Combined Notice of Filings, 26082-26083 [2017-11662]
Download as PDF
26082
Federal Register / Vol. 82, No. 107 / Tuesday, June 6, 2017 / Notices
Comments filed with OMB,
identified by the OMB Control No.
1902–0087, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–0710.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission, identified by the Docket
No. IC17–4–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
ADDRESSES:
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–521, Payments for
Benefits from Headwater Improvements.
OMB Control No.: 1902–0087.
Type of Request: Three-year extension
of the FERC–521 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The information collected
under the requirements of FERC–521 is
used by the Commission to implement
the statutory provisions of Section 10(f)
of the Federal Power Act (FPA).1 The
FPA authorizes the Commission to
determine headwater benefits received
by downstream hydropower project
owners. Headwater benefits are the
additional energy production possible at
a downstream hydropower project
resulting from the regulation of river
flows by an upstream storage reservoir.
When the Commission completes a
study of a river basin, it determines
headwater benefits charges that will be
apportioned among the various
downstream beneficiaries. A headwater
benefits charge and the cost incurred by
the Commission to complete an
evaluation are paid by downstream
hydropower project owners. In essence,
the owners of non-federal hydropower
projects that directly benefit from a
headwater improvement must pay an
equitable portion of the annual charges
for interest, maintenance, and
depreciation of the headwater project to
the U.S. Treasury. The regulations
provide for apportionment of these costs
between the headwater project and
downstream projects based on
downstream energy gains and propose
equitable apportionment methodology
that can be applied to all river basins in
which headwater improvements are
built. The Commission requires owners
of non-federal hydropower projects to
file data for determining annual charges
as outlined in 18 Code of Federal
Regulations (CFR) part 11.
Type of Respondents: There are two
types of entities that respond, Federal
and Non-Federal hydropower project
owners. The Federal entities that
typically respond are the U.S. Army
Corps of Engineers and the U.S.
Department of Interior Bureau of
Reclamation. The Non-Federal entities
may consist of any Municipal or NonMunicipal hydropower project owner.
Estimate of Annual Burden: 2 The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC–521—PAYMENTS FOR BENEFITS FROM HEADWATER IMPROVEMENTS
Number of
respondents
Annual
number of
responses
per
respondent
Total number of
responses
Average burden &
cost per
response
Total annual burden
hours and total annual
cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
3
1
3
40 hrs.; $3,060 .....
120 hrs.; $9,180 ........
$3,060
Total cost .................................................................
mstockstill on DSK30JT082PROD with NOTICES
Federal and Non-Federal hydropower project owners ..
....................
....................
............................
...............................
120 hrs.; $9,180 ........
3,060
The total estimated annual cost
burden to respondents is $9,180 [120
hrs. * $76.50/hour 3 = $9,180].
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
1 16
U.S.C. 803.
is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
2 ‘‘Burden’’
VerDate Sep<11>2014
20:52 Jun 05, 2017
Jkt 241001
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11663 Filed 6–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR17–44–000.
Applicants: Hope Gas, Inc.
Description: Tariff filing per
284.123(b),(e)+(g): HGI—Trade Name
of what is included in the information collection
burden, refer to Title 5 Code of Federal Regulations
1320.3.
3 Commission staff thinks that respondents to this
collection are similarly compensated in terms of
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
salary and benefits. $76.50/hour is the average
FERC employee hourly salary plus benefits for
2017.
E:\FR\FM\06JNN1.SGM
06JNN1
mstockstill on DSK30JT082PROD with NOTICES
Federal Register / Vol. 82, No. 107 / Tuesday, June 6, 2017 / Notices
Amendment to be effective 5/16/2017;
Filing Type: 1300.
Filed Date: 5/23/17.
Accession Number: 201705235073.
Comments Due: 5 p.m. ET 6/13/17.
284.123(g) Protests Due: 5 p.m. ET
7/24/17.
Docket Numbers: RP17–754–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: Midcontinent Express
Pipeline LLC submits tariff filing per
154.204: Tariff Update Filing May 2017
to be effective 7/1/2017.
