is under
the Commission’s jurisdiction. The
Border Crossing Project would connect
the non-jurisdictional Valley Crossing
System with the Mexican Marina
Pipeline. The international boundary
crossing would occur in Texas state
waters, approximately 30 miles east of
Brownsville, Texas.
Background
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–19–000]
Valley Crossing Pipeline, LLC; Notice
of Schedule for Environmental Review
of the Border Crossing Project
On November 21, 2016, Valley
Crossing Pipeline, LLC (Valley Crossing)
filed an application in Docket No.
CP17–19–000 pursuant to Section 3 of
the Natural Gas Act seeking
authorization and the issuance of a
Presidential Permit to construct and
operate certain natural gas transmission
facilities for the purpose of exporting
natural gas between the United States
and Mexico. The proposed project is
known as the Border Crossing Project
(Project). The Project would deliver/
export up to 2.6 billion cubic feet per
day of natural gas to Mexico to serve
electrical generation plants.
On December 2, 2016, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA June 30, 2017.
90-day Federal Authorization
Decision Deadline September 28,
2017.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Valley Crossing proposes to construct
and operate an approximately 1,000-
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
On January 27, 2017, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Border Crossing Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to federal, state, and local
government agencies; elected officials;
and other interested parties. In response
to the NOI, commenters expressed
concerns regarding water quality,
methane pollution, aquatic/marine life
including threatened and endangered
species, pipeline integrity, climate
change, and cumulative impacts.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP17–19), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: June 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–12392 Filed 6–14–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15JNN1.SGM
15JNN1
Agencies
[Federal Register Volume 82, Number 114 (Thursday, June 15, 2017)]
[Notices]
[Page 27477]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-12392]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-19-000]
Valley Crossing Pipeline, LLC; Notice of Schedule for
Environmental Review of the Border Crossing Project
On November 21, 2016, Valley Crossing Pipeline, LLC (Valley
Crossing) filed an application in Docket No. CP17-19-000 pursuant to
Section 3 of the Natural Gas Act seeking authorization and the issuance
of a Presidential Permit to construct and operate certain natural gas
transmission facilities for the purpose of exporting natural gas
between the United States and Mexico. The proposed project is known as
the Border Crossing Project (Project). The Project would deliver/export
up to 2.6 billion cubic feet per day of natural gas to Mexico to serve
electrical generation plants.
On December 2, 2016, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA June 30, 2017.
90-day Federal Authorization Decision Deadline September 28, 2017.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Valley Crossing proposes to construct and operate an approximately
1,000-foot-long, 42-inch-diameter, natural gas transmission pipeline
segment across the international boundary between the United States and
Mexico that is under the Commission's jurisdiction. The Border Crossing
Project would connect the non-jurisdictional Valley Crossing System
with the Mexican Marina Pipeline. The international boundary crossing
would occur in Texas state waters, approximately 30 miles east of
Brownsville, Texas.
Background
On January 27, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Border Crossing
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to federal, state, and local government agencies; elected
officials; and other interested parties. In response to the NOI,
commenters expressed concerns regarding water quality, methane
pollution, aquatic/marine life including threatened and endangered
species, pipeline integrity, climate change, and cumulative impacts.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP17-19), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
Dated: June 9, 2017.
Kimberly D. Bose,
Secretary.