Aspinook Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 26479-26480 [2017-11762]
Download as PDF
Federal Register / Vol. 82, No. 108 / Wednesday, June 7, 2017 / Notices
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and five copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time June 22, 2017.
Dated: June 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11758 Filed 6–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1732–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–06–01_Asset Registration Process
Clean-up filing to be effective 8/1/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5119.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1733–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AE Revisions Regarding
JOUs Registered Under Combined
Resource Option to be effective 8/1/
2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5124.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1735–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination of Silicon Valley
Power IA (SA 20) to be effective 7/31/
2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5169.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1737–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ICSA No.
VerDate Sep<11>2014
16:37 Jun 06, 2017
Jkt 241001
3884; Queue No. X4–039 to be effective
5/30/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5205.
Comments Due: 5 p.m. ET 6/22/17.
Docket Numbers: ER17–1738–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Notice of Cancellation of Dairyland
Interconnection and Interchange
Agreement to be effective 7/30/2017.
Filed Date: 6/1/17.
Accession Number: 20170601–5221.
Comments Due: 5 p.m. ET 6/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11756 Filed 6–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3472–023]
Aspinook Hydro, LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document, Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3472–023.
c. Date Filed: April 27, 2017.
d. Submitted By: Aspinook Hydro,
LLC (a subsidiary of Gravity
Renewables, Inc.).
e. Name of Project: Wyre Wynd
Hydroelectric Project.
f. Location: On the Quinebaug River,
in New London and Windham Counties,
Connecticut. No federal lands are
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
26479
occupied by the project works or are
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Jonathan Miller, Aspinook Hydro, LLC,
c/o Gravity Renewables, Inc., 1401
Walnut St., Suite 220, Boulder, CO
80302; (303) 440–3378; email—
jonathan@gravityrenewables.com.
i. FERC Contact: John Ramer at (202)
502–8969; or email at john.ramer@
ferc.gov.
j. Aspinook Hydro, LLC filed a request
to use the Traditional Licensing Process
on April 27, 2017, and provided public
notice of the request on May 6, 2017. In
a letter dated June 1, 2017, the Director
of the Division of Hydropower
Licensing approved the request to use
the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
(New Hampshire and Maine) State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Aspinook Hydro, LLC as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Aspinook Hydro, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
E:\FR\FM\07JNN1.SGM
07JNN1
26480
Federal Register / Vol. 82, No. 108 / Wednesday, June 7, 2017 / Notices
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3472–023.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 30, 2020.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11762 Filed 6–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14827–000]
sradovich on DSK3GMQ082PROD with NOTICES
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Lookout Pumped Storage
Hydroelectric Project to be located in
Somerset County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 44 acres and a
storage capacity of 660 acre-feet at a
surface elevation of approximately 2,850
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam
and/or dike; (2) excavating a new lower
reservoir with a surface area of 30 acres
and a total storage capacity of 792 acrefeet at a surface elevation of 2,200 feet
VerDate Sep<11>2014
16:37 Jun 06, 2017
Jkt 241001
msl; (3) a new 3,500-foot-long, 48-inchdiameter penstock connecting the upper
and lower reservoirs; (4) a new 150-footlong, 50-foot-wide powerhouse
containing two turbine-generator units
with a total rated capacity of 35
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point at the
Lookout Wind Farm; and (6)
appurtenant facilities. Possible initial
fill water and make-up water would
come from the nearby Wills Creek,
including groundwater. The proposed
project would have an annual
generation of 128,372 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14827–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14827) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11765 Filed 6–6–17; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–028–000]
National Fuel Gas Supply Corporation;
Notice of Availability of the
Environmental Assessment for the
Proposed Line QP, Line Q, and Queen
Storage Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Line QP, Line Q, and Queen Storage
Project (Project), proposed by National
Fuel Gas Supply Corporation (National
Fuel) in the above-referenced docket.
National Fuel requests authorization to
construct and operate facilities in Forest
and Warren Counties, Pennsylvania.
National Fuel would abandon capacity
by sale a natural gas storage system and
associated pipeline that is no longer
needed by the company and would
provide that capacity to other gathering
system suppliers in Pennsylvania.
Additionally, National Fuel proposes to
replace a compromised portion of the
pipeline associated with the storage
system and install new pipeline to
maintain National Fuel’s distribution
capability.
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The United States Army Corps of
Engineers, United States Department of
Agriculture-Forest Service (USDA–FS),
and the Pennsylvania Fish and Boat
Commission participated as cooperating
agencies in the preparation of the EA.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis. The USDA–FS may adopt and
use the EA to consider the issuance of
a special use permit for the portion of
the project on USDA–FS lands.
The Project includes the following
facilities:
• Abandon by sale the existing Queen
Storage Field and Queen Compressor
Station, property interests related
thereto, and approximately 5.5 miles of
the 6-inch-diameter natural gas
transmission pipeline (Line Q) from
E:\FR\FM\07JNN1.SGM
07JNN1
Agencies
[Federal Register Volume 82, Number 108 (Wednesday, June 7, 2017)]
[Notices]
[Pages 26479-26480]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11762]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3472-023]
Aspinook Hydro, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 3472-023.
c. Date Filed: April 27, 2017.
d. Submitted By: Aspinook Hydro, LLC (a subsidiary of Gravity
Renewables, Inc.).
e. Name of Project: Wyre Wynd Hydroelectric Project.
f. Location: On the Quinebaug River, in New London and Windham
Counties, Connecticut. No federal lands are occupied by the project
works or are located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Jonathan Miller, Aspinook Hydro,
LLC, c/o Gravity Renewables, Inc., 1401 Walnut St., Suite 220, Boulder,
CO 80302; (303) 440-3378; email_jonathan@gravityrenewables.com.
i. FERC Contact: John Ramer at (202) 502-8969; or email at
john.ramer@ferc.gov.
j. Aspinook Hydro, LLC filed a request to use the Traditional
Licensing Process on April 27, 2017, and provided public notice of the
request on May 6, 2017. In a letter dated June 1, 2017, the Director of
the Division of Hydropower Licensing approved the request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the (New Hampshire and Maine) State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Aspinook Hydro, LLC as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. Aspinook Hydro, LLC filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for
[[Page 26480]]
inspection and reproduction at the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 3472-023. Pursuant to 18
CFR 16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by April 30,
2020.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: June 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-11762 Filed 6-6-17; 8:45 am]