Madison Paper Industries, Brookfield White Pine Hydro LLC, Merimil Limited Partnership, Brassua Hydroelectric Limited Partnership, Eagle Creek Kennebec Hydro, LLC; Notice of Application for Partial Transfer of License, Substitution of Relicense Applicant, and Soliciting Comments, Motions To Intervene, and Protests, 26676-26677 [2017-11921]
Download as PDF
26676
Federal Register / Vol. 82, No. 109 / Thursday, June 8, 2017 / Notices
in a volume equivalent to approximately
657.5 Bcf/yr of natural gas for a term of
20 years to commence on the earlier of
the date of first commercial export or
seven years from the date that the Order
is issued.
Concurrently with this Record of
Decision, DOE/FE is issuing Order No.
4028, in which it finds that the
requested authorization has not been
shown to be inconsistent with the
public interest, and that the Application
should be granted subject to compliance
with the terms and conditions set forth
in the Order, including all terms and
conditions described by MARAD in its
ROD and/or imposed in MARAD’s
forthcoming deepwater port license for
Delfin. Additionally, DOE/FE’s
authorization is conditioned on Delfin’s
receipt of all connected local, state, and
federal permits (including FERC’s
authorization under Section 7 of the
Natural Gas Act for the Delfin Onshore
Facility), and on Delfin’s on-going
compliance with any other preventative
and mitigative measures imposed by
other federal or state agencies.
Floodplain Statement of Findings
DOE prepared this Floodplain
Statement of Findings in accordance
with DOE’s regulations, entitled
‘‘Compliance with Floodplain and
Wetland Environmental Review
Requirements’’ (10 CFR part 1022). The
required floodplain assessment was
conducted during development and
preparation of the EIS (see Sections
4.11.1 of the EIS). The EIS determined
that the proposed Delfin Onshore
Facility site is classified as having a 1percent-annual-chance of flooding.
While the placement of these facilities
within floodplains would be
unavoidable, DOE has determined that
the current design for the Delfin
Liquefaction Project minimizes
potential harm to or in the floodplain to
the extent practicable.
Issued in Washington, DC, on June 1, 2017.
Jarad Daniels,
Acting Assistant Secretary, Office of Fossil
Energy.
[FR Doc. 2017–11907 Filed 6–7–17; 8:45 am]
BILLING CODE 6450–01–P
Basis of Decision
DEPARTMENT OF ENERGY
DOE’s decision is based upon the
analysis of potential environmental
impacts presented in the EIS, and DOE’s
determination in Order No. 4028 that it
has not been shown that Delfin’s
proposed exports will be inconsistent
with the public interest, as is required
to deny Delfin’s Application under NGA
section 3(a). Although not required by
NEPA, DOE/FE also considered the
Addendum, which summarizes
available information on potential
upstream impacts associated with
unconventional natural gas activities,
such as hydraulic fracturing.
Federal Energy Regulatory
Commission
asabaliauskas on DSKBBXCHB2PROD with NOTICES
Mitigation
As a condition of its decision to issue
Order No. 4028, DOE is imposing
requirements that will avoid or
minimize the environmental impacts of
the proposed Liquefaction Facility.
These conditions include the Best
Management Practices, mitigation
measures, and conditions in the
MARAD ROD and forthcoming
deepwater port license. Mitigation
measures beyond those included in
Order No. 4028 that are enforceable by
other Federal and state agencies are
additional conditions of Order No. 4028.
With these conditions, DOE/FE has
determined that all practicable means to
avoid or minimize environmental harm
from the Delfin Liquefaction Project
have been adopted.
VerDate Sep<11>2014
17:24 Jun 07, 2017
Jkt 241001
Dated: June 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11922 Filed 6–7–17; 8:45 am]
[Docket No. RM15–11–001]
BILLING CODE 6717–01–P
Reliability Standard for Transmission
System Planned Performance for
Geomagnetic Disturbance Events;
Notice of Filing
Take notice that on May 30, 2017, the
North American Electric Reliability
Corporation submitted a preliminary
work plan to conduct research on topics
related to geomagnetic disturbances and
their impacts on the reliability of the
Bulk-Power System, pursuant to Order
No. 830.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
1 Order No. 830, Reliability Standard for
Transmission System Planned Performance for
Geomagnetic Disturbance Events, 156 FERC
¶ 61,215 (2016), reh’g denied, Order No. 830–A, 158
FERC ¶ 61,041 (2017) (‘‘Order No. 830’’).
