Northwest Pipeline LLC; Notice of Application, 25283-25284 [2017-11271]
Download as PDF
Federal Register / Vol. 82, No. 104 / Thursday, June 1, 2017 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[Docket No. ER17–1671–000]
mstockstill on DSK30JT082PROD with NOTICES
Gulf Coast Solar Center II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2017–11272 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Gulf
Coast Solar Center II, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 14,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate Sep<11>2014
18:32 May 31, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–441–000]
Northwest Pipeline LLC; Notice of
Application
Take notice that on May 11, 2017,
Northwest Pipeline, LLC (Northwest),
295 Chipeta Way, Salt Lake City, Utah
84108, has filed an application pursuant
to section 7(b) and 7(c) of the Natural
Gas Act (NGA) and the Federal Energy
Regulatory Commission’s (Commission)
regulations, requesting abandonment
approvals, and a certificate of public
convenience seeking authorization to
construct and operate its North Seattle
Lateral Upgrade Project (Project) located
in Snohomish County, Washington, all
as more fully described in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, the Project consists of:
(1) Abandoning by removal the existing
8-inch-diameter pipeline between
mileposts (MP) 2.2 and 8.8 on
Northwest’s North Seattle Delivery
Lateral line and installing new 20 inch
diameter pipeline from MP 1.9 to 8.8;
(2) rebuild the existing North Seattle/
Everett meter station; and (3) installing
miscellaneous appurtenances; all
located in Snohomish County,
Washington.
Any questions regarding this
application should be directed to Xan
Kotter, Northwest Pipeline LLC, P.O.
Box 58900, Salt Lake City, UT 84158–
0900, or call (801) 584–6496, or by
email: xan.g.kotter@williams.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
25283
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
E:\FR\FM\01JNN1.SGM
01JNN1
25284
Federal Register / Vol. 82, No. 104 / Thursday, June 1, 2017 / Notices
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE., Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on June 14, 2017.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11271 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–443–000]
mstockstill on DSK30JT082PROD with NOTICES
Notice of Request Under Blanket
Authorization: National Fuel Gas
Supply Corporation
Take notice that on May 16, 2017,
National Fuel Gas Supply Corporation
(National Fuel) 6363 Main Street,
Williamsville, New York 14221, filed a
prior notice application pursuant to
sections 157.205, and 157.216(b) of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Texas Gas’ blanket certificate issued in
Docket No. CP83–4–000. National Fuel
requests authorization to abandon
certain minor underground natural gas
storage facilities located at its Wharton
Storage Field, located in Potter County,
Pennsylvania. Specifically, National
Fuel proposes to plug and abandon one
injection/withdrawal storage well, Well
WH23, and abandon in place the
associated Well Line TRW23, all as
VerDate Sep<11>2014
18:32 May 31, 2017
Jkt 241001
more fully set forth in the application,
which is open to the public for
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Alice
A. Curtiss, Deputy General Counsel for
National Fuel, 6363 Main Street,
Williamsville, New York 14221, or
phone (716) 857–7075, or by email
curtissa@natfuel.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11269 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
FARM CREDIT ADMINISTRATION
Farm Credit Administration Board;
Sunshine Act; Regular Meeting
Farm Credit Administration.
SUMMARY: Notice is hereby given,
pursuant to the Government in the
Sunshine Act, of the regular meeting of
the Farm Credit Administration Board
(Board).
AGENCY:
The regular meeting of the Board
will be held at the offices of the Farm
Credit Administration in McLean,
Virginia, on June 8, 2017, from 9:00 a.m.
until such time as the Board concludes
its business.
FOR FURTHER INFORMATION CONTACT: Dale
L. Aultman, Secretary to the Farm
Credit Administration Board, (703) 883–
4009, TTY (703) 883–4056.
ADDRESSES: Farm Credit
Administration, 1501 Farm Credit Drive,
McLean, Virginia 22102–5090. Submit
attendance requests via email to
VisitorRequest@FCA.gov. See
SUPPLEMENTARY INFORMATION for further
information about attendance requests.
SUPPLEMENTARY INFORMATION: Parts of
this meeting of the Board will be open
to the public (limited space available),
and parts will be closed to the public.
DATES:
E:\FR\FM\01JNN1.SGM
01JNN1
Agencies
[Federal Register Volume 82, Number 104 (Thursday, June 1, 2017)]
[Notices]
[Pages 25283-25284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11271]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-441-000]
Northwest Pipeline LLC; Notice of Application
Take notice that on May 11, 2017, Northwest Pipeline, LLC
(Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, has filed an
application pursuant to section 7(b) and 7(c) of the Natural Gas Act
(NGA) and the Federal Energy Regulatory Commission's (Commission)
regulations, requesting abandonment approvals, and a certificate of
public convenience seeking authorization to construct and operate its
North Seattle Lateral Upgrade Project (Project) located in Snohomish
County, Washington, all as more fully described in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Specifically, the Project consists of: (1) Abandoning by removal
the existing 8-inch-diameter pipeline between mileposts (MP) 2.2 and
8.8 on Northwest's North Seattle Delivery Lateral line and installing
new 20 inch diameter pipeline from MP 1.9 to 8.8; (2) rebuild the
existing North Seattle/Everett meter station; and (3) installing
miscellaneous appurtenances; all located in Snohomish County,
Washington.
Any questions regarding this application should be directed to Xan
Kotter, Northwest Pipeline LLC, P.O. Box 58900, Salt Lake City, UT
84158-0900, or call (801) 584-6496, or by email:
xan.g.kotter@williams.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made in the proceeding with the Commission
and must mail a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the
[[Page 25284]]
Secretary of the Commission. Environmental commentors will be placed on
the Commission's environmental mailing list, will receive copies of the
environmental documents, and will be notified of meetings associated
with the Commission's environmental review process. Environmental
commentors will not be required to serve copies of filed documents on
all other parties. However, the non-party commentors will not receive
copies of all documents filed by other parties or issued by the
Commission (except for the mailing of environmental documents issued by
the Commission) and will not have the right to seek court review of the
Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on June 14, 2017.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-11271 Filed 5-31-17; 8:45 am]
BILLING CODE 6717-01-P