Filed Date: 05/23/2017.
Accession Number: 20170523–5038.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–755–000.
Applicants: White River Hub, LLC.
Description: Annual Report of Fuel
Gas Reimbursement Percentage for 2017
of White River Hub, LLC.
Filed Date: 05/23/2017.
Accession Number: 20170523–5125.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–756–000.
Applicants: Questar Southern Trails
Pipeline Company.
Description: Annual Report of Fuel
Gas Reimbursement Percentage for 2017
of Questar Southern Trails Pipeline
Company.
Filed Date: 05/23/2017.
Accession Number: 20170523–5126.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–757–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Iroquois Gas
Transmission System, L.P. submits tariff
filing per 154.204: 05/23/17 Negotiated
Rates—Sequent Energy Management
(HUB) 3075–89 to be effective 5/23/
2017.
Filed Date: 05/23/2017.
Accession Number: 20170523–5143.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–758–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Iroquois Gas
Transmission System, L.P. submits tariff
filing per 154.204: 05/23/17 Negotiated
Rates—Mercuria Energy America, Inc.
(HUB) 7540–89 to be effective 5/23/
2017.
Filed Date: 05/23/2017.
Accession Number: 20170523–5144.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–759–000.
Applicants: Elba Express Company,
L.L.C.
VerDate Sep<11>2014
20:52 Jun 05, 2017
Jkt 241001
Description: Elba Express Company,
L.L.C. submits tariff filing per 154.203:
Annual Cashout True-up 2017.
Filed Date: 05/24/2017.
Accession Number: 20170524–5049.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–760–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: El Paso Natural Gas
Company, L.L.C. submits tariff filing per
154.601: Negotiated Rate Agreement
Update (APS June 2017) to be effective
6/1/2017 under.
Filed Date: 05/24/2017.
Accession Number: 20170524–5088.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–761–000.
Applicants: Transcontinental Gas
Pipe Line Company,
Description: Transcontinental Gas
Pipe Line Company, LLC submits tariff
filing per 154.403: Rate Schedules LSS
and SS–2 Tracker—Eff. 06/01/2017 to be
effective 6/1/2017.
Filed Date: 05/24/2017.
Accession Number: 20170524–5151.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–762–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Tallgrass Interstate Gas
Transmission, LLC submits tariff filing
per 154.204: TIGT PAWS FILING to be
effective 7/1/2017.
Filed Date: 05/24/2017.
Accession Number: 20170524–5175.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
Docket Numbers: RP17–763–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Penalty Charge
Reconciliation Filing of Tallgrass
Interstate Gas Transmission, LLC.
Filed Date: 05/24/2017.
Accession Number: 20170524–5204.
Comment Date: 5:00 p.m. Eastern
Time on Monday, June 05, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
26083
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11662 Filed 6–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2124–016.
Applicants: Spring Canyon Energy
LLC.
Description: Supplement to December
23, 2016 Triennial Report of Spring
Canyon Energy LLC.
Filed Date: 5/30/17.
Accession Number: 20170530–5318.
Comments Due: 5 p.m. ET 6/20/17.
Docket Numbers: ER10–2125–017.
Applicants: Judith Gap Energy LLC.
Description: Supplement to December
23, 2016 Triennial Report of Judith Gap
Energy LLC.
Filed Date: 5/30/17.
Accession Number: 20170530–5319.
Comments Due: 5 p.m. ET 6/20/17.
Docket Numbers: ER10–2128–016.
Applicants: Wolverine Creek Energy
LLC.
Description: Supplement to December
23, 2016 Triennial Report for Wolverine
Creek Energy LLC.
Filed Date: 5/30/17.
Accession Number: 20170530–5317.
Comments Due: 5 p.m. ET 6/20/17.
Docket Numbers: ER10–2129–012.
Applicants: Grays Harbor Energy LLC.
Description: Supplement to December
23, 2016 Triennial Report of Grays
Harbor Energy LLC.
Filed Date: 5/30/17.
Accession Number: 20170530–5320.
Comments Due: 5 p.m. ET 6/20/17.