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 23, 2017.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2615–044]
Madison Paper Industries, Brookfield
White Pine Hydro LLC, Merimil Limited
Partnership, Brassua Hydroelectric
Limited Partnership, Eagle Creek
Kennebec Hydro, LLC; Notice of
Application for Partial Transfer of
License, Substitution of Relicense
Applicant, and Soliciting Comments,
Motions To Intervene, and Protests
On May 8, 2017, Madison Paper
Industries (MPI), Brookfield White Pine
Hydro LLC (Brookfield), Merimil
Limited Partnership (Merimil), Brassua
Hydroelectric Limited Partnership
(Brassua Partnership) (transferors/colicensees) and Eagle Creek Kennebec
Hydro, LLC (transferee/Eagle Creek)
filed a joint application for: (1) Partial
transfer of license for the Brassua
Storage Project, FERC No. 2615, located
on the Moose River in Somerset County,
Maine and (2) substitution of Eagle
Creek for MPI as the applicant in the
pending application for a new license
E:\FR\FM\08JNN1.SGM
08JNN1
Federal Register / Vol. 82, No. 109 / Thursday, June 8, 2017 / Notices
asabaliauskas on DSKBBXCHB2PROD with NOTICES
filed by the transferors for Project No.
2615–037.
Applicant Contact: For Transferors:
For MPI: Mr. Matthew D. Manahan,
Esq., Pierce Atwood LLP, Merrill’s
Wharf, 254 Commercial Street, Portland,
ME 04101, Phone: 207–791–1189,
Email: mmanahan@PierceAtwood.com;
For Brookfield, Merimil and Brassua
Partnership: Mr. John A. Whittaker IV,
Winston & Strawn LLP, 1700 K Street
NW., Washington, DC 20006–5100,
Phone 202–282–5766, Email: jwhittak@
winaton.com; and Mr. Alexander M.
Wilson, Brookfield Renewable, 41
Victoria Street, Gatineau, QC J8X2A1,
Phone: 819–561–8679, Email:
alexander.wilson@
brookfieldrenewable.com.
For Transferee: For Eagle Creek: Mr.
Donald H. Clark and Mr. Joshua E.
Adrian, Duncan, Weinberg, Genzer &
Pembroke, P.C., 1615 M Street NW.,
Washington, DC 20036, Emails: dhc@
dwgp.com and jea@dwgp.com.
FERC Contact: Patricia W. Gillis,
Phone: (202) 502–8735, Email:
patricia.gillis@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the issuance date of this notice, by the
Commission. The Commission strongly
encourages electronic filing. Please file
motions to intervene, comments, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2615–044.
Dated: June 2, 2017.
Kimberly D. Bose
Secretary.
[FR Doc. 2017–11921 Filed 6–7–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:24 Jun 07, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–126–000.
Applicants: South Central MCN LLC.
Description: Application of South
Central MCN LLC for Authorization to
Acquire Transmission Facilities
Pursuant to Section 203 of the Federal
Power Act, et al.
Filed Date: 6/1/17.
Accession Number: 20170601–5324.
Comments Due: 5 p.m. ET 6/22/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–113–000.
Applicants: Algonquin Power Sanger
LLC.
Description: Algonquin Power Sanger
LLC Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 5/31/17.
Accession Number: 20170531–5377.
Comments Due: 5 p.m. ET 6/21/17.
Docket Numbers: EG17–114–000.
Applicants: Hattiesburg Farm, LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Hattiesburg Farm, LLC.
Filed Date: 5/31/17.
Accession Number: 20170531–5378.
Comments Due: 5 p.m. ET 6/21/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–1736–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2017–
06–01_Compliance filing to implement
Cost Recovery Mechanism Settlement to
be effective 1/29/2014.
Filed Date: 6/1/17.
Accession Number: 20170601–5249.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1347–001.
Applicants: PacifiCorp.
Description: Compliance filing: OATT
Revised Attachment H–1 (Rev
Depreciation Rates 2017) Compliance to
be effective 6/1/2017.
Filed Date: 5/31/17.
Accession Number: 20170531–5319.
