Moomaws Dam Hydroelectric Corporation, Columbia Mills Hydroelectric Limited Partnership; Notice of Transfer of Exemption, 26476 [2017-11763]

Download as PDF 26476 Federal Register / Vol. 82, No. 108 / Wednesday, June 7, 2017 / Notices Location: Ukiah Valley Conference Center, 200 South School Street, Ukiah, CA. Phone: (707) 463–6700. the PAD and SD1 are provided in item n. of this document. Evening Scoping Meeting The meetings will be recorded by a stenographer and will be placed in the public record for this project. Meeting Procedures Date: Wednesday, June 28, 2017 Time: 6:00 p.m. Location: Ukiah Valley Conference Center, 200 South School Street, Ukiah, CA. Phone: (707) 463–6700 SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. Environmental Site Review The potential applicant and Commission staff will conduct an Environmental Site Review (site visit) of the project on Tuesday, June 27, 2017. Participants are responsible for their own transportation. Persons planning on participating in the site visit must RSVP to Ms. Susan Kester of PG&E at S1KV@pge.com (preferably) or (415) 973–7202, on or before June 13, 2017. Additional details concerning the site visit are provided in SD1. sradovich on DSK3GMQ082PROD with NOTICES Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of VerDate Sep<11>2014 16:37 Jun 06, 2017 Jkt 241001 Dated: June 1, 2017. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC17–4–000] Commission Information Collection Activities (FERC–521); Comment Request Federal Energy Regulatory Commission, Department of Energy. ACTION: Comment request. AGENCY: [FR Doc. 2017–11761 Filed 6–6–17; 8:45 am] BILLING CODE 6717–01–P The Federal Energy Regulatory Commission (Commission or FERC) previously issued a 60-day Notice in the Federal Register requesting public comments on FERC– 521 (Payments for Benefits from Headwater Improvements). The Commission received no comments. In compliance with the requirements of the Paperwork Reduction Act of 1995, the Commission is submitting the FERC–521 to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. DATES: Comments on FERC–521 are due by July 7, 2017. ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 1902–0087, should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395–0710. A copy of the comments should also be sent to the Federal Energy Regulatory Commission, identified by the Docket No. IC17–4–000, by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading SUMMARY: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8005–006] Moomaws Dam Hydroelectric Corporation, Columbia Mills Hydroelectric Limited Partnership; Notice of Transfer of Exemption 1. By letter filed April 26, 2017, Moomaws Dam Hydroelectric Corporation informed the Commission that the exemption from licensing for the Moomaws Dam Hydroelectric Project No. 8005, originally issued June 21, 1984 1 has been transferred to the Columbia Mills Hydroelectric Limited Partnership. The project is located on the Maury River in Rockbridge County, Virginia. The transfer of an exemption does not require Commission approval. 2. Columbia Mills Hydroelectric Limited Partnership is now the exemptee of the Moomaws Dam Hydroelectric Project No. 8005. All correspondence should be forwarded to: Mr. Gregory Cloutier, President and Mr. William Allin, Vice President, Columbia Mills Hydroelectric Limited Partnership, c/o Powerhouse Systems, Inc., 80A Elm Street, Lancaster, NH 03584, Phone: 603–443–7610, Email: watrpwr@gmail.com. Dated: June 1, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–11763 Filed 6–6–17; 8:45 am] BILLING CODE 6717–01–P 1 Order Granting Exemption from Licensing of a Small Project of 5 Megawatts or Less. Rockfish Corporation, Inc., 27 FERC ¶ 62,331 (1984). PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\07JNN1.SGM 07JNN1

Agencies

[Federal Register Volume 82, Number 108 (Wednesday, June 7, 2017)]
[Notices]
[Page 26476]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11763]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8005-006]


Moomaws Dam Hydroelectric Corporation, Columbia Mills 
Hydroelectric Limited Partnership; Notice of Transfer of Exemption

    1. By letter filed April 26, 2017, Moomaws Dam Hydroelectric 
Corporation informed the Commission that the exemption from licensing 
for the Moomaws Dam Hydroelectric Project No. 8005, originally issued 
June 21, 1984 \1\ has been transferred to the Columbia Mills 
Hydroelectric Limited Partnership. The project is located on the Maury 
River in Rockbridge County, Virginia. The transfer of an exemption does 
not require Commission approval.
---------------------------------------------------------------------------

    \1\ Order Granting Exemption from Licensing of a Small Project 
of 5 Megawatts or Less. Rockfish Corporation, Inc., 27 FERC ] 62,331 
(1984).
---------------------------------------------------------------------------

    2. Columbia Mills Hydroelectric Limited Partnership is now the 
exemptee of the Moomaws Dam Hydroelectric Project No. 8005. All 
correspondence should be forwarded to: Mr. Gregory Cloutier, President 
and Mr. William Allin, Vice President, Columbia Mills Hydroelectric 
Limited Partnership, c/o Powerhouse Systems, Inc., 80A Elm Street, 
Lancaster, NH 03584, Phone: 603-443-7610, Email: watrpwr@gmail.com.

    Dated: June 1, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-11763 Filed 6-6-17; 8:45 am]