Docket Numbers: ER10–2132–016.
Applicants: Willow Creek Energy
LLC.
Description: Supplement to December
23, 2016 Triennial Report of Willow
Creek Energy LLC.
Filed Date: 5/30/17.
Accession Number: 20170530–5321.
Comments Due: 5 p.m. ET 6/20/17.
Docket Numbers: ER10–2135–012.
Applicants: Spindle Hill Energy LLC.
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 82, Number 107 (Tuesday, June 6, 2017)]
[Notices]
[Pages 26082-26083]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11662]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR17-44-000.
Applicants: Hope Gas, Inc.
Description: Tariff filing per 284.123(b),(e)+(g): HGI--Trade Name
[[Page 26083]]
Amendment to be effective 5/16/2017; Filing Type: 1300.
Filed Date: 5/23/17.
Accession Number: 201705235073.
Comments Due: 5 p.m. ET 6/13/17.
284.123(g) Protests Due: 5 p.m. ET 7/24/17.
Docket Numbers: RP17-754-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Midcontinent Express Pipeline LLC submits tariff
filing per 154.204: Tariff Update Filing May 2017 to be effective 7/1/
2017.
Filed Date: 05/23/2017.
Accession Number: 20170523-5038.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-755-000.
Applicants: White River Hub, LLC.
Description: Annual Report of Fuel Gas Reimbursement Percentage for
2017 of White River Hub, LLC.
Filed Date: 05/23/2017.
Accession Number: 20170523-5125.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-756-000.
Applicants: Questar Southern Trails Pipeline Company.
Description: Annual Report of Fuel Gas Reimbursement Percentage for
2017 of Questar Southern Trails Pipeline Company.
Filed Date: 05/23/2017.
Accession Number: 20170523-5126.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-757-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Iroquois Gas Transmission System, L.P. submits tariff
filing per 154.204: 05/23/17 Negotiated Rates--Sequent Energy
Management (HUB) 3075-89 to be effective 5/23/2017.
Filed Date: 05/23/2017.
Accession Number: 20170523-5143.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-758-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Iroquois Gas Transmission System, L.P. submits tariff
filing per 154.204: 05/23/17 Negotiated Rates--Mercuria Energy America,
Inc. (HUB) 7540-89 to be effective 5/23/2017.
Filed Date: 05/23/2017.
Accession Number: 20170523-5144.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-759-000.
Applicants: Elba Express Company, L.L.C.
Description: Elba Express Company, L.L.C. submits tariff filing per
154.203: Annual Cashout True-up 2017.
Filed Date: 05/24/2017.
Accession Number: 20170524-5049.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-760-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: El Paso Natural Gas Company, L.L.C. submits tariff
filing per 154.601: Negotiated Rate Agreement Update (APS June 2017) to
be effective 6/1/2017 under.
Filed Date: 05/24/2017.
Accession Number: 20170524-5088.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-761-000.
Applicants: Transcontinental Gas Pipe Line Company,
Description: Transcontinental Gas Pipe Line Company, LLC submits
tariff filing per 154.403: Rate Schedules LSS and SS-2 Tracker--Eff.
06/01/2017 to be effective 6/1/2017.
Filed Date: 05/24/2017.
Accession Number: 20170524-5151.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-762-000.
Applicants: Tallgrass Interstate Gas Transmission, L.
Description: Tallgrass Interstate Gas Transmission, LLC submits
tariff filing per 154.204: TIGT PAWS FILING to be effective 7/1/2017.
Filed Date: 05/24/2017.
Accession Number: 20170524-5175.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
Docket Numbers: RP17-763-000.
Applicants: Tallgrass Interstate Gas Transmission, L.
Description: Penalty Charge Reconciliation Filing of Tallgrass
Interstate Gas Transmission, LLC.
Filed Date: 05/24/2017.
Accession Number: 20170524-5204.
Comment Date: 5:00 p.m. Eastern Time on Monday, June 05, 2017.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified date(s). Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-11662 Filed 6-5-17; 8:45 am]
BILLING CODE 6717-01-P