Comments Due: 5 p.m. ET 6/21/17.
Docket Numbers: ER17–1433–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Amendment to Compliance Filing in
Docket No. ER17–1433–000 to be
effective 1/19/2017.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
26677
Filed Date: 6/2/17.
Accession Number: 20170602–5042.
Comments Due: 5 p.m. ET 6/23/17.
Docket Numbers: ER17–1739–000.
Applicants: Pennsylvania Windfarms,
LLC.
Description: Tariff Cancellation:
Pennsylvania Windfarms, LLC Notice of
Cancellation of Market-Based Rate Tariff
to be effective 6/2/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5250.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1740–000.
Applicants: Pennsylvania Windfarms,
LLC.
Description: Tariff Cancellation:
Pennsylvania Windfarms, LLC Notice of
Cancellation of CFA to be effective 6/2/
2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5251.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1741–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Central Nebraska Public Power and
Irrigation District Stated Rate Revisions
to be effective 12/31/9998.
Filed Date: 6/1/17.
Accession Number: 20170601–5252.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1742–000.
Applicants: Hattiesburg Farm, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff to be effective
6/6/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5273.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1743–000.
Applicants: Doswell Limited
Partnership.
Description: § 205(d) Rate Filing:
Reactive Power Tariff Filing to be
effective 7/1/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5281.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1744–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: June
2017 Membership Filing to be effective
5/1/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5288.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1745–000.
Applicants: Public Service Company
of New Mexico.
Description: Initial rate filing:
Executed Transmission Agreement
between PNM and Avangrid
Renewables, LLC to be effective 6/1/
2017.
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 82, Number 109 (Thursday, June 8, 2017)]
[Notices]
[Pages 26676-26677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11921]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2615-044]
Madison Paper Industries, Brookfield White Pine Hydro LLC,
Merimil Limited Partnership, Brassua Hydroelectric Limited Partnership,
Eagle Creek Kennebec Hydro, LLC; Notice of Application for Partial
Transfer of License, Substitution of Relicense Applicant, and
Soliciting Comments, Motions To Intervene, and Protests
On May 8, 2017, Madison Paper Industries (MPI), Brookfield White
Pine Hydro LLC (Brookfield), Merimil Limited Partnership (Merimil),
Brassua Hydroelectric Limited Partnership (Brassua Partnership)
(transferors/co-licensees) and Eagle Creek Kennebec Hydro, LLC
(transferee/Eagle Creek) filed a joint application for: (1) Partial
transfer of license for the Brassua Storage Project, FERC No. 2615,
located on the Moose River in Somerset County, Maine and (2)
substitution of Eagle Creek for MPI as the applicant in the pending
application for a new license
[[Page 26677]]
filed by the transferors for Project No. 2615-037.
Applicant Contact: For Transferors: For MPI: Mr. Matthew D.
Manahan, Esq., Pierce Atwood LLP, Merrill's Wharf, 254 Commercial
Street, Portland, ME 04101, Phone: 207-791-1189, Email:
mmanahan@PierceAtwood.com; For Brookfield, Merimil and Brassua
Partnership: Mr. John A. Whittaker IV, Winston & Strawn LLP, 1700 K
Street NW., Washington, DC 20006-5100, Phone 202-282-5766, Email:
jwhittak@winaton.com; and Mr. Alexander M. Wilson, Brookfield
Renewable, 41 Victoria Street, Gatineau, QC J8X2A1, Phone: 819-561-
8679, Email: alexander.wilson@brookfieldrenewable.com.
For Transferee: For Eagle Creek: Mr. Donald H. Clark and Mr. Joshua
E. Adrian, Duncan, Weinberg, Genzer & Pembroke, P.C., 1615 M Street
NW., Washington, DC 20036, Emails: dhc@dwgp.com and jea@dwgp.com.
FERC Contact: Patricia W. Gillis, Phone: (202) 502-8735, Email:
patricia.gillis@ferc.gov.
Deadline for filing comments, motions to intervene, and protests:
30 days from the issuance date of this notice, by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, comments, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-2615-044.
Dated: June 2, 2017.
Kimberly D. Bose
Secretary.
[FR Doc. 2017-11921 Filed 6-7-17; 8:45 am]
BILLING CODE 6717-01-P